会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • EXCAVATION CONTROL SYTEM FOR HYDRAULIC EXCAVATOR
    • 液压挖掘机挖掘控制系统
    • US20140297040A1
    • 2014-10-02
    • US14355932
    • 2013-10-18
    • KOMATSU LTD.
    • Akinori BabaTetsuya NakayamaMasashi Ichihara
    • G05B13/02
    • G05B13/026E02F9/2037
    • An excavation control system includes a global coordinate computing device, a prediction correcting part, a cutting edge position data generating part, and a designed terrain data generating part. The global coordinate computing device generates revolving unit orientation data (Q) that indicates an orientation of a revolving unit. The prediction correcting part generates corrected revolving unit orientation data (R) by predictively correcting the revolving unit orientation data (Q) based on a delay time (t) and revolve angle speed data (Dω) that indicates a revolve angle speed (ω) of the revolving unit. The cutting edge position data generating part generates cutting edge position data (S) that indicates a position of a cutting edge based on reference position data (P1), the revolving unit orientation data (Q), and the corrected revolving unit orientation data (R). The designed terrain data generating part generates designed terrain data (U) based on the cutting edge position data (S) and stereoscopic designed terrain data (T).
    • 挖掘控制系统包括全局坐标计算装置,预测校正部,切削刃位置数据生成部以及设计的地形数据生成部。 全局坐标计算装置产生指示旋转单元的定向的旋转单元取向数据(Q)。 预测校正部通过基于延迟时间(t)和指示旋转角速度(ω)的旋转角速度数据(Dω)预测性地校正回转单位取向数据(Q)来生成校正旋转单元取向数据(R) 旋转单元。 切削刃位置数据生成部基于基准位置数据(P1),旋转单元取向数据(Q)和修正的旋转单元取向数据(R),生成表示切削刃的位置的切削刃位置数据(S) )。 设计的地形数据生成部基于切削刃位置数据(S)和立体设计的地形数据(T)生成设计的地形数据(U)。
    • 7. 发明授权
    • Excavation control system for hydraulic excavator
    • 液压挖掘机挖掘控制系统
    • US09411325B2
    • 2016-08-09
    • US14355932
    • 2013-10-18
    • KOMATSU LTD.
    • Akinori BabaTetsuya NakayamaMasashi Ichihara
    • G06F19/00G05B13/02E02F9/20
    • G05B13/026E02F9/2037
    • An excavation control system includes a global coordinate computing device, a prediction correcting part, a cutting edge position data generating part, and a designed terrain data generating part. The global coordinate computing device generates revolving unit orientation data (Q) that indicates an orientation of a revolving unit. The prediction correcting part generates corrected revolving unit orientation data (R) by predictively correcting the revolving unit orientation data (Q) based on a delay time (t) and revolve angle speed data (Dω) that indicates a revolve angle speed (ω) of the revolving unit. The cutting edge position data generating part generates cutting edge position data (S) that indicates a position of a cutting edge based on reference position data (P1), the revolving unit orientation data (Q), and the corrected revolving unit orientation data (R). The designed terrain data generating part generates designed terrain data (U) based on the cutting edge position data (S) and stereoscopic designed terrain data (T).
    • 挖掘控制系统包括全局坐标计算装置,预测校正部,切削刃位置数据生成部以及设计的地形数据生成部。 全局坐标计算装置产生指示旋转单元的定向的旋转单元取向数据(Q)。 预测校正部通过基于延迟时间(t)和指示旋转角速度(ω)的旋转角速度数据(Dω)预测性地校正回转单位取向数据(Q)来生成校正旋转单元取向数据(R) 旋转单元。 切削刃位置数据生成部基于基准位置数据(P1),旋转单元取向数据(Q)和修正的旋转单元取向数据(R),生成表示切削刃的位置的切削刃位置数据(S) )。 设计的地形数据生成部基于切削刃位置数据(S)和立体设计的地形数据(T)生成设计的地形数据(U)。