会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • BACK FILLING EXCAVATOR AND BACK FILLING CONSTRUCTION METHOD USING IT
    • JPH10110600A
    • 1998-04-28
    • JP26619696
    • 1996-10-07
    • MITSUI CONSTRKOMATSU MFG CO LTD
    • HONDA MASATOISHIDA KIKUOKAWAHARA KEIICHIBANDO EIGO
    • E21D9/06E21F15/00
    • PROBLEM TO BE SOLVED: To eliminate the need of a buckling checking mechanism and reduce cycle time of back filling by separately forming a partition wall for longitudinally cutting off the internal space of a skin plate on an inner partition wall and an outer partition, and providing inner and outer turning jacks corresponding to the respective partition walls. SOLUTION: With an outer partition wall 14 pressed to an existing back filling material 19, an outer turning jack 16 is elongated to take reaction force in the existing back filling material 19, and an excavator main body 1 is advanced. Simultaneously while an inner partition wall 13 is pulled back by contraction of an inner turning jack 15, back filling material is injected between the inner partition wall 13 and the back filling material 19 through a back filling injection pipe 17. Accordingly, the advance of the excavator main body and injection of back filling material to the rear space of the partition wall are performed concurrently, so that the cycle time per one span can be reduced. Furthermore, as turning can be performed with the reaction force taken in the existing back filling material, it is not necessary to provide a buckling checking mechanism in the front of the partition wall.
    • 10. 发明专利
    • CONNECTION STRUCTURE OF ADIT STRUCTURE AND SHAFT STRUCTURE
    • JPH11287083A
    • 1999-10-19
    • JP10701898
    • 1998-04-02
    • MITSUI CONSTR
    • AIHARA ATSUOHONDA MASATO
    • E21D1/00E21D9/06
    • PROBLEM TO BE SOLVED: To prevent breakage of the connection part of an adit structure and a shaft structure by forming an adit structure housing part on a socket member provided on an adit excavation start part, annularly forming, inserting and fitting an adit structure in a stress distribution transmission space between the inner peripheral face of the housing part and the outer peripheral face of the structure, and filling the space with buffering material. SOLUTION: A socket 6 is fixed by being projected and extended on a shield start/ arrival part 12 formed on the side wall part 2b of an adit structure in the direction of tunnel construction, and the rear end of an hollow cylindrical sleeve part 6b is fixed and formed on the shield start/arrival part 12 on the socket 6. The connection part 9 of a shield tunnel covering body 3 is inserted and fitted to a sleeve part 6b, and a clearance space formed between the outer peripheral face of the shield tunnel lining body 3 and the inner peripheral face of the sleeve part 6b is filled with a buffering material 20. Relative displacement is produced between the shield tunnel lining body 3 and the adit structure 3 by vibration of an earthquake, since stress applied on the connection part is acted through the buffering material 20 from the sleeve part 6b, the stress is dispersed, and breakage of the lining body 3 can be prevented to the utmost.