会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Self-propelled lengthy article conveying vehicle and its operation method
    • 自行车长输送车辆及其操作方法
    • JP2005206119A
    • 2005-08-04
    • JP2004017477
    • 2004-01-26
    • Jio Service:KkKansai Electric Power Co Inc:TheShimizu Corp株式会社ジオサービス清水建設株式会社関西電力株式会社
    • KIUCHI TSUTOMUTANAKA DAISEI
    • B62D7/14B60P1/04
    • PROBLEM TO BE SOLVED: To provide a self-propelled lengthy article conveying vehicle and its operation method capable of safely conveying the lengthy article even when width of a road is narrow.
      SOLUTION: The self-propelled lengthy article conveying vehicle 1 is constituted of a base 2 for placing the lengthy article 20; a derricking device 5 comprising a fulcrum 7 for supporting one end of the base 2 and a jack 10 in rise and fall fashion supporting the other end; and a self-propelled traveling vehicle 3 comprising a base support board 4 installed with the standing/falling device 5. The conveying vehicle is constituted such that the fulcrum 7 is moved in a direction of the jack 10 according to elongation of the jack 10 of the standing/falling device 5 and the front and rear wheels of the self-propelling conveying vehicle 3 are made steerable.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:即使在道路宽度狭窄的情况下,也能够提供自走式漫长物品输送车辆及其操作方法,其能够安全地输送长时间的物品。 解决方案:自走长型物品输送车1由用于放置长条20的基座2构成; 包括用于支撑基座2的一端的支点7和支撑另一端的上升和下降方式的千斤顶10的升降装置5; 以及自行式行驶车辆3,其包括安装有立起/下落装置5的基部支撑板4.输送车辆构成为使得支点7根据插座10的伸长率沿千斤顶10的方向移动 自走式搬送车3的立起落下装置5以及前后轮是可操纵的。 版权所有(C)2005,JPO&NCIPI
    • 3. 发明专利
    • Geothermal power generation system
    • 地热发电系统
    • JP2010270679A
    • 2010-12-02
    • JP2009123260
    • 2009-05-21
    • Jio Service:KkShimizu Corp株式会社ジオサービス清水建設株式会社
    • KIUCHI TSUTOMUTANAKA DAISEI
    • F03G4/00
    • Y02E10/10
    • PROBLEM TO BE SOLVED: To realize an effective and appropriate geothermal power generation system conformable to the RPS law.
      SOLUTION: The geothermal power generation system separates steam and hot water from a production well 1 into steam and hot water with a separator 3, drives a turbine 4 by the separated steam for power generation, and cools down and condenses the steam after the power separation so as to return the condensate together with the hot water separated with the separator from a returning well 2 into the ground. The condensing operation for the steam after passing through the turbine is carried out through indirect cooling with a cooling water coil 21 in a sealed condenser 20 so that the whole amount of the condensate is returned to the ground.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:实现符合RPS法的有效和适当的地热发电系统。

      解决方案:地热发电系统将蒸汽和热水从生产井1分离成蒸汽和热水,分离器3,通过分离的蒸汽驱动涡轮机4发电,并冷却并蒸发蒸汽 功率分离,以使冷凝物与分离器分离的热水与返回井2一起返回地面。 通过涡轮机后的蒸汽的冷凝操作通过在密封冷凝器20中与冷却水盘管21间接冷却来进行,使得冷凝物的总量返回到地面。 版权所有(C)2011,JPO&INPIT

    • 10. 发明专利
    • Tunnel construction method
    • 隧道施工方法
    • JP2009013603A
    • 2009-01-22
    • JP2007173830
    • 2007-07-02
    • Shimizu Corp清水建設株式会社
    • KUSUMOTO FUTOSHITAKAMOTO JUNYAKIUCHI TSUTOMU
    • E21D9/00
    • PROBLEM TO BE SOLVED: To provide a tunnel construction method, by favorably excavating a natural ground which does not allow blasting excavation and is difficult to excavate by a free-section excavator.
      SOLUTION: In the natural ground G where a tunnel regular pit 1 is constructed, a pilot drift 2 extending in the direction of an axis O1 of the tunnel regular pit 1 is lead-excavated to locate in a section of the tunnel regular pit 1, a plurality of radial holes 4 extending from the pilot drift 2 toward the outer periphery 1a of the tunnel regular pit 1 (the peripheral surface S of the tunnel regular pit drilling) are bored radially at predetermined spaces in the circumferential direction of the pilot drift 2 and also at predetermined spaces T2 in the direction of the axis O1 of the tunnel regular pit 1, a plurality of rock breaking holes 5 extending from a working face 6 to which the pilot drift 2 is opened to the direction of the axis O1 of the tunnel regular hole 1 are also bored, and the natural ground G where the radial holes 4 and the rock breaking holes 5 are bored is excavated from the working face 6 by a rock crushing machine 7.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供隧道施工方法,通过有利地挖掘不允许爆破开挖的自然地面,并且难以通过自由式挖掘机挖掘。 解决方案:在构造隧道规则坑1的自然地面G中,沿隧道规则坑1的轴线O1方向延伸的先导漂移2被挖掘,以定位在隧道的一部分中 凹坑1,从导向件漂移件2向隧道规则坑1的外周1a(隧道规则坑钻孔的周面S)延伸的多个径向孔4在径向上以预定的间隔在 导向漂移2,并且还在隧道规则坑1的轴线O1方向上的预定空间T2处,从工作面6延伸的多个岩石破坏孔5,导向漂移2向轴线方向打开 隧道规则孔1的O1也被钻孔,并且通过岩石破碎机7从工作面6挖掘出径向孔4和岩石破坏孔5钻孔的天然地面G.版权所有(C) )2009,JPO&INPIT