会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • APPARATUS AND METHOD FOR PERFORMING HANDOVER IN ADVANCED MOBILE COMMUNICATION SYSTEM
    • 在高级移动通信系统中执行切换的装置和方法
    • US20110142008A1
    • 2011-06-16
    • US12837858
    • 2010-07-16
    • Sung Gu CHOI
    • Sung Gu CHOI
    • H04W4/00
    • H04W36/04H04W36/32
    • An apparatus for performing handover in an advanced mobile communication system which provides traffic service to a mobile terminal in a multiple cell environment, the apparatus includes: a handover control unit for recognizing cell determination parameters based on terminal status information collected from the mobile terminal and/or information on traffic provided to the mobile terminal; a handover determination unit for assigning predetermined weights to each of the cell determination parameters when handover is required; a cell selection control unit for determining importance of each of the cell determination parameters based on the assigned weights and generating cell selection information for selecting a candidate cell for handover, which is the most optimal for the cell determination parameters in the order of the importance, among cells adjacent to a serving cell to which the mobile terminal belongs; and a handover execution unit for executing the handover based on the cell selection information.
    • 一种用于在多小区环境中向移动终端提供业务服务的高级移动通信系统中进行切换的装置,所述装置包括:切换控制单元,用于基于从所述移动终端收集的终端状态信息来识别小区确定参数和/ 或提供给移动终端的业务的信息; 切换确定单元,用于在需要切换时向每个小区确定参数分配预定权重; 小区选择控制单元,用于基于所分配的权重来确定每个小区确定参数的重要性,并且生成用于选择用于切换的候选小区的小区选择信息,所述小区选择信息对于重要性的顺序的小区确定参数是最佳的, 在与移动终端所属的服务小区相邻的小区中; 以及切换执行单元,用于基于小区选择信息执行切换。
    • 7. 发明申请
    • MOBILE COMMUNICATION SYSTEM FOR DISTRIBUTED LOAD CONTROL AND DISTRIBUTED LOAD CONTROL METHOD FOR USE IN THE SAME
    • 用于分布式负载控制和分布式负载控制方法的移动通信系统
    • US20120163168A1
    • 2012-06-28
    • US13330141
    • 2011-12-19
    • Sung Gu CHOI
    • Sung Gu CHOI
    • H04L12/26
    • H04W28/08H04W28/0289H04W48/16H04W72/00H04W76/10H04W88/08
    • A base station determines whether the base station is in an overload state on the basis of an available resource of the base station and a load state of a mobility management entity (MME), and transmits the call setup request to MME if the base station is determined to be in a non-overload state. MME determines whether MME is in the overload state on the basis of an available resource of MME and a load state of a gateway according to the call setup request transmitted from the base station, and transmits the call setup request to the gateway if MME is determined to be in the non-overload state. The gateway determines whether the gateway is in the overload state according to the call setup request transmitted from MME, and performs a call setup procedure if the gateway is determined to be in the non-overload state.
    • 基站基于基站的可用资源和移动性管理实体(MME)的负载状态来确定基站是否处于过载状态,并且如果基站是基站则将该呼叫建立请求发送到MME 确定处于非过载状态。 MME根据从基站发送的呼叫建立请求,基于MME的可用资源和网关的负载状态来确定MME是否处于过载状态,并且如果MME被确定则将该呼叫建立请求发送到网关 处于非过载状态。 网关根据从MME发送的呼叫建立请求来确定网关是否处于过载状态,并且如果确定网关处于非过载状态,则执行呼叫建立过程。