会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • GATE BOARD TIGHTENING DEVICE
    • 闸板紧固装置
    • EP3269881A1
    • 2018-01-17
    • EP17167480.7
    • 2017-04-21
    • Liu, Hui-Hung
    • Liu, Hui-Hung
    • E02B7/22E02B7/54
    • E02B7/22E02B7/54
    • A gate board tightening device (2) is mountable in a main rail (81) of floodgate device (8) and includes a drive bar (3), a retention plate (4), and a first coupling seat (5) and a second coupling seat (6). The drive bar (3) has two ends respectively provided with a first connection terminal (31) and a second connection terminal (32). The first connection terminal (31) is coupled with the first coupling seat (5) and the second connection terminal (32) is coupled with the second coupling seat (6). The retention plate (4) is inserted into a tubular member (814) formed in the main rail (81) of the floodgate device (8) with the first coupling seat (5) mounted at one end of the main rail (81) of the floodgate device (8) and the second coupling seat (6) mounted at an opposite end of the main rail (81) of the floodgate device (8). When gate boards (82) of the floodgate device (8) are sequentially disposed in the coupling channel (811) of the main rail (81), an operation member (A) is inserted into a hole (312) formed in the first connection terminal (31) of the drive bar (3) and the operation member (A) is wrenched to cause the drive bar (3) to rotate in site for driving the retention plate (4) to horizontally push the gate boards (82) so that a powerful tight engagement is established between the gate boards (82) and a water-resistant strip (817) arranged in the main rail (81) of the floodgate device (8).
    • 一种门板紧固装置(2)可安装在闸门装置(8)的主轨道(81)中并包括驱动杆(3),保持板(4)和第一联接座(5)以及第二联接座 联接座(6)。 驱动杆(3)的两端分别设置有第一连接端子(31)和第二连接端子(32)。 第一连接端子(31)与第一连接座(5)连接,第二连接端子(32)与第二连接座(6)连接。 在第一连接座(5)安装在主轨道(81)的一端处时,保持板(4)插入形成在水闸装置(8)的主轨道(81)中的管状构件(814) 所述闸门装置(8)和所述第二联接座(6)安装在所述闸门装置(8)的主轨道(81)的相对端处。 当闸门装置(8)的闸板(82)依次设置在主轨道(81)的联接通道(811)中时,操作构件(A)插入形成于第一连接部 (3)的端子(31)和操作构件(A)被扳动以使驱动杆(3)在现场旋转以驱动保持板(4)以水平地推动门板(82) 在门板(82)和布置在水闸装置(8)的主轨道(81)中的防水条(817)之间建立强有力的紧密接合。