会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Control system and methods for managing a production operating under time constaraints
    • 控制系统和方法,用于管理在时间安排下生产的生产
    • US07054703B2
    • 2006-05-30
    • US10658826
    • 2003-09-09
    • Kan WuWei-Jai Hung
    • Kan WuWei-Jai Hung
    • G06F19/00
    • G05B19/41865G05B2219/32265Y02P90/20
    • A control system for a production process having a plurality of operations. A plurality of time constraints exist between the operations. The control system includes a control module that defines a plurality of sub-time constraints between each two operations, generates a plurality of equations according to the time constraints and the sub-time constraints, and calculates the sub-time constraints using the equations. The control module then determines whether a status for each operation defined according to a Work-In-Process (WIP) quantity between a first operation and a checked operation and a throughput rate thereof violates sub-time constraints between the first operation and the checked operation, and releases a lot into the production line if the status for each operation satisfies the corresponding sum of the sub-time constraints.
    • 一种用于具有多个操作的生产过程的控制系统。 操作之间存在多个时间约束。 控制系统包括一个控制模块,该控制模块在每个两个操作之间定义多个子时间约束,根据时间约束和子时间约束产生多个等式,并使用这些方程计算子时间约束。 然后,控制模块确定根据第一操作和被检查操作之间的在制品(WIP)数量定义的每个操作的状态和其吞吐率是否违反了第一操作和所检查操作之间的子时间约束 ,并且如果每个操作的状态满足子时间约束的相应总和,则将其发布到生产线中。
    • 8. 发明申请
    • CONVERSION OF DTMF CARRYING IP PACKETS
    • DTMF携带IP分组的转换
    • US20080137650A1
    • 2008-06-12
    • US11609240
    • 2006-12-11
    • Parameswaran KumarasamyKan WuPaul R.P. ChuJayesh Chokshi
    • Parameswaran KumarasamyKan WuPaul R.P. ChuJayesh Chokshi
    • H04L12/66
    • H04L12/66
    • A method and apparatus is described to convert DTMF packets at a network node in an IP network. The method may comprise receiving an Internet Protocol (IP) packet at the network node connected via a first IP network link to a first network device, and connected via a second IP network link to a second network device. The method may determine a first DTMF packet format for the first IP network link and a second DTMF packet format for the second IP network link and detect that only one of the first or second DTMF packet formats is in-band voice DTMF. Thereafter, the method may convert the received IP packet from the first DTMF packet format to the second DTMF packet format.
    • 描述了一种在IP网络中的网络节点处转换DTMF分组的方法和装置。 该方法可以包括在经由第一IP网络链路连接到第一网络设备的网络节点处接收因特网协议(IP)分组,并且经由第二IP网络链路连接到第二网络设备。 该方法可以确定用于第一IP网络链路的第一DTMF分组格式和用于第二IP网络链路的第二DTMF分组格式,并检测第一或第二DTMF分组格式中只有一个是带内语音DTMF。 此后,该方法可以将接收的IP分组从第一DTMF分组格式转换为第二DTMF分组格式。
    • 9. 发明申请
    • Control system and methods for managing a production process operating under time constraints
    • 用于管理在时间限制下运行的生产过程的控制系统和方法
    • US20050055105A1
    • 2005-03-10
    • US10658826
    • 2003-09-09
    • Kan WuWei-Jai Hung
    • Kan WuWei-Jai Hung
    • G05B13/02G05B15/00G05B19/418G06F17/00
    • G05B19/41865G05B2219/32265Y02P90/20
    • A control system for a production process having a plurality of operations. A plurality of time constraints exist between the operations. The control system includes a control module that defines a plurality of sub-time constraints between each two operations, generates a plurality of equations according to the time constraints and the sub-time constraints, and calculates the sub-time constraints using the equations. The control module then determines whether a status for each operation defined according to a Work-In-Process (WIP) quantity between a first operation and a checked operation and a throughput rate thereof violates sub-time constraints between the first operation and the checked operation, and releases a lot into the production line if the status for each operation satisfies the corresponding sum of the sub-time constraints.
    • 一种用于具有多个操作的生产过程的控制系统。 操作之间存在多个时间约束。 控制系统包括一个控制模块,该控制模块在每个两个操作之间定义多个子时间约束,根据时间约束和子时间约束产生多个等式,并使用这些方程计算子时间约束。 然后,控制模块确定根据第一操作和被检查操作之间的在制品(WIP)数量定义的每个操作的状态和其吞吐率是否违反了第一操作和所检查操作之间的子时间约束 ,并且如果每个操作的状态满足子时间约束的相应总和,则将其发布到生产线中。