    • 4. 发明申请
    • System and method for fabrication backup planning
    • 制造备份计划的制度和方法
    • US20050216110A1
    • 2005-09-29
    • US10809568
    • 2004-03-25
    • Ju-Kau ChenChao-Fan ChangGwo-Chiang Fang
    • Ju-Kau ChenChao-Fan ChangGwo-Chiang Fang
    • G05B19/418G06F19/00
    • G05B19/41865Y02P90/20
    • A backup planning device within a fabrication system. The backup planning device schedules backup operations between separately located fabrication facilities by introducing a virtual tool. The capacity of the virtual tool is combined into first capacity information of a tool group to generate second capacity information thereof accordingly. The first capacity information comprises capacity information of effective tools in the respective tool group, while the second capacity information comprises capacity information of effective tools plus the virtual tool thereof. A first manufacturing plan for the tool group is determined according to a master production schedule, a WIP profile, and the second capacity information thereof. A second manufacturing plan is determined according to the workload allocation of the virtual tool in the first manufacturing plan.
    • 制造系统中的备用计划设备。 备份计划设备通过引入虚拟工具安排在分开的制造设施之间的备份操作。 虚拟工具的容量被组合成工具组的第一容量信息,从而相应地生成第二容量信息。 第一容量信息包括相应工具组中的有效工具的容量信息,而第二容量信息包括有效工具的容量信息及其虚拟工具。 根据主生产计划,WIP简档和其第二容量信息来确定工具组的第一制造计划。 根据第一制造计划中的虚拟工具的工作量分配来确定第二制造计划。
    • 5. 发明授权
    • System and method for fabrication backup planning
    • 制造备份计划的制度和方法
    • US07031786B2
    • 2006-04-18
    • US10809568
    • 2004-03-25
    • Ju-Kau ChenChao-Fan ChangGwo-Chiang Fang
    • Ju-Kau ChenChao-Fan ChangGwo-Chiang Fang
    • G06F19/00
    • G05B19/41865Y02P90/20
    • A backup planning device within a fabrication system. The backup planning device schedules backup operations between separately located fabrication facilities by introducing a virtual tool. The capacity of the virtual tool is combined into first capacity information of a tool group to generate second capacity information thereof accordingly. The first capacity information comprises capacity information of effective tools in the respective tool group, while the second capacity information comprises capacity information of effective tools plus the virtual tool thereof. A first manufacturing plan for the tool group is determined according to a master production schedule, a WIP profile, and the second capacity information thereof. A second manufacturing plan is determined according to the workload allocation of the virtual tool in the first manufacturing plan.
    • 制造系统中的备用计划设备。 备份计划设备通过引入虚拟工具安排在分开的制造设施之间的备份操作。 虚拟工具的容量被组合成工具组的第一容量信息,从而相应地生成第二容量信息。 第一容量信息包括相应工具组中的有效工具的容量信息,而第二容量信息包括有效工具的容量信息及其虚拟工具。 根据主生产计划,WIP简档和其第二容量信息来确定工具组的第一制造计划。 根据第一制造计划中的虚拟工具的工作量分配来确定第二制造计划。
    • 6. 发明申请
    • Fabrication monitoring system
    • 制造监控系统
    • US20050216113A1
    • 2005-09-29
    • US10811087
    • 2004-03-25
    • Chin-Cheng PanChao-Fan ChangPai-Cheng HuangOliver Wu
    • Chin-Cheng PanChao-Fan ChangPai-Cheng HuangOliver Wu
    • G06F19/00H01L21/00
    • H01L21/67276
    • System and method for monitoring a fabrication process. Generally, an actual-to-planned variance is calculated by determining a daily part index as a percentage of the delta between the planned quantity and the actual quantity over the planned quantity. A weekly part index is calculated by averaging the daily part index over a predetermined time period. From the weekly part index, a site index is determined that takes into account products fabricated at a particular site. Furthermore, a planned-to-actual variance may be calculated by determining a daily part index as a percentage of the delta between the planned quantity and the actual quantity over the actual quantity. A weekly part index is calculated by averaging the daily part index over a predetermined time period. From the weekly part index, a site index is determined that takes into account products fabricated at a particular site.
    • 用于监控制造过程的系统和方法。 一般来说,实际计划的差异是通过将每日零件指数作为计划数量和实际数量之间的增量百分比来计算的。 通过在预定时间段内平均每日零件指数来计算每周零件指数。 从每周零件指数来看,确定了一个考虑到在特定场地制造的产品的站点索引。 此外,可以通过将每日零件指数确定为实际数量之间的计划数量和实际数量之间的差值的百分比来计算计划实际差异。 通过在预定时间段内平均每日零件指数来计算每周零件指数。 从每周零件指数来看,确定了一个考虑到在特定场地制造的产品的站点索引。
    • 7. 发明授权
    • Fabrication monitoring system
    • 制造监控系统
    • US07127314B2
    • 2006-10-24
    • US10811087
    • 2004-03-25
    • Chin-Cheng PanChao-Fan ChangPai-Cheng HuangOliver Wu
    • Chin-Cheng PanChao-Fan ChangPai-Cheng HuangOliver Wu
    • G06F19/00
    • H01L21/67276
    • System and method for monitoring a fabrication process. Generally, an actual-to-planned variance is calculated by determining a daily part index as a percentage of the delta between the planned quantity and the actual quantity over the planned quantity. A weekly part index is calculated by averaging the daily part index over a predetermined time period. From the weekly part index, a site index is determined that takes into account products fabricated at a particular site. Furthermore, a planned-to-actual variance may be calculated by determining a daily part index as a percentage of the delta between the planned quantity and the actual quantity over the actual quantity. A weekly part index is calculated by averaging the daily part index over a predetermined time period. From the weekly part index, a site index is determined that takes into account products fabricated at a particular site.
    • 用于监控制造过程的系统和方法。 一般来说,实际计划的差异是通过将每日零件指数作为计划数量和实际数量之间的增量百分比来计算的。 通过在预定时间段内平均每日零件指数来计算每周零件指数。 从每周零件指数来看,确定了一个考虑到在特定场地制造的产品的站点索引。 此外,可以通过将每日零件指数确定为实际数量之间的计划数量和实际数量之间的差值的百分比来计算计划实际差异。 通过在预定时间段内平均每日零件指数来计算每周零件指数。 从每周零件指数来看,确定了一个考虑到在特定场地制造的产品的站点索引。