    • 1. 发明专利
    • Solar light reflecting and heat insulating structure
    • 太阳光反射和热绝缘结构
    • JP2012012769A
    • 2012-01-19
    • JP2010147288
    • 2010-06-29
    • Kajima Corp鹿島建設株式会社
    • SAKUSE NOBUOMIYAMAE YUKINARIITO HIROSHIKOSHIMURA YOSHITAKAMIURA KAZUHIKOLIN BOON KENNAKAMURA HANAKOYAMAMOTO MANABU
    • E04D13/00E04B1/80E04D7/00
    • PROBLEM TO BE SOLVED: To provide a fully durable solar light reflecting and heat insulating structure which is used at a part of a building requiring the improvement of reflecting and heat insulating effects for irradiation heat by the solar light, requires almost no maintenance, does not require a running cost, is capable of reducing power consumption needed for air conditioning since the solar light reflecting and heat insulating structure can be realized, is useful for Coreduction, and is capable of effectively utilizing shells that are generated in Japan and disposed as industrial waste taking huge time, labor and costs at present.SOLUTION: At the part to receive the irradiation heat, the shells 2 having a pearly layer 2a are laid in a layer structure shape so that the pearly layer 2a is turned to the reflection surface of the irradiation heat by the solar light.
    • 要解决的问题:为了提供在建筑物的一部分使用的完全耐用的太阳光反射和隔热结构,需要改善由太阳光照射的热量的反射和隔热效果,几乎不需要维护 不需要运行成本,因为可以实现太阳光反射和隔热结构,所以能够降低空调所需的功耗,对于减少Co 2 有用, 能够有效利用日本产生的贝壳,作为工业废弃物,目前花费巨大的时间,劳动力和成本。 解决方案:在接受照射热的部分,具有珍珠层2a的壳2被铺设成层结构形状,使得珠光层2a通过太阳光转向照射热的反射表面。 版权所有(C)2012,JPO&INPIT
    • 2. 发明专利
    • Extension and reconstruction method of wind power generator
    • 风力发电机的扩展和重建方法
    • JP2009068407A
    • 2009-04-02
    • JP2007237227
    • 2007-09-12
    • Kajima Corp鹿島建設株式会社
    • USAMI EIJIFUJITA SUSUMUNAKAI TSUNEOYANO KAZUMASASUZUKI KENSUKEYAMANOBE SHINICHIYAMAMOTO MANABUMIZUTANI AKIRA
    • F03D11/04
    • Y02E10/72
    • PROBLEM TO BE SOLVED: To provide an extension and reconstruction method of a wind power generator enabling great reduction of construction cost by effectively utilizing existing strength of a tower of which the endurance years have passed.
      SOLUTION: In the extension and reconstruction method of the wind power device, proof stress of a first generation tower 3 is measured after start of service, loss proof stress and remaining proof stress at a time of extension and reconstruction are identified based on measurement results, and a second generation tower T1 is constructed by extension to an outside of the first generation tower further by using remaining proof stress as part of proof stress of the second generation tower T1 in the wind power generator provided with a tower fixed on a foundation 2, a nacelle attached at an upper part of the tower, and a wind turbine attached to the nacelle.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种风力发电机的扩建和重建方法,通过有效利用耐久年代的塔的现有实力,大大降低施工成本。 解决方案:在风力发电装置的扩建和重建方法中,第一代塔架3的启闭后测量了应力,延伸重建时的损伤应力和剩余的应力应力基于 测量结果,并且第二代塔T1通过在设置有固定在第一塔上的塔的风力发电机中进一步通过使用剩余的证明应力作为第二代塔T1的证明应力的一部分而延伸到第一代塔的外部 基座2,连接在塔的上部的机舱和连接到机舱的风力涡轮机。 版权所有(C)2009,JPO&INPIT