    • Construction method for shield machine receiving opening, and arrival method for shield machine
    • 屏蔽机接收打开的结构方法和屏蔽机的到位方法
    • JP2009174179A
    • 2009-08-06
    • JP2008013440
    • 2008-01-24
    • Kajima Corp鹿島建設株式会社
    • SASAKI YUKINOBUYARITA TETSUYANISHIJIMA TORUARAKI HITOSHISUYAMA YOSHIMASAMATSUEDA KOTAROIWASHITA NAOKINAKAZONO NAOSHIKANDA KENJI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a construction method for a shield machine receiving opening, which enables a tunnel to arrive outside a skeleton of an underground structure without reference to the size of the underground structure, and an arrival method for a shield machine.
      SOLUTION: Two pits 7 are excavated toward the vicinities of both lateral sides of a top section in a predetermined position 5 of construction of the shield machine receiving opening, from a widened section 11 of a main line tunnel. After the construction of a base-enlarged caisson type pile 17 from inside the pit 7, a section between the pits 7 is excavated for the construction of the upper section 29 of the shield machine receiving opening 27. Subsequently, a section between the base-enlarged caisson type piles 17, the lateral side of the base-enlarged caisson type pile 17, and a main body of the base-enlarged caisson type pile 17 are excavated for the construction of the central and lower sections 33 and 39 of the shield machine receiving opening 27. After that, the shield machine 45 penetrates the shield machine receiving opening 27; and a section between a frozen duct 43 for application to the receiving opening, which is arranged in the shield machine receiving opening 27, and a frozen duct 51 for application to the shield machine, which is arranged at the leading end of a hood section 59 of the shield machine 45, is frozen and cutoff water by means of both the frozen ducts 43 and 51.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种盾构机接收开口的施工方法,其能够使隧道在不参考地下结构的大小的情况下到达地下结构的骨架外部,并且可以使用盾构件的到达方法 机。 解决方案:从主线隧道的加宽部分11,在屏蔽机接收开口的结构的预定位置5中,朝向顶部两侧的两侧附近挖掘两个凹坑7。 在从坑7内部构造基底放大的沉箱式桩17之后,挖掘出凹坑7之间的部分,用于构造屏蔽机接收开口27的上部29。随后, 挖掘扩大的沉箱式桩17,底部扩大的沉箱式桩17的侧面和基底扩大的沉箱式桩17的主体,用于构造盾构机的中部和下部33和39 之后,屏蔽机45穿过屏蔽机接收开口27; 以及布置在屏蔽机接收开口27中的用于施加到接收开口的冷冻管道43和用于应用于屏蔽机器的冷冻管道51之间的部分,其布置在发动机罩部分59的前端 通过冷冻管道43和51两者冻结和切断水。(C)2009年,JPO&INPIT
    • 2. 发明专利
    • Method and equipment for maintaining tail seal of shield machine
    • 保护机器尾部密封的方法和设备
    • JP2009046809A
    • 2009-03-05
    • JP2007211012
    • 2007-08-13
    • Kajima Corp鹿島建設株式会社
    • SASAKI YUKINOBUOKUYAMA MASAYOSHIYANAGISAWA HIROSHIYARITA TETSUYANAKAZONO NAOSHI
    • E21D11/00
    • PROBLEM TO BE SOLVED: To provide a method and equipment for maintaining a tail seal of a shield machine, which enable a reduction in the risk of ignition, an increase in working efficiency, and the realization of high water sealability when maintenance such as the replacement of the tail seal is performed.
      SOLUTION: The tail seal 20 is provided in the rear of the external cylinder section 10 of the shield machine 1. When the maintenance of the tail seal 20 is performed, a special segment S1 provided with an ice packing creation pipe 25 is installed as a segment S, and a cooling fluid is circulated and supplied into the ice packing creation pipe 25, so that ice packing P can be formed on natural ground between the external cylinder section 10 and the segment S. The maintenance of the tail seal 20 is performed by applying water sealing to a section between the external cylinder section 10 and the segment S by means of the ice packing P.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种用于维护屏蔽机的尾部密封的方法和设备,其能够降低点燃的风险,提高工作效率,并且在维护时实现高的水封闭性 因为执行尾部密封的替换。 解决方案:尾密封件20设置在屏蔽机1的外筒部10的后部。当执行尾密封件20的维护时,具有制冰包装管25的特殊部分S1是 作为段S安装,并且冷却流体循环并供应到冰包装产生管25中,使得可以在外筒部分10和段S之间的自然地面上形成冰包装P.尾部密封件的维护 通过使用冰封装P将水密封施加到外筒部10和片段S之间的部分来进行。(C)2009,JPO&INPIT
    • 3. 发明专利
    • Shield tunnel widening method
    • 屏蔽隧道扩建方法
    • JP2009068276A
    • 2009-04-02
    • JP2007238726
    • 2007-09-14
    • Kajima Corp鹿島建設株式会社
    • SASAKI YUKINOBUOKUYAMA MASAYOSHISUYAMA YOSHIMASAYANAGISAWA HIROSHIYARITA TETSUYANAKAZONO NAOSHITSURUTA KOICHIABE TAKASHI
    • E21D9/06E21D11/28
    • PROBLEM TO BE SOLVED: To provide a shield tunnel widening method which is inexpensively carried out without using a special shield machine etc.
      SOLUTION: According to the shield tunnel widening method, after construction of a shield tunnel by assembling segments, a chemical solution is poured into the shield tunnel to form a poured section 10a, and then an upper segment 5a is removed, followed by excavating the poured section 10a, to thereby form an excavated section 15a at a widening scheduled location. Thereafter a lower segment 7a is removed, and a lower portion widening segment 19 is set, followed by removing side segments 9a, 9b, 9c. Then the removed lower segment 7a and the side segments 9a, 9b, 9c are set at the widening scheduled location, and an upper widening segment 25 is set, followed by setting the upper segment 5a at the widening scheduled location. In this manner widening of the shield tunnel is carried out. In order to ensure the rigidity of the tunnel during execution of widening work, a jack timber 11, a lower support 21, and an upper support 27 are set in the tunnel.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种在不使用特殊屏蔽机等的情况下廉价执行的屏蔽隧道拓宽方法。解决方案:根据屏蔽隧道扩大方法,在通过组装段构建屏蔽隧道之后 将化学溶液倒入屏蔽隧道中以形成浇注部分10a,然后去除上部段5a,随后挖掘浇注部分10a,从而在扩大的排放位置形成挖掘部分15a。 此后,除去下段7a,并且设置下部加宽段19,然后除去侧段9a,9b,9c。 然后将移除的下段7a和侧段9a,9b,9c设置在加宽预定位置,并且设置上加宽段25,然后将上段5a设置在加宽预定位置。 以这种方式进行盾构通道的加宽。 为了确保在加工作业期间的隧道的刚性,在隧道内设置有千斤顶木材11,下部支撑件21和上部支撑件27。 版权所有(C)2009,JPO&INPIT
    • 4. 发明专利
    • Tunnel junction part and construction method for tunnel junction part
    • 隧道连接部分及隧道结构施工方法
    • JP2009062675A
    • 2009-03-26
    • JP2007228667
    • 2007-09-04
    • Kajima Corp鹿島建設株式会社
    • SASAKI YUKINOBUOKUYAMA MASAYOSHISUYAMA YOSHIMASAYANAGISAWA HIROSHIYARITA TETSUYANAKAZONO NAOSHI
    • E21D9/06E21D9/04
    • PROBLEM TO BE SOLVED: To provide a tunnel junction part and a construction method for the tunnel junction part for constructing the tunnel junction part within a site having the minimum required size for the tunnel junction part when communicating a main track tunnel with a ramp tunnel in the tunnel junction part with excellent construction property.
      SOLUTION: In this construction method, a width extended part 7e, which becomes a pipe roof start base 11, is provided by increasing amount of width extension step by step, a pipe 17 to be constructed by starting from the pipe roof start base 11 toward substantially axial direction of the main track shield tunnel 1 is provided in a fanning-out form to construct a pipe roof 13, and a zone surrounded by the pipe roof 13 is used as a water cut-off zone 25 to construct a tunnel skeleton 29.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种用于隧道结部分的隧道结部分和施工方法,用于在将主轨道隧道与通道连接部分通信时在隧道连接部分具有最小所需尺寸的位置内构建隧道连接部分 隧道交界处有斜坡隧道,施工性能优良。 解决方案:在该施工方法中,通过逐步增加宽度的延伸量,设置成为管屋顶起动台11的宽度延伸部7e,从管屋顶起动开始构成的管17 主导轨屏蔽通道1的大致轴向的基部11以扇形形式设置,以构成管顶13,并且由管顶13包围的区域用作截水区25以构造 隧道骨架29.版权所有(C)2009,JPO&INPIT