会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Design-build order system of concrete skeleton
    • 混凝土设计制造订单系统
    • JP2003013495A
    • 2003-01-15
    • JP2001201188
    • 2001-07-02
    • Nishimatsu Constr Co LtdReiji Tanaka礼治 田中西松建設株式会社
    • NISHIURA NORIAKIMIYASHITA TAKESHITANAKA REIJI
    • E04B1/21E04G21/00
    • PROBLEM TO BE SOLVED: To provide a design-build order system utilized for constructing a concrete skeleton including a design and execution from the order of members by precasting the whole building.
      SOLUTION: In the construction of the concrete skeleton 11, the members in beams, columns, connecting sections 4 or the like constituting the concrete skeleton 11 are mass-produced and stored previously in a factory or the like prior to the construction of the concrete skeleton as precast column members 2, precast beam members and beam-column connection joints 1. The design-build order system of the design of the members after the concrete skeleton 11 must be constructed and the selection of the required members from the mass-produced members is adopted. Accordingly, the work sharing of the design side designing the concrete skeleton 11 and the factory side manufacturing the members is enabled, and productivity is improved.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:通过预制整个建筑物,提供用于构建包括设计和执行在内的具体骨架的设计构造订单系统。 解决方案:在混凝土骨架11的构造中,构成混凝土骨架11的梁,柱,连接部4等中的构件在构造混凝土骨架之前,先以工厂等大量生产和储存 作为预制柱构件2,预制梁构件和梁 - 柱连接接头1.必须构造在混凝土骨架11之后的构件的设计的设计构造顺序系统,并且从大量生产的构件中选择所需的构件 被采纳。 因此,能够进行设计侧设计混凝土骨架11和工厂侧的构件的工作共享,并提高生产率。
    • 3. 发明专利
    • Chipping method and chipping device
    • 切割方法和切割装置
    • JP2005273184A
    • 2005-10-06
    • JP2004084589
    • 2004-03-23
    • Nishimatsu Constr Co Ltd西松建設株式会社
    • MIYASHITA TAKESHI
    • E04F21/00B28D1/18E04G23/08
    • PROBLEM TO BE SOLVED: To provide a chipping method and a chipping device capable of providing a uniform cutting trace having the predetermined depth, by completely exposing a concrete skeleton surface, by starting work from an optional position.
      SOLUTION: This chipping device 10 moves a core boring machine 20 in the triaxial direction of the x-axis direction vertical to a surface of a concrete skeleton 1, the y-axis direction or the z-axis direction parallel and mutually vertical to the surface of the concrete skeleton 1. A cutting groove 3 cut on a concrete surface can be expanded in a width in the z-axis direction by its moving distance z
      1 by performing operation moving the core boring machine 20 by a distance z
      1 not more than a diameter of a cutting edge 21 in the z axis direction every time when forming the cutting groove 3 by alternately repeating a predetermined frequency of operation for cutting the surface of the concrete skeleton 1 up to the predetermined depth x
      1 by the core boring machine 20 and operation for moving the core boring machine 20 by a predetermined distance y
      1 in the y axis direction.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:通过从可选位置开始工作,通过完全暴露混凝土骨架表面来提供能够提供具有预定深度的均匀切割迹线的切屑方法和切屑装置。 解决方案:该切屑装置10使芯镗床20沿与x轴方向的三轴方向垂直于混凝土骨架1的表面移动,y轴方向或z轴方向平行且相互垂直 在混凝土骨架1的表面上,切割在混凝土表面上的切割槽3可以通过使钻芯移动移动而使z轴方向的宽度扩大其移动距离z 1 每当通过交替重复用于切割切割槽3的表面的预定操作频率来形成切割槽3时,z轴方向上的距离z 1 不超过切削刃21的直径 通过镗孔机20将混凝土骨架1直到预定深度x 1 ,以及使镗孔机20在y轴上移动预定距离y 1 方向。 版权所有(C)2006,JPO&NCIPI
    • 5. 发明专利
    • Structure and method for joining girder and beam together
    • 用于连接GIRDER和BEAM TOGETHER的结构和方法
    • JP2007191884A
    • 2007-08-02
    • JP2006009750
    • 2006-01-18
    • Nishimatsu Constr Co Ltd西松建設株式会社
    • TAKAHASHI KOJIMIYASHITA TAKESHIIIZUKA SHINICHIKANEKAWA MOTOI
    • E04B1/24E04B1/58
    • PROBLEM TO BE SOLVED: To save labor for construction and shorten a construction period, when a girder and a beam are joined together.
      SOLUTION: A protrusion with a head is formed on a girder joining plate part which is vertically provided in the side part of the girder. A locking hole for locking the protrusion is formed in a beam joining plate part which is vertically provided at the end of the beam. The locking hole comprises an insertion part into which a head of the protrusion can be inserted, and a locking part which continues into the insertion part so as to be elongated upward, and to which the head of the protrusion can be locked. An inclined part, in which the amount of the protrusion of the beam joining plate part from a side surface is increased upward, is formed at the peripheral edge of the locking part. The beam is moved toward the girder so that the head of the protrusion can be inserted into the insertion part, and so that the head of the protrusion can be locked to the locking part. The inclined part is fastened by being pushed into a section between the head of the protrusion and the side surface of the girder joining plate part, so that the girder joining plate part and the beam joining plate part can be joined together.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了节省施工时间,缩短施工期间,将梁和梁连接在一起。 解决方案:具有头部的突起形成在竖直设置在梁的侧部中的梁连接板部分上。 用于锁定突起的锁定孔形成在垂直设置在梁的端部处的梁接合板部分中。 锁定孔包括插入部件,突出部的头部可以插入到该插入部分中,以及锁定部件,其延伸到插入部分中以便向上伸长,并且突出部分的头部可以锁定到该插入部分。 在锁定部的周缘形成有倾斜部,其中梁接合板部从侧面的突出量向上增加。 梁朝向梁移动,使得突起的头部能够插入到插入部分中,并且使得突起的头部可以锁定到锁定部分。 倾斜部分通过被推入突起的头部和梁连接板部分的侧表面之间的部分被紧固,使得梁连接板部分和梁接合板部分可以接合在一起。 版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • Beam-column connection joint and beam-column connection method
    • 梁柱连接接头和梁柱连接方法
    • JP2003013493A
    • 2003-01-15
    • JP2001201187
    • 2001-07-02
    • Nishimatsu Constr Co LtdReiji Tanaka礼治 田中西松建設株式会社
    • NISHIURA NORIAKIMIYASHITA TAKESHITANAKA REIJI
    • E04B1/16E04B1/58E04C3/20E04C5/02
    • PROBLEM TO BE SOLVED: To provide a beam-column connection joint, a beam-column connection method and an execution method for executing a concrete skeleton more easily by using a precast member. SOLUTION: The beam-column connection joint 1 having vertical joint bars 8 and horizontal joint bars 9 fixed in fixed length in a precast column member 2 and a precast beam member 3 and shear reinforcing bars 10 assembled to the vertical joint bars 9 is manufactured. A plurality of the beam-column connection joints 1 corresponding to the precast column member 2 and the precast beam member 3 are manufactured previously from the member 2 and the member 3 and computation, experimentation or the like, and the beam-column connection joint 1 mounted on the connection section 4 of a desired member is also selected by selecting the desired member from a plurality of the manufactured members when the concrete skeleton 11 must be executed. The concrete skeleton 11 can be executed more easily by the precast column member 2 and the precast beam member 2 by the above-mentioned processes.
    • 要解决的问题:提供一种梁柱连接接头,梁柱连接方法和通过使用预制构件更容易地执行混凝土骨架的执行方法。 解决方案:制造具有垂直接头杆8和固定长度固定在预制柱构件2中的水平接头杆9和装配到垂直接头杆9的预制梁构件3和剪切钢筋10的梁 - 柱连接接头1。 预先从构件2和构件3制造对应于预制柱构件2和预制梁构件3的多个梁 - 柱连接接头1以及计算,实验等,并且梁 - 柱连接接头1 当必须执行混凝土骨架11时,通过从多个制造的构件中选择所需的构件来选择安装在期望构件的连接部分4上。 通过上述工艺,预制柱构件2和预制梁构件2可以更容易地执行混凝土骨架11。