会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Method and device for installing base-isolating device in existing building
    • 用于在现有建筑物中安装基底隔离装置的方法和装置
    • JP2003003675A
    • 2003-01-08
    • JP2001226813
    • 2001-06-21
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • TAKAHASHI TADASHIOKUDA TAKESHIKOSAKA NORIOUNAI YASUHIROENDO YOSHIHIROKAMIURA NAOKIARAI MITSUNORIHIRAYAMA MASAAKIMIZUNO AKIRA
    • E04B1/36E04G23/02E04H9/02
    • PROBLEM TO BE SOLVED: To provide a method for installing a base-isolating device in an existing building, which facilitates installation of the base-isolating device in a prescribed position, allows the base-isolating device to be firmly fixed to the existing building, simplifies a means for use in the installation, and enables positioning, etc., to be humanly performed with ease.
      SOLUTION: Many headed iron rods 1Sd are provided protrusively in a pile/column part 1B on the downside of a gap A for the installation and a pile/column part 1C on the upside of the gap A; a lower plate 24, wherein many cap nuts 24a are provided protrusively on the downside, is fixed to a prescribed position on the pile/column part 1B; an upper plate 25, wherein many cap nuts 25a are provided protrusively on the upside, is temporarily fixed to a height position below the pile/column part 1C; the base-isolating device 20 is located in the prescribed position on the lower plate 24; the upper plate 25 under a state of release of temporal fixation is located in a prescribed position on the base-isolating device 20; the lower plate 24, the base-isolating device 20 and the upper plate 25 are made to maintain prescribed positional relationships among them; forms are arranged around an area of the arrangement of the cap nuts 24a and 25a, the headed iron rods 1Sd, etc., between the pile/ column parts 1B and 1C and the plates 24 and 25; mortar is infilled in the forms; and the lower plate 24, the base-isolating device 20 and the upper plate 25 are fixed to the pile/column parts 1B and 1C. Consequently, the base-isolating device 20 can be easily installed in the prescribed position.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了提供一种在现有建筑物中安装基座隔离装置的方法,其有助于将基座隔离装置安装在规定位置,允许基座隔离装置牢固地固定在现有的建筑物上, 简化了在安装中使用的方法,并且使得能够容易地进行人性化的定位等。 解决方案:许多带头铁杆1Sd突出地设置在用于安装的间隙A的下侧的桩/柱部分1B和间隙A的上侧的桩/柱部分1C; 下板24,其中许多盖螺母24a突出地设置在下侧,固定到桩/柱部分1B上的规定位置; 上板25,其中许多盖螺母25a在上侧突出设置,临时固定在桩/柱部分1C下方的高度位置; 基座隔离装置20位于下板24的规定位置; 处于释放时间固定状态的上板25位于隔离装置20上的规定位置; 使下板24,基底隔离装置20和上板25保持规定的位置关系; 在桩/柱部分1B和1C与板24和25之间的盖螺母24a和25a,带头铁杆1Sd等的布置的区域周围布置形式; 砂浆填充在表格中; 并且下板24,基部隔离装置20和上板25固定到桩/柱部分1B和1C。 因此,可以将基座隔离装置20容易地安装在规定位置。