会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • A MARINE TENSIONER
    • 海上起重机
    • WO2012064185A3
    • 2012-08-16
    • PCT/NL2011050760
    • 2011-11-08
    • ITREC BVROODENBURG JOOPNOUWENS RONNY LAMBERTUS WALTHERUS
    • ROODENBURG JOOPNOUWENS RONNY LAMBERTUS WALTHERUS
    • F16L1/23
    • F16L1/23B63B35/03B65H51/105F16L1/235
    • The invention is directed to a marine tensioner (1) for handling an elongated article from an offshore vessel. The tensioner comprises a tensioner frame (11), multiple track units (20), wherein each track unit comprises an elongated chassis (30) and an endless track supported by said chassis, wherein between the chassis of each track unit and the tensioner frame a connecting structure (40,140) is provided that at least allows for lateral motion of the track unit with respect to the passage axis (26) so as to adapt the position of the track unit. For each track unit a group of hydraulic squeeze cylinders (50a, 50b, 50c) is provided between the tensioner frame and the chassis of the track unit. The tensioner further comprises a tilting mechanism (60) for the group of squeeze cylinders of each track unit, said tilting mechanism being adapted to tilt the hydraulic squeeze cylinders of a track unit between an operative position, wherein the squeeze cylinders are operative to exert a squeeze force in use of the tensioner for handling an elongated article, and an oversized article passage position.
    • 本发明涉及一种用于处理来自海上船舶的细长物品的船用张紧器(1)。 张紧器包括张紧器框架(11),多个轨道单元(20),其中每个轨道单元包括细长底盘(30)和由所述底盘支撑的环形轨道,其中在每个轨道单元的底盘与张紧器框架a之间 提供连接结构(40,140),其至少允许轨道单元相对于通道轴线(26)的横向运动,以便适应轨道单元的位置。 对于每个轨道单元,一组液压挤压缸(50a,50b,50c)设置在张紧器框架和轨道单元的底盘之间。 张紧器还包括用于每个轨道单元的一组挤压缸的倾斜机构(60),所述倾斜机构适于使履带单元的液压挤压缸在操作位置之间倾斜,其中挤压缸可操作地施加 使用张紧器处理细长物品的挤压力以及超大物品通道位置。
    • 3. 发明申请
    • OFFSHORE VESSEL, MARINE PIPELINE INSTALLATION SYSTEM AND METHOD
    • 海洋船舶,海洋管道安装系统和方法
    • WO2016175652A9
    • 2017-02-23
    • PCT/NL2016050223
    • 2016-03-31
    • ITREC BV
    • ROODENBURG JOOPNOUWENS RONNY LAMBERTUS WALTHERUSSTAVENUITER WILCO
    • F16L1/20
    • F16L1/203F16L1/23
    • The present invention relates to a vessel (1) adapted to perform subsea wellbore related operations including module handling and laying flexible pipeline, e.g. wellbore intervention, said vessel comprising a hull (2) with a moonpool (5) and a stationary drilling mast adjacent said moonpool. The front side of the drilling mast (10) is provided with vertical trolley rails (11) along which - during module handling - a module handling trolley (12) is movable. Further one or more tensioners (30, 31) are provided to engage a flexible pipeline, also being supported by the by the drilling mast. The tensioner frame (30f) of a tensioner is mounted pivotably about a vertical pivot axis (PA) to the drilling mast, such that the tensioner frame is pivotable between the pipeline laying configuration wherein the lower tensioner is provided in the module handling area and an open configuration wherein a vertical trolley path is unobstructed to allow module handling.
    • 本发明涉及适于执行海底井眼相关操作的船舶(1),包括模块处理和铺设柔性管道,例如, 所述容器包括具有月球(5)的船体(2)和与所述月球相邻的固定式钻杆。 钻桅杆(10)的前侧设置有垂直手推车轨道(11),在模块处理期间,模块处理手推车(12)可移动。 还有一个或多个张紧器(30,31)设置成接合柔性管道,该管道也由钻桅杆支撑。 张紧器的张紧器框架(30f)围绕垂直枢转轴线(PA)可枢转地安装到钻桅杆,使得张紧器框架在管道铺设构造之间枢转,其中下张紧器设置在模块处理区域中, 打开配置,其中垂直手推车路径不被阻挡以允许模块处理。
    • 4. 发明申请
    • MARINE PIPELINE INSTALLATION SYSTEM AND MARINE PIPELINE INSTALLATION METHOD
    • 海洋管道安装系统和海洋管道安装方法
    • WO2016133388A2
    • 2016-08-25
    • PCT/NL2016050112
    • 2016-02-18
    • ITREC BV
    • ROODENBURG JOOPNOUWENS RONNY LAMBERTUS WALTHERUS
    • F16L1/20
    • F16L1/20F16L1/202F16L1/203F16L1/207
    • The present invention relates to a marine pipeline installation system and marine pipeline installation method. The marine pipeline installation system comprises a pipeline launch tower for launching the pipeline in a firing line along said pipeline launch tower into the sea, and one or more tensioners supported by the pipeline launch tower. The system further comprises a pipeline guide supported in a pipeline launch trajectory between a pipeline storage and the firing line above the one or more tensioners, wherein the pipeline guide is provided opposite the firing line relative to the pipeline launch tower. A guide support structure is provided, which is embodied as a single-sided guide support arm arranged on one side of the pipeline guide only.
    • 本发明涉及一种船用管道安装系统和船用管道安装方法。 海运管道安装系统包括一个管道发射塔,用于沿着沿着管线发射塔进入大海的发射线发射管道,以及由管道发射塔支撑的一个或多个张紧器。 所述系统还包括管道引导件,所述管道导管支撑在所述管道存储器与所述一个或多个张紧器上方的所述击发线之间的管道发射轨迹中,其中所述管道引导件设置成相对于所述管线发射塔与所述发射线相对。 提供了一种引导支撑结构,其被实施为仅布置在管道引导件的一侧上的单面引导支撑臂。