    • Mixing design method for improved soil
    • 改良土壤混合设计方法
    • JP2005273387A
    • 2005-10-06
    • JP2004091547
    • 2004-03-26
    • Kajima CorpSumitomo Osaka Cement Co Ltd住友大阪セメント株式会社鹿島建設株式会社
    • IGARASHI HIROMASAHAYAKAWA YASUYUKIAOYAMA KANAMEWAKIYAMA TETSUYA
    • E02D3/12G01N11/00
    • PROBLEM TO BE SOLVED: To provide an economical and rational mixing design method for improving soil allowing the strength of the improved soil after hardened corresponds to a purpose and provide a measure to improve workability when designing.
      SOLUTION: Based on a soil test result in step 101, soil 1 to be improved is classified in steps 102, 103. When the fine grain part content 3 is not more than 30%, according to the procedure shown in ranges A, B, a bleeding test of the improved soil 4 which is not hardened yet is performed on the improved soil 4 obtained by determining test mixing, to select a suitable solidifying material 19, and whether corrective mixing is required or not is determined using a strength test result. When the fine grain part content 3 is 30% or more, according to the procedure shown in ranges C, D, a test related to thickening properties or the like due to cohesion of the improved soil 4 which is not hardened yet is performed on the improved soil 4 obtained by determining test mixing, to select a suitable solidifying material 19, and whether corrective mixing is required or not is determined using the strength test result.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种经济合理的混合设计方法,用于改善土壤,使得硬化后的改良土壤的强度对应于目的,并提供设计时提高加工性的措施。 解决方案:根据步骤101中的土壤试验结果,将要改进的土壤1分类为步骤102,103。当细粒部分含量3不大于30%时,根据范围A B,通过确定试验混合而获得的改良土壤4上进行尚未硬化的改良土壤4的渗血试验,选择合适的凝固材料19,以及是否需要矫正混合来确定是否使用强度 测试结果。 当细粒部分含量3为30%以上时,根据范围C,D所示的步骤,由于未硬化的改良土4的凝聚性而与增稠性等有关的试验在 使用强度试验结果确定通过确定试验混合获得的改进的土壤4,选择合适的固化材料19,以及是否需要校正混合。 版权所有(C)2006,JPO&NCIPI
    • 8. 发明专利
    • Moving device for steel pipe press-fit device and installation method for steel pipe press-fit device
    • 钢管压力装置的移动装置及钢管压力装置的安装方法
    • JP2013204403A
    • 2013-10-07
    • JP2012078112
    • 2012-03-29
    • Kajima Corp鹿島建設株式会社Toa Tone Boring:Kk株式会社東亜利根ボーリング
    • NISHIMURA MASAONAGATANI HIDEMOTOTSUNAKAWA HIROFUMIHATA TERUMICHIIGARASHI HIROMASANAGAO KAZUNORIKUMAGAI MASATOSHITOKUNAGA SUSUMUKOSUMI YOSHINORI
    • E21B7/20E21B7/02
    • PROBLEM TO BE SOLVED: To perform construction of a steel pipe pile efficiently at a site with overhead clearance restriction.SOLUTION: A moving device 6 for a steel pipe press-fit device 7 press-fitting a steel pipe vertically into a ground comprises: a pair of right and left traveling rails 61; traveling units 62 that are detachably attached to both of the right and left sides of the steel pipe press-fit device 7 and have wheels to roll on the traveling rails 61; and four lifting jacks 63 that are attached to the front side, rear side, right side, and left side of the steel pipe press-fit device 7. The pair of right and left traveling rails 61 are laid on a bottom surface 65 of a recess 64 that is preformed in making excavation of a bed. The traveling rails 61 consist of H-steel material and the outer flanges 61b make a surface contact with side walls 66 of the recess 64. For installing the steel pipe press-fit device 7 at a construction site, the lifting jacks 63 are extended to lift the steel pipe press-fit device 7 and the traveling units 62 are detached from the steel pipe press-fit device 7. Then, the lifting jacks 63 are contracted to place the steel pipe press-fit device 7 on the bottom surface 65 of the recess 64 between the traveling rails 61.
    • 要解决的问题:在具有架空间隙限制的场所有效地进行钢管桩的施工。解决方案:钢管压配装置7的移动装置6将钢管垂直地压入地面包括: 一对左右行驶导轨61; 移动单元62,其可拆卸地附接到钢管压配装置7的左右两侧,并且具有在行进导轨61上滚动的轮; 以及安装在钢管压入装置7的前侧,后侧,右侧和左侧的四个提升千斤顶63.一对左右行进导轨61被放置在 在进行床的挖掘时预成形的凹部64。 行驶导轨61由H钢材料构成,外凸缘61b与凹部64的侧壁66表面接触。为了将钢管压配装置7安装在施工现场,升降千斤顶63延伸到 抬起钢管压配装置7,将行进单元62从钢管压合装置7拆下。然后,提升千斤顶63收缩,将钢管压配装置7放置在 行进导轨61之间的凹部64。
    • 9. 发明专利
    • Casing supply method and method for forming drilling hole
    • 用于形成钻孔的铸造供应方法和方法
    • JP2013204402A
    • 2013-10-07
    • JP2012078111
    • 2012-03-29
    • Kajima Corp鹿島建設株式会社Toa Tone Boring:Kk株式会社東亜利根ボーリング
    • NISHIMURA MASAOTSUNAKAWA HIROFUMIIGARASHI HIROMASANAGAO KAZUNORINISHITANI HITOSHITOKUNAGA SUSUMUKOSUMI YOSHINORI
    • E21B7/20E21B19/18
    • PROBLEM TO BE SOLVED: To form a drilling hole in parallel with press-fitting a casing in a location with an overhead clearance limitation.SOLUTION: When joining a reverse rod 103' and supplying a casing 10' to a casing press-fitting device 9, first of all, a rotary drilling device 7 is separated by a swivel head 6 and a base machine body 22 is turned left at 90°. Next, an upper end portion of the new reverse rod 103' is connected to the swivel head 6. A frame 4 is then brought into a tilted state and the casing 10' is disposed under the frame 4. Thereafter, the casing 10' is moved horizontally while returning the tilted frame 4 to an upright state, thereby proceeding with insertion of the frame 4 into the casing 10'. Next, the casing 10' is hoisted by an auxiliary crane 8. The base machine body 22 is then turned right at 90°. Thereafter, an upper end portion of the rotary drilling device 7 is connected to a lower end portion of the reverse rod 103'. Afterwards, the casing 10' is moved down and set to the casing press-fitting device 9.
    • 要解决的问题:与顶盖间隙限制的位置压配合壳体平行地形成钻孔。解决方案:当将反向杆103'连接并将壳体10'供应到壳体压配装置9时 首先,旋转钻孔装置7由旋转头6分离,基础机体22向左转90度。 接下来,新的反向杆103'的上端部连接到旋转头6.然后,框架4处于倾斜状态,壳体10'设置在框架4的下方。此后,壳体10' 在将倾斜框架4返回到竖立状态下水平移动,从而将框架4插入到壳体10'中。 接下来,通过辅助起重机8将壳体10'提升。然后,基础机体22向右转90°。 此后,旋转钻孔装置7的上端部连接到反向杆103'的下端部。 然后,将壳体10'向下移动并设置到壳体压入装置9。