会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Optimization of integration flow plans
    • 整合流程图优化
    • US08745038B2
    • 2014-06-03
    • US12712943
    • 2010-02-25
    • Alkiviadis SimitsisWilliam K. WilkinsonUmeshwar DayalMaria G. Castellanos
    • Alkiviadis SimitsisWilliam K. WilkinsonUmeshwar DayalMaria G. Castellanos
    • G06F17/30
    • G06Q10/06
    • Computer-based methods, computer-readable storage media and computer systems are provided for optimizing integration flow plans. An initial integration flow plan, one or more objectives and/or an objective function related to the one or more objectives may be received as input. A computing cost of the initial integration flow plan may be compared with the objective function. Using one or more heuristics, a set of close-to-optimal integration flow plans may be identified from all possible integration flow plans that are functionally equivalent to the initial integration flow plan. A close-to-optimal integration flow plan with a lowest computing cost may be selected from the set as a replacement for the initial integration flow plan.
    • 提供基于计算机的方法,计算机可读存储介质和计算机系统,用于优化集成流程图。 可以接收初始集成流程图,与一个或多个目标相关的一个或多个目标和/或目标函数作为输入。 可以将初始集成流程图的计算成本与目标函数进行比较。 使用一个或多个启发式,可以从功能上等同于初始集成流程图的所有可能的集成流程图中识别出一组接近最优化的集成流程图。 可以从集合中选择具有最低计算成本的接近最优的集成流程计划,作为初始集成流程图的替代。
    • 5. 发明申请
    • OPTIMIZER
    • 优化器
    • US20130096967A1
    • 2013-04-18
    • US13274315
    • 2011-10-15
    • Alkiviadis SimitsisWilliam K. WilkinsonUmeshwar Dayal
    • Alkiviadis SimitsisWilliam K. WilkinsonUmeshwar Dayal
    • G06Q10/04
    • G06Q10/04
    • A method and apparatus: (1) select and apply a transition from a set of first objective enhancing transitions to an initial information integration flow graph based upon how application of each transition impacts a length of a chain of nodes to produce a first set of modified information integration flow graphs that satisfy a first objective; (2) select and apply a second transition from the set of first objective transitions and a set of second objective enhancing transitions to the first set of modified information integration flow graphs to produce a second set of modified information integration flow graphs that satisfy the first objective and the second objective; and (3) identify an information integration flow graph from the first set and the second set having a lowest cost.
    • 一种方法和装置:(1)基于每个过渡的应用如何影响节点链的长度以产生第一组修改的,从一组第一目标增强转换到初始信息集成流程图的选择和应用转换 满足第一目标的信息集成流程图; (2)从第一目标转变集合和一组第二目标增强转换中选择并应用第二转换到第一组修改信息集成流程图,以产生满足第一目标的第二组修改信息集成流程图 和第二个目标; 和(3)从具有最低成本的第一组和第二组中识别信息集成流程图。