热词
    • 1. 发明专利
    • Construction method for column of towering structure
    • 塔式结构柱施工方法
    • JP2012092534A
    • 2012-05-17
    • JP2010239345
    • 2010-10-26
    • Mitsui Eng & Shipbuild Co Ltd三井造船株式会社
    • MINAMI YOICHIKAWAMOTO ATSUSHIONO JUNJIOGIWARA TAKESHINISHIMURA MASAZUMIKANETOMO MIKIO
    • E04H12/08B66C23/28B66C23/32
    • PROBLEM TO BE SOLVED: To reduce a construction period and suppress costs in a construction method in which a telescopic boom to be mounted with a construction crane is supported on stacked column members by remote control when constructing a towering structure such as a multi-storied column or tower.SOLUTION: A wind turbine tower 20 is constructed by supporting a telescopic boom 1 on support members 2 by means of a telescopic boom support device 3 assembled to the telescopic boom 1 while stacking the column members 2. The telescopic boom 1 is brought by a carrier truck 13 and the telescopic boom support device 3 is brought by carrier vehicles 11, 12 into the construction site. The telescopic boom support device 3 is assembled to the telescopic boom 1 by an auxiliary crane 14, the column member 2a of a first stage is hung and installed, and a jib crane 15 is mounted on the tip of the telescopic boom 1. Thereafter, stacking of the column members 2 is performed by the jib crane 15.
    • 要解决的问题:为了减少施工时间并降低在搭建起重机上安装的伸缩臂的吊架在构造高层结构时通过遥控来支撑在堆叠柱构件上的成本 固定柱或塔。 解决方案:风力涡轮机塔架20通过在组装到伸缩式起重机1上的伸缩式起重臂支撑装置3支撑支撑构件2上而构成,同时堆叠柱构件2.将伸缩式起重臂1带入 由承载车13和伸缩臂支撑装置3由运载工具11,12带到施工现场。 伸缩臂支撑装置3通过辅助起重机14组装到伸缩臂1上,悬挂并安装第一级的柱构件2a,并且在伸缩臂1的顶端上安装起重臂15。 柱构件2的堆叠由起重机15执行。版权所有:(C)2012,JPO&INPIT
    • 2. 发明专利
    • Support device of telescopic boom for mounting crane for construction of tower structure
    • 用于安装塔式结构的安装起重机的支撑装置
    • JP2012091897A
    • 2012-05-17
    • JP2010239344
    • 2010-10-26
    • Mitsui Eng & Shipbuild Co Ltd三井造船株式会社
    • MINAMI YOICHIKAWAMOTO ATSUSHIONO JUNJIOGIWARA TAKESHINISHIMURA MASAZUMIKANETOMO MIKIO
    • B66C23/20
    • PROBLEM TO BE SOLVED: To stabilize a telescopic boom to construct a high column, by making the telescopic boom be sequentially supported on stacked column members, wherein the telescopic boom is for mounting a crane used for construction of tower structure such as highly-stacked columns and a tower.SOLUTION: A column receiving base 6 is disposed to be movable forward and backward to a mounting base 5 fixed to each boom of the telescopic boom 1, and the column receiving base 6 is provided with a pair of holding arms 7 swinging between a holding position holding the column member 2 and a release position releasing the column member 2. A roller chain 8 is disposed inside the holding arm 7 so that a diameter of the roller chain 8 can be reduced and the roller chain is linked to the holding arm 7. When the column receiving base 6 is moved forward to press against the column member 2, the column member 2 is held by the holding arms 7, and a chain opening/closing cylinder 8a is operated to pull in the roller chain 8 and reduce the diameter thereof, the roller chain 8 tightens up the column member 2, and the boom is supported by the column member 2.
    • 要解决的问题:为了稳定伸缩臂来构造高柱,通过使伸缩臂顺序地支撑在堆叠柱构件上,其中伸缩臂用于安装用于塔结构的构造的起重机,例如高度 堆叠的塔和塔。 解决方案:柱接收基座6设置成能够向前和向后移动到固定到伸缩臂1的每个悬臂上的安装基座5,并且柱接收基座6设置有一对保持臂7, 保持柱构件2的保持位置和释放柱构件2的释放位置。滚子链8设置在保持臂7内部,使得滚子链8的直径可以减小,并且滚子链与保持 当柱接收基座6向前移动以压靠柱构件2时,柱构件2被保持臂7保持,并且操作链条打开/关闭气缸8a以拉动滚子链8和 减小其直径,滚子链条8收紧柱构件2,并且悬臂由柱构件2支撑。版权所有(C)2012,JPO&INPIT