会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Installation method of precast member and precast member used in the same
    • 预处理成员的安装方法及其使用的预制成员
    • JP2013096164A
    • 2013-05-20
    • JP2011241002
    • 2011-11-02
    • Kajima Corp鹿島建設株式会社
    • YASUNAGA MASAMICHIYAMANAKA HIROYUKIUO AKIYUKI
    • E03F3/04E01C5/08
    • PROBLEM TO BE SOLVED: To provide a method for connecting precast members in two non-parallel directions (for instance, a horizontal direction and a vertical direction) without using a bolt box, and the precast member suitable for it.SOLUTION: A precast member installation method according to the present invention includes: a step of connecting a first precast member having a first hole part capable of housing a connecting rod to an existing concrete structure; a step of connecting a second precast member having a second hole part into which the distal end side of the connecting rod can be inserted to the existing concrete structure so as to be adjacent to the first precast member; a step of sliding the connecting rod housed in the first hole part in the direction of the second precast member, and inserting the distal end side of the connecting rod to the second hole part; and a step of packing a liquid filler in the first hole part and the second hole part after sliding the connecting rod.
    • 要解决的问题:提供一种用于在不使用螺栓箱的情况下将预制构件连接在两个非平行方向(例如水平方向和垂直方向)上的方法,以及适于其的预制构件。 解决方案:根据本发明的预制构件安装方法包括:将具有能够容纳连接杆的第一孔部分的第一预制构件连接到现有混凝土结构的步骤; 连接具有第二孔部的第二预制构件的步骤,连杆的前端侧能够插入到现有的混凝土结构中以与第一预制构件相邻; 将容纳在第一孔部中的连杆沿第二预制构件的方向滑动并将连杆的前端侧插入到第二孔部的步骤; 以及在连接杆滑动之后,在第一孔部分和第二孔部分中填充液体填料的步骤。 版权所有(C)2013,JPO&INPIT
    • 2. 发明专利
    • Installation method for precast member and precast structure used for the same
    • 用于预测成员的预安装方法及其使用的预测结构
    • JP2013104175A
    • 2013-05-30
    • JP2011246699
    • 2011-11-10
    • Kajima Corp鹿島建設株式会社
    • YASUNAGA MASAMICHIYAMANAKA HIROYUKIUO AKIYUKI
    • E03F1/00
    • PROBLEM TO BE SOLVED: To provide a method capable of joining precast members in two non-parallel directions (for example, in a lateral direction and a vertical direction) even when a bolt box is not used, and a precast structure suitable for the same.SOLUTION: An inventive installation method for precast members includes the steps of: joining a first precast member having holes which can accommodate tip sides of coupling rods to an existing concrete structure; joining a second precast member having through-holes forming coupling rod insertion holes together with the holes to the existing concrete structure so that it is arranged adjacently to the first precast member; inserting the coupling rods from the other openings of the through-holes of the second precast member, respectively, and pushing the coupling rods into the coupling rod insertion holes until the tip sides of the coupling rods are accommodated in the holes of the first precast member; and filling the coupling rod insertion holes with a liquid filler after the coupling rods are pushed in.
    • 要解决的问题:即使在不使用螺栓箱的情况下,也能够提供能够在两个非平行方向(例如,在横向和垂直方向上)连接预制构件的方法,并且预制结构适合 相同的 解决方案:一种用于预制构件的本发明的安装方法包括以下步骤:将具有孔的第一预制构件连接到可以容纳连接杆的顶端的现有混凝土结构; 将具有通孔的第二预制构件与孔一起形成与现有混凝土结构的连接杆插入孔,使得其布置成与第一预制构件相邻; 将耦合杆分别从第二预制构件的通孔的其他开口插入,并将联结杆推入联接杆插入孔中,直到联接杆的顶端容纳在第一预制构件的孔中 ; 在连接杆推入后,用液体填充物填充连接杆插入孔。(C)2013,JPO&INPIT