会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • DEVICE AND METHOD FOR ADJUSTED MUDDY WATER TREATMENT
    • JPH09125395A
    • 1997-05-13
    • JP30840395
    • 1995-11-01
    • MINI PUBLIC WORKSNIPPON KENSETSUGIYOU KEIEI KYO
    • MIKI HIROSHIMORI NORIYUKIKUNO GOROTAKEDA KIHEE
    • E02D17/12C02F11/00
    • PROBLEM TO BE SOLVED: To sample the adjusted muddy water with a uniform specific gravity and particle size distribution by circulating the slurry matter obtained by adding stabilizing liquid or water to the sediment, into which foreign matter such as solidification material, concrete waste, or the like is mixed, in a circulating path so as to remove the foreign matter. SOLUTION: A slurry matter obtained by adding water to a waste soil in which foreign matter is mixed is circulated through a circulating path 10 by a circulating pump 11. In the circulating path 10, a turbulent flow part 15 provided with multiple projected parts on the bottom surface, a restricted path part 16 to partially increase a velocity, a deep part 17 to decrease the velocity, and a wall body 18 installed erectedly at the end part of the deep part 17 are arranged along the circulating direction. Also an adjusted muddy water B is taken into sampling tanks 13a, 13b, and 13c provided at relatively stable parts of flow behind the wall body 18 through sampling pipes 20. Because the adjusted muddy water B is larger in specific gravity as it goes further to the bottom of it, the gravity of the adjusted muddy water to be collected can be adjusted by changing the height of the sampling pipes 20. Thus foreign matter can be removed from the waste soil so as to provide the adjusted muddy water with a specified specific gravity.
    • 10. 发明专利
    • BURIED PIPE LAYING METHOD COPING WITH DIFFERENTIAL SETTLEMENT
    • JPH10122427A
    • 1998-05-15
    • JP27192296
    • 1996-10-15
    • MINI PUBLIC WORKS
    • MIKI HIROSHIMORI NORIYUKI
    • F16L1/024
    • PROBLEM TO BE SOLVED: To correct the gradient of a vitch main pipe by burying the vitch main pipe, surrounded by a surrounding body provided in a laying place, in the ground, then filling a hardening filler in the converged stage of ground subsidence and raising the vitch main pipe. SOLUTION: A vitch main pipe 6 is installed on a foundation member 5 in a laying place. Forms 16, 17 are provided around the periphery of the vitch main pipe 6 to previously provide space 11 corresponding to ground subsidence, above the vitch main pipe 6 to surround it, and fluidized earth 9 is filled between the forms 16, 17 to form a surrounding body 8. Fluidized earth 9 and earth to be refilled 10 are filled in regular order over the periphery of the surrounding body 8 to bury it. Afterwards, in the converged stage of ground subsidence with a space part 12 formed at the intermediate part of the vitch main pipe 6 and surrounding body 8, a hardening filler is filled in the space parts 11, 12 so as to raise the vitch main pipe 6 to straighten hanging. The gradient of the vitch main pipe 6 can thereby be corrected, so that waste and sediment are not accumulated.