会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method of joining steel column and precast pile
    • 钢管和预制桩的加工方法
    • JP2007255006A
    • 2007-10-04
    • JP2006078955
    • 2006-03-22
    • Maeda CorpToyo Constr Co LtdZenitaka Corp前田建設工業株式会社東洋建設株式会社株式会社錢高組
    • KONNO OSAMUYAMASHITA SHUNEINARUSE TADASHIFUJISHIMA TAISUKEMINE CHIKAHITOIGARASHI HARUTOITO HITOSHIAOKI MASAYAMAZAKI TORU
    • E02D27/12E02D27/00E04B1/24
    • PROBLEM TO BE SOLVED: To provide a method of joining a steel column and a precast pile shortening a construction period and reducing cost by dispensing with a base plate, an anchor frame, or the like unlike a conventional method and absorbing a construction error of the precast pile in a reliable manner to improve work efficiency.
      SOLUTION: In the method of joining the steel column and the precast pile, an erection frame comprising vertical frames, a lower frame and an upper frame is installed in a predetermined horizontal position of the upper end of the precast pile. A plurality of first main reinforcements and a plurality of second main reinforcements shorter than the first main reinforcements are fixed to the upper end of the precast pile, and after winding hoops, concrete is placed to the lower part of the upper frame. After erecting the steel column to be inserted in the erection frame, third main reinforcements are joined to the second main reinforcements, and the hoops are wound. Concrete is then placed above the upper frame.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种连接钢柱和预制桩,缩短施工周期并且通过分配基板,锚架等而不同于常规方法并且吸收结构来降低成本 预制桩的误差可靠,提高工作效率。 解决方案:在连接钢柱和预制桩的方法中,将包括垂直框架,下框架和上框架的竖立框架安装在预制桩上端的预定水平位置。 多个第一主加强件和比第一主加固件短的多个第二主加固件固定到预制桩的上端,并且在缠绕箍之后,将混凝土放置在上框架的下部。 在竖立架设框架后的钢柱后,将第三主加强件连接到第二主加强件上,并将环箍缠绕。 然后将混凝土放置在上框架的上方。 版权所有(C)2008,JPO&INPIT
    • 3. 发明专利
    • Vibration reducing structure
    • 振动减振结构
    • JP2007100325A
    • 2007-04-19
    • JP2005288534
    • 2005-09-30
    • Maeda CorpZenitaka Corp前田建設工業株式会社株式会社錢高組
    • YOSHIDA TAKAHARUMORISHITA MASAYUKIFUJISHIMA TAISUKEMIZUTORI KAZUYUKINUNOBIKI HIDEOKUROSAWA TOSHIYA
    • E02D31/08
    • PROBLEM TO BE SOLVED: To provide a vibration reducing structure which enables a reduction in the number of materials for use and the shortening of a construction period by dispensing with the construction of an earth retaining wall etc. , and which can effectively reduce vibrations by using minimum necessary members.
      SOLUTION: This vibration reducing structure 10, which is equipped with an interception surface 15 for intercepting the vibrations V propagating through ground G, so as to reduce the vibrations V, is characterized as follows: the interception surface 15a and the like are composed of a plurality of columnar bodies 10a and the like, which are arranged in line; the columnar bodies 10a and the like are arranged at a predetermined angle of inclination in a vertical direction in the ground G; and the columnar bodies adjacent to each other are arranged at a predetermined interval.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种减振结构,其能够通过分配地土挡土墙等的结构来减少使用材料的数量和缩短施工周期,并且可以有效地减少 使用最少必要的成员进行振动。 解决方案:具有用于截取通过地面G传播的振动V的截止表面15以减少振动V的减振结构10的特征如下:拦截表面15a等 由多个柱状体10a等构成; 柱状体10a等在地面G中沿垂直方向以预定的倾斜角度布置; 并且彼此相邻的柱状体以预定间隔排列。 版权所有(C)2007,JPO&INPIT