会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明授权
    • Determining a change schedule
    • 确定更改时间表
    • US07930202B2
    • 2011-04-19
    • US11421877
    • 2006-06-02
    • Vijay Krishnarao NaikBiplav Srivastava
    • Vijay Krishnarao NaikBiplav Srivastava
    • G06F9/46G06F11/34
    • G06Q10/06G06Q10/0631G06Q10/06311G06Q10/06312G06Q10/109
    • A method, system, and computer readable storage medium for determining a change schedule having multiple approvers with scheduling constraints. The constraints associated with each approver are analyzed to identify a set of candidate change schedules for each time period of a number of time periods. Weights for each approver over each of the time periods are assigned to each possible change schedule. Each approver is then asked to input preferences for each of the candidate change schedules. These preferences are then weighted for each candidate change schedule. A best change schedule is selected based on the weighted preferences of each approver for each of time periods.
    • 一种方法,系统和计算机可读存储介质,用于通过调度约束确定具有多个审批者的改变调度。 分析与每个批准者相关联的约束以识别多个时间段的每个时间段的一组候选变更时间表。 每个批准者在每个时间段的权重分配给每个可能的更改计划。 然后要求每个审批者输入每个候选变更日程表的偏好。 然后对每个候选变更时间表加权这些偏好。 基于每个批准者对每个时间段的加权偏好,选择最佳变更计划。