会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • METHOD FOR OPERATING A GAS TURBINE
    • 操作气体涡轮的方法
    • US20090260368A1
    • 2009-10-22
    • US12471665
    • 2009-05-26
    • Eribert BenzPeter FlohrAdnan ErogluFelix GuetheJaan Hellat
    • Eribert BenzPeter FlohrAdnan ErogluFelix GuetheJaan Hellat
    • F02C7/22
    • F02C6/003C10J3/00C10J2300/093C10J2300/0959C10J2300/1606C10J2300/165C10J2300/1671C10J2300/1675C10J2300/1678C10J2300/1892F02C3/28F25J3/04545F25J3/04575Y02E20/16Y02E20/18
    • A method for operating a gas turbine (11), which is used especially in a combined-cycle power plant (30), includes inducting and compressing air by the gas turbine (11), the compressed air is fed to a combustor (18, 19) for the combustion of a syngas which is produced from coal, and the hot gases which result during the combustion are expanded in a subsequent turbine (16, 17), performing work, wherein some of the compressed air is separated into oxygen and nitrogen, and the oxygen is used in a coal gasification plant (34) for producing the syngas. With such a method, a reduction of the NOx emission is achieved without noticeable loss of output and flexibility of operation by a gas turbine (11) with reheating being used, which includes two combustors (18, 19) and two turbines (16, 17), wherein in the first combustor (18) syngas is combusted, using the compressed air, and the resulting hot gases are expanded in the first turbine (16), and wherein in the second combustor syngas is combusted, using the gases which issue from the first turbine (16), and the resulting hot gases are expanded in the second turbine (17), the two combustors (18, 19) are operated with undiluted syngas, and the flame temperature (TF) in the first combustor (18) of the gas turbine (11) is lowered compared with the operation with natural gas (TNG), while the second combustor (19) is operated largely in the normal operation (TNG) which is designed for natural gas.
    • 用于特别在联合循环发电厂(30)中使用的燃气轮机(11)的方法包括:通过燃气轮机(11)对空气进行吸入和压缩,将压缩空气供给至燃烧器(18), 19),用于燃烧由煤产生的合成气,并且在燃烧期间产生的热气体在随后的涡轮机(16,17)中膨胀,进行工作,其中一些压缩空气被分离成氧和氮 ,并且在用于生产合成气的煤气化设备(34)中使用氧气。 通过这样的方法,可以实现NOx排放的减少,而不会出现明显的输出损失和使用具有再加热的燃气轮机(11)的操作灵活性,其包括两个燃烧器(18,19)和两个涡轮机(16,17) ),其中在所述第一燃烧器(18)中,使用所述压缩空气燃烧合成气,并且所得热气体在所述第一涡轮机(16)中膨胀,并且其中在所述第二燃烧器中合成气被燃烧,使用从 第一涡轮机(16),并且所产生的热气体在第二涡轮机(17)中膨胀,两个燃烧器(18,19)用未稀释的合成气进行操作,并且第一燃烧器(18)中的火焰温度(TF) 与天然气(TNG)的运转相比,燃气轮机(11)的运转下降,而第二燃烧器(19)在为天然气设计的正常运行(TNG)中运行较大。
    • 4. 发明申请
    • Method for operating a gas turbine and a gas turbine for implementing the method
    • 用于操作燃气轮机和用于实施该方法的燃气轮机的方法
    • US20070033942A1
    • 2007-02-15
    • US11275477
    • 2006-01-09
    • Eribert BenzPeter FlohrJaan HellatGraham Webb
    • Eribert BenzPeter FlohrJaan HellatGraham Webb
    • F02C6/18
    • F02C6/10F02C3/205Y02E20/16
    • In a method for operating a gas turbine (11) in a combined cycle power plant (40) air is drawn in and compressed through the gas turbine (11), the compressed air is led to a combustor (18, 19) to burn a syngas recovered from a fossil fuel, especially coal, and the gases that result in the course of the combustion are expanded in a downstream turbine (16, 17). In such a method, an improved degree of efficiency is achieved by virtue of the fact that a gas turbine (11) with reheating is used, which includes two combustors (18, 19) and two turbines (16, 17), whereby in the first combustor (18), syngas is burned with the compressed air, and the resultant hot gases, e.g., flue gases, are expanded in the first turbine (16), and whereby in the second combustor syngas is burned by means of the gases coming from the first turbine (16) and the resultant hot gases are expanded in the second turbine (17).
    • 在组合循环发电厂(40)中操作燃气轮机(11)的方法中,空气被吸入并压缩通过燃气轮机(11),压缩空气被引导到燃烧器(18,19)以燃烧 从化石燃料,特别是煤回收的合成气,并且导致燃烧过程的气体在下游涡轮机(16,17)中膨胀。 在这种方法中,通过使用具有再加热的燃气轮机(11),其包括两个燃烧器(18,19)和两个涡轮机(16,17),因此可以实现提高的效率。 第一燃烧器(18),合成气用压缩空气燃烧,并且所产生的热气体,例如烟道气体在第一涡轮机(16)中膨胀,并且由此在第二燃烧器中,合成气通过气体来燃烧 并且所产生的热气体在第二涡轮机(17)中膨胀。
    • 5. 发明授权
    • Method for operating a gas turbine and a gas turbine for implementing the method
    • 用于操作燃气轮机和用于实施该方法的燃气轮机的方法
    • US07574855B2
    • 2009-08-18
    • US11275477
    • 2006-01-09
    • Eribert BenzPeter FlohrJaan HellatGraham Webb
    • Eribert BenzPeter FlohrJaan HellatGraham Webb
    • F02C1/06
    • F02C6/10F02C3/205Y02E20/16
    • In a method for operating a gas turbine (11) in a combined cycle power plant (40), air is drawn in and compressed though the gas turbine (11), the compressed air is led to a combustor (18, 19) to burn a syngas recovered from a fossil fuel, especially coal, and the gases that result in the course of the combustion are expanded in a downstream turbine (16, 17). In such a method, an improved degree of efficiency is achieved by virtue of the fact that a gas turbine (11) with reheating is used, which includes two combustors (18, 19) and two turbines (16, 17); in the first combustor (18), syngas is burned with the compressed air, and the resultant hot gases, e.g., flue gases, are expanded in the first turbine (16), and in the second combustor syngas is burned by the gases coming from the first turbine (16), and the resultant hot gases are expanded in the second turbine (17).
    • 在组合循环发电厂(40)中操作燃气轮机(11)的方法中,空气被吸入并通过燃气轮机(11)压缩,压缩空气被引导到燃烧器(18,19)以燃烧 从化石燃料,特别是煤回收的合成气,并且导致燃烧过程的气体在下游涡轮机(16,17)中膨胀。 在这种方法中,通过使用具有再加热的燃气轮机(11),其包括两个燃烧器(18,19)和两个涡轮机(16,17),实现了提高的效率。 在第一燃烧器(18)中,合成气用压缩空气燃烧,并且所产生的热气体,例如烟道气体在第一涡轮机(16)中膨胀,并且在第二燃烧器中,合成气被来自 第一涡轮机(16),并且所产生的热气体在第二涡轮机(17)中膨胀。