    • Tunnel excavating method, movable cross-sectional cutter and master-slave shield machine
    • 隧道掘进方法,可移动交叉切割机和主离合机
    • JP2005273398A
    • 2005-10-06
    • JP2004091788
    • 2004-03-26
    • Ishikawajima Harima Heavy Ind Co LtdTaisei Corp大成建設株式会社石川島播磨重工業株式会社
    • TAKAMIZAWA KAZUOKANEKO KENICHIOHATA YUTAKAITO KENTODO NORIYUKISHIMADA TETSUJIADACHI HIDEAKIHIROTOMI SATOSHIYOSHIDA YUZURUNAKANE TAKASHITOMIMATSU HIROAKISUGIMORI MAKOTOOZAKI MASAYA
    • E21D9/087E21D9/06
    • PROBLEM TO BE SOLVED: To excavate and construct a new tunnel having a circular cross section and a deformed cross section without performing open-cut work. SOLUTION: This tunnel excavating method changes a tunnel cross section to a deformed cross section having a shape different from this cross section from a substantially circular cross section or to the substantially circular cross section from its deformed cross section in the middle of excavating and constructing the tunnel by a shield machine 1. Blade-like face plates 23 and 53 freely protruding and retreating in the shield radial direction from peripheral edges 22 and 54 of deformed cutter face plates are arranged on the deformed cutter face plates 9 and 52 formed in deformed cross-sectional shapes. A cutter is formed so as to become a circular cross-sectional shape when projecting its blade-like face plates 23 and 53. A circular cross section is excavated by projecting the blade-like face plates 23 and 53 in a circularly excavated cross section. The blade-like face plates 23 and 53 are stored in the deformed cutter face plates 9 and 52 when excavating the deformed cross section, and excavation is performed by the deformed cutter face plates 9 and 52. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:挖掘和建造具有圆形横截面和变形横截面的新隧道,而不进行开切式作业。 解决方案:这种隧道掘进方法将隧道横截面改变为具有与该横截面不同的形状的变形横截面从基本上圆形的横截面或从挖掘中间的变形横截面到大致圆形的横截面 并通过盾构机1构造隧道。在形成有变形的切割面板9和52的变形的切割面板的周边边缘22和54上,沿屏蔽径向自由地突出和退回的刀片状面板23和53 在变形的横截面形状。 当将刀片状面板23和53投影时,切割器形成为圆形的横截面形状。通过将叶片状面板23和53以圆形挖掘的横截面突出来挖出圆形横截面。 当挖掘变形的横截面时,叶片状的面板23和53被存储在变形的切割面板9和52中,并且通过变形的切割面板9和52进行挖掘。(C)2006 ,JPO&NCIPI
    • 4. 发明专利
    • Connecting device for segment and construction method of tunnel
    • 隧道分段连接装置及隧道施工方法
    • JP2006057382A
    • 2006-03-02
    • JP2004242246
    • 2004-08-23
    • Ishikawajima Harima Heavy Ind Co LtdTaisei Corp大成建設株式会社石川島播磨重工業株式会社
    • TAKAMIZAWA KAZUOITO KENADACHI HIDEAKIYOSHIDA YUZURUNAKANE TAKASHITOMIMATSU HIROAKI
    • E21D9/06E21D11/40
    • PROBLEM TO BE SOLVED: To provide a connecting device for segments and a construction method of a tunnel by which underground structures are connected to each other surely while absorbing a positional deviation of the underground structures.
      SOLUTION: The connecting device 22 is for connecting the segments 8, 15 of underground structures 9, 11 to each other using a bolt 26 and a nut 27 so that the underground structure 9 which is constructed by assembling the segments 8 may be connected to the other underground structure 11 which is constructed by assembling the segments 15 to be adjacent to the underground structure 9. In the connecting device 22 for the segments 8, 15, a spherical surface receiving seat 23 is formed on each of the segments 8, 15 which are to be connected together. Spherical members 24, 25 are rotatably fitted to the spherical surface receiving seats 23, respectively. A bolt 26 is fitted to one of the spherical members 24, 25, and a nut 27 is fitted to the other spherical member.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种用于段的连接装置和隧道的施工方法,其中地下结构彼此牢固地连接,同时吸收地下结构的位置偏差。

      解决方案:连接装置22用于使用螺栓26和螺母27将地下结构9,11的段8,15彼此连接,使得通过组装段8构造的地下结构9可以是 连接到通过组装邻近地下结构9的段15构造的另一个地下结构11.在用于段8,15的连接装置22中,在每个段8上形成球面接收座23 ,15要连接在一起。 球形构件24,25分别可旋转地装配到球面接收座23。 螺栓26装配到球形构件24,25中的一个上,并且螺母27装配到另一个球形构件。 版权所有(C)2006,JPO&NCIPI

    • 7. 发明专利
    • Displacement measuring device
    • 位移测量装置
    • JP2006038681A
    • 2006-02-09
    • JP2004220175
    • 2004-07-28
    • Ci Tec KkTaisei CorpTokyo Electric Power Co Inc:Theシーアイテック株式会社大成建設株式会社東京電力株式会社
    • ITO KENTAKAMIZAWA KAZUOOGASAWARA KUNIHIROOKUBO HIDEYASUGA NAOYOSHIEBIHARA TORUMINEGISHI SATORUTAKEUCHI TOMOAKINAKAI HIDENOBUTAKAHASHI AKIRA
    • G01C15/00E21D11/00E21F17/00G01C7/06
    • PROBLEM TO BE SOLVED: To provide a displacement measuring device capable of measuring displacement of an internal space of a structure having a circular section accurately at a desired point of time.
      SOLUTION: This displacement measuring device 1 for measuring displacement at each of three or more measuring points installed on the inner wall in the same circular section in the structure having the internal space having a circular sectional shape, is equipped with a distance variation measuring device 20 for measuring the distance variation between each adjacent measuring point before and after displacement, an angle variation measuring device 30 for measuring the angle variation of the inner wall at each adjacent measuring point before and after displacement, and a position coordinate calculation means 14 for calculating the position coordinate of each measuring point after displacement from each data on the distance and the angle between each adjacent measuring point before displacement, and on the distance variation and the angle variation of the inner wall between each adjacent measuring point.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种位移测量装置,其能够在期望的时间点精确地测量具有圆形截面的结构的内部空间的位移。 解决方案:用于测量安装在具有圆形截面形状的内部空间的结构中的同一圆形部分的内壁上的三个或更多个测量点的位移的位移测量装置1配备有距离变化 用于测量位移之前和之后的每个相邻测量点之间的距离变化的测量装置20,用于测量位移之前和之后的每个相邻测量点处的内壁的角度变化的角度变化测量装置30和位置坐标计算装置14 用于计算位移后的每个测量点在距离上的每个数据的位置坐标和位移之前的每个相邻测量点之间的角度以及每个相邻测量点之间的内壁的距离变化和角度变化。 版权所有(C)2006,JPO&NCIPI
    • 8. 发明专利
    • Segment with bag
    • 带袋子
    • JP2008069542A
    • 2008-03-27
    • JP2006248248
    • 2006-09-13
    • Ishikawajima Constr Materials Co LtdTaisei Corp大成建設株式会社石川島建材工業株式会社
    • KOBAYASHI KAZUHIROOTA KATSUYASHIMIZU RYOICHIYAMAMURA MANABUFUNAKOSHI MAKOTOITO KENKATAGIRI TOSHIYA
    • E21D11/15E21D11/00
    • PROBLEM TO BE SOLVED: To provide a segment with a bag, preventing shifting of a protector and breakage of a locking part for locking the protector, and suitably performing tunnel construction work. SOLUTION: This segment B with bag includes: a segment body 1 formed like a circular arc along the natural ground face of a tunnel digging pile; and a bag body 2 disposed on the natural ground face side of the segment body 1 and fitted to the outer peripheral side. The plate-like protector 3 covering and protecting the bag body 2 is provided on the outer peripheral side of the segment body 1, and both sides extending in the peripheral direction of the outer peripheral surface 1e of the segment body 1 are provided with locking parts 10 projecting outward in the radial direction from the outer peripheral surface 1e, and extended in the circumferential direction to lock both edges of the protector 3. The peripheral end of the outer peripheral surface 1e of the segment body 1 is provided with a support part 11 regulating the movement in the peripheral direction of the protector 3. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了提供具有袋的段,防止保护器的移动和用于锁定保护器的锁定部分的断裂,以及适当地执行隧道施工工作。 解决方案:具有袋的该段B包括:沿隧道挖掘桩的自然地面形成为圆弧状的段体1; 以及设置在节段主体1的自然地面侧并配合到外周侧的袋体2。 覆盖并保护袋体2的板状保护器3设置在节段主体1的外周侧,并且沿着节段主体1的外周面1e的周向延伸的两侧设置有锁定部 10从外周面1e沿径向向外突出,并且在圆周方向上延伸以锁定保护器3的两个边缘。段体1的外周面1e的外周端设置有支撑部11 调节保护器3的周向运动。版权所有:(C)2008,JPO&INPIT
    • 9. 发明专利
    • Vertical shaft
    • 竖井
    • JP2014091946A
    • 2014-05-19
    • JP2012242399
    • 2012-11-02
    • Taisei Corp大成建設株式会社
    • ITO KENHIROTOMI SATOSHIMASUDA KIYOSHI
    • E21D9/14
    • PROBLEM TO BE SOLVED: To provide a vertical shaft capable of effectively suppressing noises, which are generated during construction work within the vertical shaft and a tunnel communicating with the vertical shaft and propagated to the ground from the vertical shaft, within the vertical shaft.SOLUTION: In a vertical shaft 10 for use in construction work, a first sound insulation material 3 assuming an annular shape from an edge of a pit mouth 2 of the vertical shaft 10 overhangs to the inside of the pit mouth 2; a cylindrical sound absorption material 4 is suspended from an inside edge of the first sound insulation material 3; the inside of the vicinity of the pit mouth of the vertical shaft 10 is completely enclosed with the cylindrical sound absorption material 4; and a second sound insulation material 5 assuming a cylindrical shape is attached to a pit wall-side surface of the cylindrical sound absorption material 4.
    • 要解决的问题:提供一种垂直轴,其能够有效地抑制在垂直轴内的施工作业期间产生的噪声和与垂直轴连通并在垂直轴内传播到地面的隧道。 在用于施工作业的立轴10中,从垂直轴10的坑口2的边缘突出到凹坑2的内侧,呈现环状的第一隔音材料3; 圆柱形吸声材料4从第一隔音材料3的内边缘悬挂下来; 垂直轴10的坑口附近的内部与圆柱形吸声材料4完全包围; 并且在圆柱形吸声材料4的凹坑壁侧表面上安装有呈圆柱形的第二隔音材料5。