会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Cofferdam construction method, cut-off structure, and cofferdam structure
    • COFFERDAM建筑方法,切割结构和咖啡结构
    • JP2008297749A
    • 2008-12-11
    • JP2007143136
    • 2007-05-30
    • Jfe Metal Products & Engineering IncJfe建材株式会社Mutsubishi Rubber Co LtdZenitaka Corp六菱ゴム株式会社株式会社錢高組
    • TSUNODA KUNISUKEHARADA NAOYUKISATO TSUNEOYAMAGUCHI YOSHIKISUDO OSAMUKIMURA SHIGEAKISUYA TAKASHIKABURAGI KOICHI
    • E02D19/04
    • PROBLEM TO BE SOLVED: To provide a cofferdam construction method at a great application water depth, and to reduce a work burden on a worker, and to shorten a construction period, by reducing diving operation steps, in the cofferdam construction method.
      SOLUTION: A cut-off structure 30 has a constitution in which first and second annular elastic bodies 32 and 33 are arranged in a bolt-connected state in a supporting frame 31 arranged at the lower end of a cut-off wall 11. The first and second annular elastic bodies 32 and 33 in the state of being pressed against an anchoring surface of a footing 51 are deformed in such a shape that lower ends are crushed, so as to be brought into close contact with the anchoring surface of the footing 51. An injection pipe 14 communicating with a section from an upper end of the cut-off wall 11 to a lower end thereof is provided inside the cut-off wall 11. A filler is injected into a space 34 between the first and second annular elastic bodies 32 and 33 of the cut-off structure 30 on the lower end side of the cut-off wall 11, from the upper end side of the cut-off wall 11 via the injection pipe 14.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:在围堰施工方法中,通过减少潜水作业步骤,提供施工深度大的围堰施工方法,减轻工人的工作负担,缩短施工期间。 解决方案:截止结构30具有这样的结构,其中第一和第二环形弹性体32和33在螺栓连接状态下布置在布置在截止壁11的下端的支撑框架31中 第一和第二环状弹性体32,33被压靠在基脚51的固定面上的状态变形,使得下端被破碎,使其与锚固面51的固定面紧密接触 底壁51设置在切断壁11的内部,与切断壁11的上端部分连通的喷射管14设置在切割壁11的内侧。将填料注入到第一和第 截止壁11的下端侧的切断结构30的第二环状弹性体32和33经由喷射管14从切断壁11的上端侧开始。版权所有: (C)2009,JPO&INPIT
    • 2. 发明专利
    • Road crossing tunnel for wild animal
    • 道路交通工具用于野生动物
    • JP2012067479A
    • 2012-04-05
    • JP2010211781
    • 2010-09-22
    • Jfe Metal Products & Engineering IncJfe建材株式会社
    • TSURUMI AKITOSHIKIMURA SHIGEAKISUMIDA AKIRAKAMAZAKI YUJI
    • E21D9/14
    • PROBLEM TO BE SOLVED: To enable wild animals separately living in habitats divided by a road for cars into the habitats on both sides thereof to mutually move between the habitats without interfering traffic on the road for cars.SOLUTION: The present invention comprises: a tunnel running under a road for cars from an opening section provided on one side of the road for cars to the opening section provided on the other side thereof; a passage belt which is arranged along a longitudinal direction of the tunnel and elevated at a prescribed height from a bottom section inside the tunnel; a trestle which supports the passage belt from underneath thereof; and a space section made up of the bottom of the tunnel and the trestle. The tunnel is constructed by a structure body (such as a corrugated pipe) fabricated from segmented wavy steel plates.
    • 要解决的问题:使野生动物分别生活在栖息地除以汽车道路,进入其两侧的栖息地,以在栖息地之间相互移动,而不会妨碍道路上的汽车交通。 解决方案:本发明包括:从设置在其另一侧的开口部的轿厢一侧的开口部的道路上行驶的隧道; 沿着隧道的纵向方向布置并从隧道内的底部部分以规定高度升高的通道带; 从下面支撑通道带的支架; 以及由隧道的底部和支架构成的空间部分。 隧道由分段波浪形钢板制成的结构体(如波纹管)构成。 版权所有(C)2012,JPO&INPIT
    • 3. 发明专利
    • Structure and method for inhibiting liquefaction damage
    • 抑制液体损害的结构和方法
    • JP2014031706A
    • 2014-02-20
    • JP2013140263
    • 2013-07-04
    • Jfe Metal Products & Engineering IncJfe建材株式会社
    • TSURUMI AKITOSHIKIMURA SHIGEAKI
    • E02D27/34E02D5/04
    • PROBLEM TO BE SOLVED: To make it possible to conduct work for liquefaction countermeasure in a narrow place between an existing structure such as an existing detached house and a neighboring house silently and at a low price.SOLUTION: A foundation 12 immediately below a structure 10 is continuously surrounded by a wall body 14 and a lower end 14a of the wall body 14 is in a liquefaction layer 12b of the foundation 12. The wall body 14 is pressed downward in the foundation 12 around the structure 10 so that the foundation immediately below the structure 10 is continuously surrounded by the wall body 14. The lower end 14a of the wall body 14 stays inside the liquefaction layer 12b of the foundation 12. Preferably the lower end 14a of the wall body 14 is located at 1/3 to 2/3 of the depth of the liquefaction layer 12b of the foundation 12. The structure 10 is preferably an existing structure such as an existing detached house. The wall body 14 is preferably a lightweight steel sheet pile.
    • 要解决的问题:使得可以在现有的结构如现有的独立式房屋和邻近的房屋之间的狭窄的地方进行液体对策的工作,默默地和低价地进行。解决方案:在结构10正下方的基础12 被壁体14连续包围,壁体14的下端14a位于基座12的液化层12b中。壁体14在基座12的周围被向下按压在结构10周围,使得基座紧紧地在下面 结构体10被壁体14连续包围。壁体14的下端14a保持在基座12的液化层12b的内部。优选地,壁体14的下端14a位于1/3至2 基础12的液化层12b的深度的/ 3。结构10优选地是现有的结构,例如现有的独立式房屋。 壁体14优选为轻质钢板桩。
    • 4. 发明专利
    • Soil retaining wall block, soil retaining wall, and construction method for the same
    • 土壤保持墙块,土壤保持墙及其构造方法
    • JP2014009554A
    • 2014-01-20
    • JP2012148678
    • 2012-07-02
    • Jfe Metal Products & Engineering IncJfe建材株式会社
    • KIMURA SHIGEAKIYOSHIKAWA HIROYUKITSURUMI AKITOSHIASAI NOBUHIDE
    • E02D29/02
    • PROBLEM TO BE SOLVED: To provide a soil retaining wall block including a filling material storage frame body having at least a front face frame body formed of a concrete plate and other face frame bodies each formed of at least one of a wavy steel plate and a concrete plate to produce high strength resulting in improved stability, which can be easily constructed without being restricted by the size and type of a filling material, to require a lower construction cost and achieve an excellent view, and to provide a soil retaining wall constructed by the soil retaining wall blocks and a construction method for the same.SOLUTION: The soil retaining wall block includes a filling material storage frame body 1, and a filling material 2 stored in the filling material storage frame body 1. The filling material storage frame body 1 has a front frame body 3, a back frame body 4, a left side frame body 5 and a right side frame body 6 assembled in a square shape. The front frame body 3 is formed of a concrete plate, and the back frame body 4, the left side frame body 5 and the right side frame body 6 are each formed of a liner plate.
    • 要解决的问题:提供一种土壤挡土墙块,其包括填充材料储存框架体,该填充材料储存框架主体至少具有由混凝土板和其它面框架体形成的至少一个前表面框架主体,每个框架体由波状钢板和 混凝土板,以产生高强度,从而提高稳定性,其可以容易地构造而不受填充材料的尺寸和类型的限制,需要较低的施工成本和实现优异的视野,并且提供一种由 挡土墙块及其施工方法。土壤挡土墙块包括填充材料储存框架体1和储存在填充材料储存框架体1中的填充材料2.填充材料储存框架体 1具有组装成正方形的前框体3,后框体4,左侧框架体5和右侧框体6。 前框体3由混凝土板形成,后框体4,左侧框架体5和右侧框架体6均由衬板形成。