会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • IMPROVEMENT EXECUTION METHOD OF LIQUEFIED GROUND
    • JPH10292415A
    • 1998-11-04
    • JP10291097
    • 1997-04-21
    • KAJIMA CORP
    • MIURA KENJIARITA TOMOHIKO
    • E02D31/10
    • PROBLEM TO BE SOLVED: To form a stable ground by installing multiple steel sheet piles continuously in a ground so that they surround the foundation forming part of a building so as to construct a vertical outer wall and also installing multiple steel sheet piles continuously on the inside of the outer wall so as to form a vertical inner wall. SOLUTION: Multiple steel sheet piles are installed connectedly to each other in a ground which may be liquefied such as sandy ground as that they surround the foundation forming part of a building so as to construct a vertical outer wall 1. Also multiple steel sheet piles are set in the ground in a flat cross shape or lattice shape on the inside of the vertical outer wall 1 while the steel sheet piles are connected to each other so as to construct a vertical inner wall 2. As required, the steel sheet piles are set aslant in the lattice so as to construct the vertical inner wall 2 and the vertical inner wall 2 is connected integrally with the vertical outer wall 1. Thus the movement of underwater and soil in earthquake can be shut off completely and, therefore, the ground which may be liquefied can be reformed into a stable ground.