热词
    • 2. 发明专利
    • Excavation method
    • 挖掘方法
    • JP2003328346A
    • 2003-11-19
    • JP2002142421
    • 2002-05-17
    • Chem Grouting Co LtdKajima Corpケミカルグラウト株式会社鹿島建設株式会社
    • AIKAWA KIYOMIIKEMATSU TOYOFUMIMUKAI MASASHIYOKOO MITSURUKUMEGAWA MASANORI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide an excavation method executable even in the presence of a building on the ground side of an injection material injection region in the ground, requiring to bore only one guide excavated hole within the same construction plane without needing to move an excavator for every borehole. SOLUTION: This excavation method comprises a boring process for boring excavated holes 4, 4B in a prescribed injection material injection region 2 by a boring rod 11 using a universal boring machine 1, and an injection process for injecting the injection material 6 from a boring rod tip 11a while pulling the boring rod 11 back. The injection process comprises a branch excavated hole boring process for interrupting the pull-out of the boring rod at branch points Y1-Y5 in the injection material injection region 2 without pulling the boring rod 11 completely out of the excavated holes 4, 4B, and boring branch excavated holes 51-55 separately in the injection material injection region 2 from the branch points Y1-Y5. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了提供即使在地面上的注入材料注入区域的地面侧的建筑物存在下也可以执行的挖掘方法,仅需要在同一施工平面内仅钻一个导向挖掘孔,而不需要 为每个钻孔移动挖掘机。 解决方案:该挖掘方法包括通过使用万能镗床1的镗杆11对规定的注射材料注入区域2中的挖掘孔4,4B进行钻孔的方法,以及用于将注射材料6从 在将镗杆11向后拉的同时,钻杆杆头11a。 注射过程包括一个分支挖掘孔钻孔过程,用于在不将挖掘杆11完全从挖掘孔4,4B中拉出的情况下中断在注射材料注射区域2中的分支点Y1-Y5处的镗杆拉出, 在注入材料注入区域2中从分支点Y1-Y5分别开凿分支挖掘孔51-55。 版权所有(C)2004,JPO
    • 5. 发明专利
    • Filling method and filling device
    • 填充方法和填充装置
    • JP2007100507A
    • 2007-04-19
    • JP2007013560
    • 2007-01-24
    • Chem Grouting Co LtdKajima Corpケミカルグラウト株式会社鹿島建設株式会社
    • AIKAWA KIYOMIIKEMATSU TOYOFUMIMUKAI MASASHIYOKOO MITSURUKUMEGAWA MASANORI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a filling method in which a flow passage opening/closing treatment is extremely easily performed between a drilling step and a chemical filling step even if a ground-filled chemical is a type that is not solidified solely but solidified when it is mixed with the other and a filling device used for the method.
      SOLUTION: This filling method comprises the drilling step of jetting a fluid for excavation from a nozzle 6 communicating with a fluid flow passage 20 for excavation of the filling device 1 attached to the end of an excavation rod 2, and the insertion step of inserting a chemical filling unit 9 into the filling device. In the insertion step, the end 40 of the chemical filling unit 9 opens a normally closed open/close means 8 installed in the flow passage 30 for filling chemical of the filling device 1 and closes the fluid flow passage 20 for drilling. The method further comprises the step of expanding a packer 13 fitted to the chemical filling unit 9, and the step of jetting the filled chemical.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了提供一种填充方法,其中在钻井步骤和化学填充步骤之间极易进行流道打开/关闭处理,即使地面填充的化学品是仅仅不是固化的类型 但是当与另一个混合时固化,并且用于该方法的填充装置。 解决方案:该填充方法包括从与用于挖掘附接到挖掘杆2的端部的填充装置1的流体流路20连通的喷嘴6喷射用于挖掘的流体的钻孔步骤,以及插入步骤 将化学填充单元9插入到填充装置中。 在插入步骤中,化学填充单元9的端部40打开安装在流路30中的用于填充填充装置1的化学物质的常开的打开/关闭装置8,并关闭用于钻孔的流体流动通道20。 该方法还包括扩大装配到化学填充单元9的封隔器13的步骤和喷射填充的化学品的步骤。 版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • METHOD OF JOINING TOGETHER CAISSONS
    • JPS61158527A
    • 1986-07-18
    • JP28005284
    • 1984-12-29
    • KAJIMA CORP
    • YAMAMOTO HARUOKONDO HISAOAIKAWA KIYOMI
    • E02D25/00
    • PURPOSE:To enable easy and firm joining together of floating caissons, by a method wherein 2-way projections or recesses are provided in the joint of a concrete floating caisson, a PC strand is buried in a bottom plate, and after joining, the PC strand is stretched. CONSTITUTION:Plural concrete floating caissons 1, each formed such that the caisson is vertically partitioned in a meshlike manner by partition walls 3, are built. The caisson 1 is provided at its joint part with plural partition walls 5 and longitudinal walls 6, and a lateral wall 7, a joint recessed part 8 or projection part 11 is provided above a draft line on an intersection point of the longitudinal walls and the lateral wall 7, and a cut off rubber is located around the joint. The joining recessed part and projection part of the joint of the caissons 1 transported in a floating manner to a site are positioned facing on each other for abutment, water in the abutment part is drained, and a PC strand 20 buried in a bottom plate 2 is stretched. This facilitates abutment of the caissons to each other, and permits powerful joint of the caissons.