会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 9. 发明授权
    • Image controllers and display devices
    • 图像控制器和显示设备
    • US08830306B2
    • 2014-09-09
    • US12683249
    • 2010-01-06
    • Cheng-Yi ChenPot-Sun LinYing-Jen ChenChun-Jui Wang
    • Cheng-Yi ChenPot-Sun LinYing-Jen ChenChun-Jui Wang
    • H04N15/00G09G3/00G02B27/26H04N13/04
    • G09G3/003G02B27/26H04N13/324H04N13/337
    • A representative display device includes a display module, a polarization controller and a compensator. Each pixel region of the display module has a first sub-pixel region, a second sub-pixel region and a third sub-pixel region respectively providing a first light, a second light and a third light of the same polarization. The polarization controller has control regions that control the polarization of the light passing therethrough. The compensator has first compensating regions, second compensating regions and third compensating regions corresponding to the first sub-pixel regions, the second sub-pixel regions and the third sub-pixel regions, respectively. The compensations of phase retardation of the first light, the second light and the third light generated by passing through the first compensating regions, the second compensating regions and the third compensating regions are different from one another.
    • 代表性的显示装置包括显示模块,偏振控制器和补偿器。 显示模块的每个像素区域具有分别提供具有相同偏振的第一光,第二光和第三​​光的第一子像素区域,第二子像素区域和第三子像素区域。 偏振控制器具有控制通过其中的光的偏振的控制区域。 补偿器具有分别对应于第一子像素区域,第二子像素区域和第三子像素区域的第一补偿区域,第二补偿区域和第三补偿区域。 通过第一补偿区域,第二补偿区域和第三补偿区域产生的第一光,第二光和第三​​光的相位延迟的补偿彼此不同。
    • 10. 发明申请
    • SYSTEM AND METHOD FOR ESTIMATING CONSTRUCTION DURATION
    • 用于估计施工期限的系统和方法
    • US20130335413A1
    • 2013-12-19
    • US13495286
    • 2012-06-13
    • Wei-Chih WangCheng-Yi ChenShao-Wei Weng
    • Wei-Chih WangCheng-Yi ChenShao-Wei Weng
    • G06T17/00
    • G06Q10/06
    • A system and method for estimating construction duration. The system includes a three-dimensional (3D) building information model (BIM) module, a duration estimation module, and a 4D BIM module. The 3D BIM module constructs a 3D BIM based on inputted modeling instructions and generates quantity information corresponding to the 3D BIM. The duration estimation module calculates duration information for construction work based on inputted construction condition information and the quantity information of the 3D BIM produced. The 4D BIM module constructs a 4D BIM based on the 3D BIM and the duration information. Thus, the present invention can automatically calculate the quantity of building materials, estimate the construction duration, establish a construction progress table, and demonstrate the construction progress of the 4D BIM in an animated way, replacing the traditional way of manually processing information for duration estimation.
    • 一种用于估计施工持续时间的系统和方法。 该系统包括三维(3D)建筑信息模型(BIM)模块,持续时间估计模块和4D BIM模块。 3D BIM模块基于输入的建模指令构建3D BIM,并生成与3D BIM对应的数量信息。 持续时间估计模块基于输入的构造条件信息和所生产的3D BIM的数量信息来计算施工作业的持续时间信息。 4D BIM模块基于3D BIM和持续时间信息构建4D BIM。 因此,本发明可以自动计算建筑材料的数量,估计施工时间,建立施工进度表,并以动画方式展示4D BIM的施工进度,取代传统的手动处理信息的方式进行持续时间估计 。