会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Method of production for a wiring harness job order
    • 线束工作订单的生产方法
    • US07275317B2
    • 2007-10-02
    • US10495744
    • 2002-10-30
    • Takeshi KamataMakoto KatsumataHitoshi UshijimaShigeharu SuzukiKeigo SugimuraKiyoshi Yagi
    • Takeshi KamataMakoto KatsumataHitoshi UshijimaShigeharu SuzukiKeigo SugimuraKiyoshi Yagi
    • H01R43/00H01R11/00
    • H01B13/012Y10T29/49117Y10T29/49169Y10T29/49174Y10T29/49194Y10T29/53209
    • An object of the present invention is to provide a wiring harness job-order production method and a wiring harness job-order production system, wherein a space for producing a wiring harness is reduced and the production efficiency of the wiring harness is improved. The wiring harness job-order production system 1 has a wiring harness assembling portion 15, an electric wire stock portion 13, and a parts stock portion 14. The wiring harness assembling portion 15 outputs wire amount data DT1 to the electric wire stock portion 13 when the wiring harness assembling portion 15 receives an order from a wiring harness ordering side 38. The wiring harness assembling portion 15 outputs parts amount data DT2 to the parts stock portion 14 when the wiring harness assembling portion 15 receives an order from the wiring harness ordering side 38. The electric wire stock portion 13 conveys a non-colored electric wire toward the wiring harness assembling portion 15. The parts stock portion 14 conveys non-colored parts toward the wiring harness assembling portion 15.
    • 本发明的目的是提供一种线束作业命令制作方法和线束作业命令生产系统,其中减少了用于制造线束的空间,并提高了线束的生产效率。 线束作业订单生产系统1具有线束组装部分15,电线原料部分13和部件原料部分14。 当线束组装部分15从线束订购侧38接收到订单时,线束组装部分15将线数据DT 1输出到电线原料部分13。 当线束组装部分15从线束订购侧38接收到订单时,线束组装部分15将零件数量DT 2输出到零件备件部分14。 电线原料部13向着线束组装部15输送无色电线。 零件存放部14向着线束组装部15输送无色部。
    • 4. 发明申请
    • Wire and wire harness order reception and production method, order reception and production system thereof, and wire crosslinking device
    • 电线和线束订单接收和生产方法,订单接收和生产系统以及电线交联装置
    • US20060191124A1
    • 2006-08-31
    • US10532664
    • 2003-07-15
    • Kiyoshi YagiMakoto KatsumataHitoshi Ushijima
    • Kiyoshi YagiMakoto KatsumataHitoshi Ushijima
    • B21B1/46G06F19/00
    • H01B13/012H01B3/443H01B13/34H01B13/345Y10T29/49123Y10T29/49982
    • Provided is an order-receiving production system and so on of a wire and wiring harness, by which the cost of the wire and a product using the wire can be prevented from increasing and the resource-saving can be attained. An order-receiving production system 1 of a wiring harness includes a wire-producing department 14, a wiring harness-assembling department 15 and a production control department 16. The production control department 16 forwards a first ordered quantity data D1, second ordered quantity data D2 and third ordered quantity data D3, each data meeting the received ordered data D, to a resin-producing department 44, core wire-producing department 45 and additive-producing department 46, respectively. The departments 44, 45 and 46 produce a pellet, core wire and additive with the respective necessary amount, respectively, and send them to the wire-producing department 14. The wire-producing department 14 extrudes a mixture of the pellets and additive onto a circumference of the core wire while simultaneously mixing the pellets and additive so that the core wire is coated with the mixture, and sends the wire produced to the wiring harness-assembling department 15 for assembling a wiring harness.
    • 提供了一种电线和线束的订单接收生产系统等,可以防止线材和使用线材的产品的成本增加并且可以实现资源节约。 线束的订单接收生产系统1包括线制造部14,线束组装部15和生产控制部16。 生产控制部门16将满足接收到的有序数据D的每个数据的第一订购量数据D 1,第二订购数据D 2和第三有序数据数据D 3转发到树脂制造部44,芯线生产部 45和添加剂生成部46。 部门44,45和46分别生产各种必需量的颗粒,芯线和添加剂,并将其送到生产部门14。 丝线生成部14将粒料和添加剂的混合物挤出到芯线的周围,同时将粒料和添加剂混合,使芯线涂布混合物,并将生产的丝线发送到线束组装 用于组装线束的部门15。
    • 5. 发明授权
    • Wire and wire harness order reception and production system
    • 电线和线束订单接收和生产系统
    • US07905010B2
    • 2011-03-15
    • US10532664
    • 2003-07-15
    • Kiyoshi YagiMakoto KatsumataHitoshi Ushijima
    • Kiyoshi YagiMakoto KatsumataHitoshi Ushijima
    • H01B13/20G06F19/00
    • H01B13/012H01B3/443H01B13/34H01B13/345Y10T29/49123Y10T29/49982
    • Provided is an order-receiving production system and so on of a wire and wiring harness, by which the cost of the wire and a product using the wire can be prevented from increasing and the resource-saving can be attained. An order-receiving production system 1 of a wiring harness includes a wire-producing department 14, a wiring harness-assembling department 15 and a production control department 16. The production control department 16 forwards a first ordered quantity data D1, second ordered quantity data D2 and third ordered quantity data D3, each data meeting the received ordered data D, to a resin-producing department 44, core wire-producing department 45 and additive-producing department 46, respectively. The departments 44, 45 and 46 produce a pellet, core wire and additive with the respective necessary amount, respectively, and send them to the wire-producing department 14. The wire-producing department 14 extrudes a mixture of the pellets and additive onto a circumference of the core wire while simultaneously mixing the pellets and additive so that the core wire is coated with the mixture, and sends the wire produced to the wiring harness-assembling department 15 for assembling a wiring harness.
    • 提供了一种电线和线束的订单接收生产系统等,可以防止线材和使用线材的产品的成本增加并且可以实现资源节约。 线束的订单接收生产系统1包括线制造部14,线束组装部15和生产控制部16.生产控制部16将第一有序数量D1,第二有序数量数据 D2和第三数量数据D3,每个数据满足接收到的有序数据D,分别到树脂制造部44,芯线制造部45和添加剂生成部46。 部门44,45和46分别产生各自所需量的颗粒,芯线和添加剂,并将其发送到生产部门14.线材生产部14将颗粒和添加剂的混合物挤出到 芯线的周长,同时混合粒料和添加剂,使得芯线涂覆有混合物,并将生产的线发送到用于组装线束的线束组装部分15。