会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • Fracturing method providing simultaneous flow back
    • 压裂方法提供同时回流
    • US20060196667A1
    • 2006-09-07
    • US11072725
    • 2005-03-04
    • Ruben AlbaRaymund MeijsGary WaltersL. Farabee
    • Ruben AlbaRaymund MeijsGary WaltersL. Farabee
    • E21B43/26
    • E21B43/26E21B33/128E21B43/14
    • The present invention is directed to a bottom-up method of fracturing a multi-zone subterranean formation intersected by a wellbore that enables one zone to be fractured while at the same time flowing previously placed fracture fluid from one or more other zones back to the surface. The method employs a bottom-hole assembly (“BHA”) that is attached to the bottom end of a tubing string. The BHA includes a hydra jetting sub, a centralizer, a packer and valve sub. The hydra jetting sub is used to perforate and initiate the fracture in the zones of interest. The zones are fractured by pumping fracturing fluid down the annulus formed between the tubing string and the wellbore. The previously placed fracture fluid flows back to the surface through the tubing string. It enters through the valve sub in the BHA.
    • 本发明涉及一种自下而上的方法,用于压裂由井眼相交的多区域地层,其使得一个区域能够断裂,同时将来自一个或多个其它区域的先前放置的断裂流体回流到表面 。 该方法采用连接到油管柱底端的底孔组件(“BHA”)。 BHA包括Hydra喷射子,扶正器,封隔器和阀门。 Hydra喷射sub用于在感兴趣的区域穿孔并发起断裂。 通过将压裂流体沿着在油管柱和井筒之间形成的环形空间进行压裂而使区域断裂。 先前放置的断裂流体通过油管柱回流到表面。 它通过BHA中的阀门进入。
    • 4. 发明申请
    • Methods of fracturing sensitive formations
    • 破碎敏感地层的方法
    • US20060000610A1
    • 2006-01-05
    • US11221544
    • 2005-09-08
    • Leldon FarabeeRuben Alba
    • Leldon FarabeeRuben Alba
    • E21B33/13
    • E21B43/261E21B43/114E21B43/25
    • An example of a method includes providing a hydrajetting tool in a well bore in a formation; injecting a fluid through the tool into a first region of the formation at a velocity sufficient to form one or more perforation tunnels; maintaining the flow of fluid into the perforation tunnels at a pressure greater than the fracture closure pressure, so as to create one or more fractures in the first region; plugging at least partially the fractures with an isolation fluid; injecting a fluid through the hydrajetting tool into a second region of the formation at a velocity sufficient to form one or more perforation tunnels in the second region; and maintaining the flow of fluid into the perforation tunnels in the second region at a pressure greater than the fracture closure pressure, so as to create one or more fractures in the second region.
    • 一种方法的实例包括在地层的井眼中提供水力喷射工具; 将流体通过所述工具以足以形成一个或多个穿孔的速度注入所述地层的第一区域; 在大于裂缝闭合压力的压力下保持流体流入穿孔隧道,以便在第一区域中产生一个或多个裂缝; 用隔离液至少部分堵塞骨折; 将流体通过所述水力喷射工具注入到所述地层的第二区域中,其速度足以在所述第二区域中形成一个或多个穿孔隧道; 以及在大于所述断裂闭合压力的压力下将所述流体的流动维持在所述第二区域中的所述穿孔隧道中,以便在所述第二区域中产生一个或多个裂缝。