会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • SYSTEM AND METHOD FOR PLANNING A WELL PATH
    • 用于规划好路径的系统和方法
    • US20130140037A1
    • 2013-06-06
    • US13811828
    • 2011-06-29
    • Jose J. Sequeira, JR.Yao-Chou ChengRune Musum
    • Jose J. Sequeira, JR.Yao-Chou ChengRune Musum
    • E21B41/00E21B43/00
    • E21B41/0092E21B7/04E21B41/00E21B43/00E21B47/022G01V2210/66G01V2210/663
    • There is provided a system and method for planning a well path. An exemplary method comprises defining a proxy constraint volume as a three-dimensional (3D) cellular volume where each cell has at least one value derived from data from a 3D earth model. An initial well path is defined within user defined drilling parameter constraints. The exemplary method comprises defining acceptable constraint parameters to be applied to values derived from an intersection of the initial well path and the proxy constraint volume. If the intersection of the initial well path and the proxy constraint volume is not within the acceptable constraint parameters, the initial well path may be iteratively adjusted to create successive well paths until at least one of the successive well paths is within the acceptable constraint parameters for the values derived from the intersection of the well path and proxy constraint volume.
    • 提供了一种规划井道的系统和方法。 一种示例性方法包括将代理约束体定义为三维(3D)细胞体积,其中每个细胞具有从3D地球模型的数据导出的至少一个值。 用户定义的钻井参数约束中定义了初始井道。 示例性方法包括定义可应用于从初始井径和代理约束体积的交叉点导出的值的可接受约束参数。 如果初始井径和代理约束体积的交点不在可接受的约束参数内,则可以迭代地调整初始井道以创建连续的井径,直到至少一个连续的井道在可接受的约束参数内 从井径和代理约束体积的交集得到的值。