    • Construction progress management support system and method
    • 建筑进度管理支持系统与方法
    • JP2013045308A
    • 2013-03-04
    • JP2011183171
    • 2011-08-24
    • Mitsubishi Heavy Ind Ltd三菱重工業株式会社
    • ODAKA SHIGETAKANOMA AKIRATERASAWA YOSHINORIYAMAMURA KAZUOIKEDA KAZUNARITABUCHI MASAAKI
    • G06Q50/08E04G21/00G06Q10/06
    • Y04S10/54
    • PROBLEM TO BE SOLVED: To provide a construction progress management support system and method for promptly and easily acquiring necessary result information from a huge amount of information, and exactly predicting construction progress later than the present point of time on the basis of the result information.SOLUTION: A construction progress management support system 1 for managing progress of a construction work for constructing one or a plurality of structures by a plurality of processes includes: storage means 2 in which a construction work plan 3 consisting of the plurality of processes, progress information on the construction work plan, and a projection plan 4 of resources including persons or heavy equipment are accumulated; result information acquisition means 11 for acquiring progress ratio of the respective processes of the construction work, and projection results of the resources via input means 7 or communication means; production rate investigation means 13 for determining a future production rate of the construction work by comparing a result production rate to be converted from the projection results of the resources with a plan production rate to be converted from the projection plan of the resources; and remaining workload calculation means 14 for calculating the remaining object amount and a workload calculated by the result information acquisition means on the basis of the future production rate calculated by the production rate investigation means.
    • 要解决的问题:提供一种施工进度管理支持系统和方法,可以从大量信息中快速,轻松地获取必要的结果信息,并且在当前时间点之后,基于 结果信息。 解决方案:用于管理通过多个过程构造一个或多个结构的施工工作进度的施工进度管理支持系统1包括:存储装置2,其中由多个处理组成的构造工作计划3 累计建设工作计划进度信息,人员或重型设备等资源预测计划4; 结果信息获取装置11,用于获取构建工作的各个处理的进度比,以及经由输入装置7或通信装置的资源的投影结果; 生产率调查手段13,用于通过将资源预测结果与要从资源投影计划转换的计划生产率进行比较,确定未来生产效率; 以及剩余工作量计算单元14,用于根据由生产率调查单元计算的未来生产率计算由结果信息获取单元计算出的剩余对象量和工作量。 版权所有(C)2013,JPO&INPIT