会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • EMERGENT STOP DEVICE FOR HIGH LIFT WORKING BASE BY REMOTE OPERATION AND METHOD THEREOF
    • JPH1149499A
    • 1999-02-23
    • JP25944797
    • 1997-08-04
    • KITAGAWA IRON WORKS CO
    • TAKAHASHI AKITOHATAJIMA TOSHIKATSU
    • B66F9/24B66F11/04
    • PROBLEM TO BE SOLVED: To immediately stop turning, derricking, and extension/contraction of a boom simultaneously with operation of a high lift working base in emergency so as to improve safety, by providing an emergent stop device immediately stopping operation of the high lift working base and operation of a crane, in a crane provided with the high lift working base on the extreme end part of the boom. SOLUTION: In a crane in which an engine key 20 is inserted in a key hole provided on a console panel 30 in a driver's seat 2, an emergent stop device 19 is fitted to the part to be turned with a hand by a driver so as to be fitted form the outside spacedly from the part by a narrow gap. When and emergent stop button provided on a machine side operation board or a remote-operation board provided on a high lift working base is pushed, or the safety device of a load detecting means so as to generate an emergent stop signal, simultaneously with stopping motor-driven jacks as a balancing device of the high lift working base and a turning device, the driving means 21 of the emergent stop device 19 is actuated, and engine is stopped by rotationally moving the engine key 20. and hence operation of the crane is stopped.
    • 4. 发明专利
    • ELEVATOR USED FOR CONSTRUCTION
    • JPH1160112A
    • 1999-03-02
    • JP22746897
    • 1997-08-08
    • KITAGAWA IRON WORKS CO
    • TAKAHASHI AKITOHATAJIMA TOSHIKATSU
    • B66B9/02B66B9/187
    • PROBLEM TO BE SOLVED: To provide an elevator used for construction which is easily assembled, dissembled, and carried, by providing each floor door which is arranged on a stop floor of a building or others, and a fixing means which installs each floor door on the each stop floor, height of the building on a hoistway tower, and forming the hoistway tower so that it horizontally surrounds a carrier. SOLUTION: Each floor door 6 and a truss construction panel 16 which complements parts without the each floor door 6, are installed on U-shaped openings of a hoistway tower 4. Therefore, the each floor door 6 and a mounting hole in which a panel is installed are arranged on the both sides of the opening. As a result, the hoistway tower 4 is formed in the square pole shape with a hollow part, and a carrier 5 can rise and fall in the hollow part. By integrally forming the carrier 5, the hoistway tower 4, and the each floor door 6, a man-hour of assembling and dissembling work in a construction field is reduced, and by reducing facilities of the construction field and actual working hours of workers which are needed for assembling and dissembling work of the construction work elevator, working efficiency is improved.
    • 6. 发明专利
    • Wiring method for derricking jib crane
    • 用于破碎JIB起重机的接线方法
    • JP2007099522A
    • 2007-04-19
    • JP2006351723
    • 2006-12-27
    • Kitagawa Iron Works Co Ltd株式会社北川鉄工所
    • TAKAHASHI AKITOKUTAMI KAORUOYAMA AKIRA
    • B66C23/82
    • PROBLEM TO BE SOLVED: To provide a wiring method for a derricking jib crane for wiring a wire mechanically by dispensing with manual work, using a driving source, and applying sufficient tensile force when wiring on both drums including the horizontally pulling-in drum and the derricking drum.
      SOLUTION: A wire winding device provided with brake means provided in the derricking drum and the horizontally pulling-in drum and a clutch means for connecting or shutting off rotation between the two drums is used to fix the derricking drum to a tip of a jib, fix a winding-up wire to the horizontally pulling-in drum by letting it pass through a hook sheave, then fix the derricking drum by the brake means, shut off the derricking drum and a winding-up drum by the clutch means, and wind the winding-up wire around the horizontally pulling-in drum in the opposite direction to the direction of wiring of a derricking wire.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种用于起重吊臂起重机的布线方法,通过分配手动工作,使用驱动源机械地接线,并且当在包括水平拉入的两个滚筒上布线时施加足够的拉力 鼓和升降鼓。 解决方案:设置有设置在升降鼓和水平拉入滚筒中的制动装置的线缠绕装置和用于连接或关闭两个滚筒之间的旋转的离合器装置用于将升降鼓固定到 起重臂,通过使其通过钩轮来将卷绕线固定到水平拉入滚筒,然后通过制动装置固定升降鼓,通过离合器装置切断升降鼓和卷绕滚筒 ,并且将卷绕线绕着水平拉入滚筒沿着与升降线的布线方向相反的方向缠绕。 版权所有(C)2007,JPO&INPIT