会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Project predictor
    • 项目预测
    • US07676490B1
    • 2010-03-09
    • US11467226
    • 2006-08-25
    • Deandra T. CassoneJoseph E. DudleyGeorge R. KatherPaul R. SapenaroJason N. Ward
    • Deandra T. CassoneJoseph E. DudleyGeorge R. KatherPaul R. SapenaroJason N. Ward
    • G06F17/00G06F15/16
    • G06Q10/06G06Q10/06313G06Q40/04
    • A computer implemented system for project prediction is provided. The system includes a data manager to obtain historical project data. The system also includes an analyzer to analyze the historical project data to generate models for a proposed project cycle time. Additionally, the system includes a user interface to select one model for the proposed project cycle time, wherein the selected model includes linear sub-models corresponding to a historical data range, and apply proposed project data to one linear sub-model corresponding to a proposed data range to predict the proposed project cycle time. Furthermore, the system captures proposed project data and obtains additional project data to update the selected model. The models provide for the accurate prediction of cycle times, or project costs, in an enterprise development environment.
    • 提供了一种用于项目预测的计算机实现系统。 该系统包括一个数据管理器来获取历史的项目数据。 该系统还包括一个分析器,用于分析历史项目数据,以便为拟议的项目周期时间生成模型。 此外,该系统包括用于为所提出的项目周期时间选择一个模型的用户界面,其中所选择的模型包括对应于历史数据范围的线性子模型,并将所提出的项目数据应用于与所提出的项目周期时间对应的一个线性子模型 数据范围来预测拟议的项目周期时间。 此外,系统捕获所提出的项目数据,并获得额外的项目数据来更新所选模型。 这些模型可以在企业开发环境中准确预测周期时间或项目成本。
    • 4. 发明授权
    • Enhanced project predictor
    • 增强项目预测
    • US07949663B1
    • 2011-05-24
    • US11672905
    • 2007-02-08
    • Deandra T. CassoneJoseph E. DudleyGeorge R. KatherPaul R. SapenaroJason N. Ward
    • Deandra T. CassoneJoseph E. DudleyGeorge R. KatherPaul R. SapenaroJason N. Ward
    • G06F17/30G06F15/16
    • G06Q10/06G06Q30/0278G06Q30/0283
    • A computer implemented system for project prediction is provided. The system includes a data manager to obtain historical project data. The system also includes an analyzer to analyze the historical project data and an analysis cycle time to generate models for a proposed project cycle time. Additionally, the system includes a user interface to select one model for the proposed project cycle time, wherein the selected model includes linear sub-models corresponding to a historical data range, and apply proposed project data and analysis cycle time to one linear sub-model corresponding to a proposed data range to predict the proposed project cycle time. Furthermore, the system captures proposed project data and obtains additional project data to update the selected model. The models provide for the accurate prediction of cycle times, or project costs, in an enterprise development environment.
    • 提供了一种用于项目预测的计算机实现系统。 该系统包括一个数据管理器来获取历史的项目数据。 该系统还包括分析器,用于分析历史项目数据和分析周期时间,以便为拟议的项目周期时间生成模型。 另外,该系统包括用于为所提出的项目周期时间选择一个模型的用户界面,其中所选模型包括对应于历史数据范围的线性子模型,并将所提出的项目数据和分析周期时间应用于一个线性子模型 对应于提出的数据范围来预测拟议的项目周期时间。 此外,系统捕获所提出的项目数据,并获得额外的项目数据来更新所选模型。 这些模型可以在企业开发环境中准确预测周期时间或项目成本。