    • Water cutoff device for underground intrusion body, and underground intrusion body construction method using the same
    • 用于地下侵入体的水切割装置和使用其的地下侵入体构造方法
    • JP2008169594A
    • 2008-07-24
    • JP2007002976
    • 2007-01-11
    • Kanazawa Seisakusho:KkKimoto Rubber Kogyo KkToda Constr Co Ltd戸田建設株式会社木本ゴム工業株式会社株式会社金澤製作所
    • KODAMA MASABUMITONE MAKOTOHIUGA TOSHIYUKITADA KOJIUKEKAWA MAKOTOSHIMOZAKA KENJIASANO HITOSHIASAI YASUHIKOFUJIMORI HIDEOISHIMOTO NORIYOSHI
    • E21D13/00E02D31/04E21D13/04
    • PROBLEM TO BE SOLVED: To positively prevent leakage from a press-fitted portion of a steel shell element even under the condition of high ground-water pressure.
      SOLUTION: The steel shell element to be constructed in the ground has an open groove 20 formed therein beforehand, at a location where an earth retaining steel product 3 is to be press-fitted, that follows a cross sectional shape of the earth retaining steel product 3, and a water cutoff device 21 with a water cutoff member for blocking the open groove 20 is prepared. The water cutoff device 21 is formed of an easily breakable first water cutoff member 23 which ensures the water cutoff performance thereof before press-fitting of the earth retaining steel product 3, and a second water cutoff member 24 which is arranged above the first water cutoff member 23 across an interval, and ensures the water cutoff performance after press-fitting of the earth retaining steel product 3. The second water cutoff member 24 is formed of a lower-stage rubber packing 24A and an upper-stage rubber packing 24B which each have an open groove 24a following the cross sectional shape of the underground intrusion body, and the upper-stage rubber packing 24B is arranged at a location that is spaced away from the lower-stage rubber packing 24A.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:即使在高地下水压力的条件下,也可以肯定地防止钢壳元件的压入部分的泄漏。 解决方案:要在地面上构造的钢壳元件在其中预先形成有开口槽20,其中要在地面保持钢产品3被压配的位置处,其沿着地球的横截面形状 制备保持钢产品3,并且制备具有用于阻塞开口槽20的防水部件的截水装置21。 水切断装置21由容易破裂的第一水分截断构件23形成,该第一截水构件23在保持土壤保持钢制品3的压配合之前确保其截水性能;以及第二截水构件24,其布置在第一截水区域上方 构件23跨越间隔,并且确保接地保持钢制品3压配之后的截水性能。第二切水构件24由下级橡胶填料24A和上级橡胶填料24B形成, 具有跟随地下入侵体的横截面形状的开槽24a,并且上段橡胶填料24B布置在与下级橡胶填料24A间隔开的位置。 版权所有(C)2008,JPO&INPIT
    • 2. 发明专利
    • Apparatus for reforming existing pipe conduit
    • 改造现有管道设备的设备
    • JP2007292228A
    • 2007-11-08
    • JP2006121907
    • 2006-04-26
    • Kanazawa Seisakusho:KkToda Constr Co Ltd戸田建設株式会社株式会社金澤製作所
    • KODAMA MASABUMIHIUGA TOSHIYUKITONE MAKOTOUSAMI AKIRAFUJIMORI HIDEO
    • F16L1/00E03F7/00
    • PROBLEM TO BE SOLVED: To provide an apparatus for reforming an existing pipe conduit so as to construct a new pipe conduit while assembling segments in order on the inside surface of the existing pipe conduit.
      SOLUTION: A machine body capable of travelling inside the existing pipe conduit P is composed of a front side machine body 2A and a rear side machine body 2B. The front side machine body 2A and the rear side machine body 2B are expandably connected by means of an expansion jack 15 so as to relatively slide. The front side machine body 2A has front grippers 4, 4, ..., and the rear side machine body 2B has rear grippers 5, 5, .... The front side machine body 2A is provided with a water passage 6 for flowing the water in the existing pipe conduit, and also weir plates 7, 8 are provided at the front portion and the rear portion of the water passage 6 respectively. In addition, a rotary cleaning blush 11 having its rotation axis in the direction of the existing pipe conduit is arranged on the front side than the front weir plate 7, and an erector 12 capable of assembling the segments in the circumferential direction is arranged on the rear side than the rear side machine body 2B. Further, an end form 14 is provided for receiving back-filling material 13 to be poured between the segment rings configured so as to have a ring shape and the existing pipe conduit P.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种用于重整现有管道的装置,以便在现有管道管道的内表面上依次组装段,构造新的管道管道。 解决方案:能够在现有管道P内行进的机体由前侧机体2A和后侧机体2B构成。 前侧机体2A和后侧机体2B借助于膨胀千斤顶15可膨胀地相对滑动。 前侧机体2A具有前夹具4,4,...,后侧机体2B具有后夹具5,5,...。前侧机体2A设置有用于流动的水通道6 现有管道中的水以及堰板7,8分别设置在水道6的前部和后部。 此外,具有沿着现有管道的方向的旋转轴线的旋转清洁腮红11布置在比前堰板7的前侧上,并且能够在圆周方向上组装节段的竖立件12布置在 后侧比后侧机体2B。 此外,设置端部14,用于接收将被填充成环状的节环之间的倒填材料13和现有的管道P.版权所有(C)2008,JPO&INPIT