会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Software procurement supporting system, software procurement supporting device, software procurement supporting program and computer-readable recording medium for recording software procurement supporting program
    • 软件采购支持系统,软件采购支持设备,软件采购支持程序和计算机可读记录介质,用于记录软件采购支持程序
    • JP2005339155A
    • 2005-12-08
    • JP2004156436
    • 2004-05-26
    • Hitachi Ltd株式会社日立製作所
    • HIGUCHI KIYOSHITAKAMURA TOSHIKOTAKAHASHI YUKI
    • G06Q30/06G06Q50/00G06Q50/10G06F17/60
    • PROBLEM TO BE SOLVED: To grasp the specialty field of an order receiving candidate in advance when procuring software. SOLUTION: A software procurement supporting device 10 is equipped with a communication part 11, an information processing part 12 and a processing part 13 for controlling both the parts. The processing part 13 includes a candidate retrieving part 131 and a candidate providing part 132. When receiving the order conditions regarding software to be procured corresponding to a language and machine type from an order side terminal 30, the candidate retrieving part 131 retrieves the order receiving candidates of the software to be procured meeting with the order conditions from a recorded data file 124. The candidate providing part 132 extracts the results of failure confirmation tests regarding the procured software entities that were actually ordered in the past from the recorded data file 124, correlates the extracted test results to the order receiving candidate and provides the correlation to the order side terminal 30. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:在采购软件时,提前了解接收候选人的订单的专业领域。 解决方案:软件采购支持设备10配备有通信部件11,信息处理部件12和用于控制这两个部件的处理部件13。 处理部分13包括候选检索部分131和候选提供部分132.当从订单侧终端30接收到与语言和机器类型对应的要采购的软件的订单条件时,候选检索部分131检索订单接收 要从采集的软件的候选者根据订单条件从记录的数据文件124中会议。候选提供部分132从记录的数据文件124提取关于过去实际排序的采购的软件实体的故障确认测试的结果, 将提取的测试结果与订单接收候选者相关联,并向订单侧终端30提供相关性。版权所有(C)2006,JPO&NCIPI
    • 2. 发明专利
    • Document management system
    • 文件管理系统
    • JP2005235111A
    • 2005-09-02
    • JP2004046742
    • 2004-02-23
    • Hitachi Information & Control Systems IncHitachi Ltd株式会社 日立ハイコス株式会社日立製作所
    • OIWA KOJITAKAMURA TOSHIKOMORITA KENICHIKATO YUKIYOSHIEGUCHI HIDEYUKI
    • G06F17/21
    • PROBLEM TO BE SOLVED: To provide a technology for creating one document collectively by a plurality of operators. SOLUTION: The document management system includes a client 110 and a server 120. The server 120 receives a document file and the classification information of the document file transmitted from the client 110, stores the information in an area 123 for work as a configurational structure in project units, reads out the document file specified by an acquisition request from the client 110 managed from the area 123 for work, and transmits the file to the client 110. The client 110 is provided with an editor 114 for specifying a desired document file, requesting the acquisition of the document file to the server 120, correcting the document file acquired from the server 120 according to an instruction from the operator, and a network interface 111 for transmitting the corrected document file to the server. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供由多个操作者集体地创建一个文档的技术。 文件管理系统包括客户机110和服务器120.服务器120接收从客户端110发送的文档文件和文档文件的分类信息,将该信息存储在工作区域123中作为 从项目单位的构造结构中读取从用于工作的区域123管理的客户端110中的获取请求指定的文档文件,并将该文件发送给客户端110.客户端110被提供有编辑器114,用于指定期望的 文档文件,请求将文档文件获取到服务器120,根据来自操作者的指示来校正从服务器120获取的文档文件;以及网络接口111,用于将修正的文档文件发送到服务器。 版权所有(C)2005,JPO&NCIPI
    • 3. 发明专利
    • Process control system, process control method, program, and process control device
    • 过程控制系统,过程控制方法,程序和过程控制设备
    • JP2013030036A
    • 2013-02-07
    • JP2011166253
    • 2011-07-29
    • Hitachi Ltd株式会社日立製作所Hitachi Information & Control Solutions Ltd株式会社日立情報制御ソリューションズ
    • HAYASHI YOSHITSUGUTAKAMURA TOSHIKO
    • G06F9/44G06Q10/06
    • PROBLEM TO BE SOLVED: To improve the accuracy of man-hour estimation in managing the process of a project in software development.SOLUTION: A process control system 10 comprises an analysis server 1 that calculates an estimated value that shows an estimation of man hour required for tasks included in a project for which a new estimation of man hour is to be performed, the estimation of man hour being obtained by reading out process control information including information on past tasks from a task information database 3 and analyzing the process control information. The process control system also comprises an information server 2 that is selected by a manager terminal 5 connected to the information server 2 through a network and that instructs the manager terminal 5 and a responsible person terminal 6 to display, as analysis information, an estimated value of man hour obtained as a result of the analysis by the analysis server on the tasks included in the project for which the new estimation of man hour is to be performed.
    • 要解决的问题:提高软件开发项目管理过程中人力资源估算的准确性。 解决方案:过程控制系统10包括分析服务器1,该分析服务器1计算显示对于将要执行新的男性时间估计的项目所包括的任务所需的人工小时估计值的估计值, 通过从任务信息数据库3读出包括关于过去任务的信息的过程控制信息并分析过程控制信息来获得人工小时。 过程控制系统还包括由通过网络连接到信息服务器2的管理终端5选择的信息服务器2,并且指示管理者终端5和负责人终端6作为分析信息显示估计值 通过分析服务器对包括在将要执行新的人工时间估计的项目中的任务进行分析的结果获得的人工小时数。 版权所有(C)2013,JPO&INPIT
    • 4. 发明专利
    • Remote maintenance method and system for mobile body mounting device
    • 远程维护方法和系统的移动体安装设备
    • JP2008299378A
    • 2008-12-11
    • JP2007141642
    • 2007-05-29
    • Hitachi Ltd株式会社日立製作所
    • MIYAZAKI MASAKIMARUYAMA HISAYUKINISHIDA TAKEHIKOTAKAMURA TOSHIKO
    • G06F9/445
    • PROBLEM TO BE SOLVED: To flexibly update a program for each train by remote maintenance by updating the programs of processors 13-15 arranged in the respective trains 7-9 by remote maintenance without neither uselessly increasing a load on a communication network 2 nor depending on the travel schedules of the respective trains 7-9.
      SOLUTION: Update version programs for the processors are registered in a remote maintenance device 1, and distributed to a distribution program save area 22 when the processors 13-15 of the respective trains 7-9 are in communicable states. The programs are copied in an update version program save area 20. Then, the programs are updated by changing-over an operation program save area 18 and the update version program save area 20 and performing restarting.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了通过远程维护来灵活地更新每个列车的程序,通过远程维护更新布置在各列火车7-9中的处理器13-15的程序,而不会在通信网络2上没有无用地增加负载 也不取决于各列火车7-9的行程表。 解决方案:处理器的更新版本程序被登记在远程维护设备1中,并且当相应列车7-9的处理器13-15处于可通信状态时,分发到分发程序保存区域22。 将程序复制到更新版本程序保存区域20.然后,通过切换操作程序保存区域18和更新版本程序保存区域20来更新程序,并执行重新启动。 版权所有(C)2009,JPO&INPIT
    • 5. 发明专利
    • File configuration management system
    • 文件配置管理系统
    • JP2007279883A
    • 2007-10-25
    • JP2006102966
    • 2006-04-04
    • Hitachi Ltd株式会社日立製作所
    • KAMIMURA NAOKITAKAMURA TOSHIKOSUGIMURA YOSHIKANE
    • G06F9/44G06F12/00
    • PROBLEM TO BE SOLVED: To improve system development efficiency by preventing omission of reflection in a derived system whose update is necessary.
      SOLUTION: This database is provided with a file information table 22 for recording all files included in every system; a derived information table 31 for recording a relationship between a derived origin file and a derived destination file; and an update information table 23 for managing the update information of the file of the other system based on the derived information table 31 when a file belonging to the other system has a derived relationship with the file of its own system. A file configuration management device 1 is provided with a function for retrieving the file information table 22 in confirming the circumstances of the file configuring this system, and for retrieving the update information of the file from the update information table 23, and for displaying a file list screen for displaying that the file having the derived relationship has been updated and an update information management function 13 for completing the confirmation of the update information in order to prevent omission of confirmation of the update information.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:通过防止在需要更新的派生系统中省略反射来提高系统开发效率。 解决方案:该数据库具有用于记录包含在每个系统中的所有文件的文件信息表22。 导出信息表31,用于记录导出的原始文件和导出的目的地文件之间的关系; 以及更新信息表23,用于当属于另一系统的文件与其自己的系统的文件具有派生关系时,基于导出的信息表31来管理其他系统的文件的更新信息。 文件配置管理装置1具有在确认配置该系统的文件的情况下检索文件信息表22的功能,并从更新信息表23检索文件的更新信息,并且显示文件 用于显示具有导出关系的文件已经被更新的列表屏幕和用于完成更新信息的确认的更新信息管理功能13,以防止省略更新信息的确认。 版权所有(C)2008,JPO&INPIT
    • 6. 发明专利
    • Design information management method and system
    • 设计信息管理方法与系统
    • JP2007199755A
    • 2007-08-09
    • JP2006013950
    • 2006-01-23
    • Hitachi Ltd株式会社日立製作所
    • FUNAHASHI YOSHIMITAKAMURA TOSHIKOKORI SHINGO
    • G06F9/44G06Q50/00G06Q50/04
    • G06F8/10
    • PROBLEM TO BE SOLVED: To provide a design information management method and system that manage relationship between pieces of design information when a software deliverables is corrected and can certainly recognize whether the design information in an upstream process is developed to the design information in a downstream process. SOLUTION: The design information management system comprises a deliverables storage section 107 for storing the software deliverables based on a description rule of the software deliverables, and a design information storage section 104 for storing the design information and relevant information between pieces of design information. The design information management system comprises a design information analysis section 110 that has a function of extracting a design information identification ID showing the relationship between design information identification ID and design information and upstream software deliverables from the software deliverables, stores the design information in the software deliverables every design information identification ID, and stores the relationship between design information identification IDs in the software deliverables. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种设计信息管理方法和系统,其在软件可交付物被校正时管理设计信息之间的关系,并且可以肯定地识别上游过程中的设计信息是否被开发为设计信息 下游流程。

      解决方案:设计信息管理系统包括可交付存储部分107,用于基于软件可交付物的描述规则存储软件交付物;以及设计信息存储部分104,用于存储设计信息和相关信息之间的设计 信息。 设计信息管理系统包括设计信息分析部分110,其具有从软件交付物提取设计信息识别ID和设计信息与上游软件交付物之间的关系的设计信息标识ID,将设计信息存储在软件中 可交付成果每个设计信息识别ID,并存储设计信息识别ID在软件交付物中的关系。 版权所有(C)2007,JPO&INPIT

    • 7. 发明专利
    • Material preparation support method and sample production support server
    • 材料制备支持方法和样品生产支持服务器
    • JP2006190142A
    • 2006-07-20
    • JP2005002338
    • 2005-01-07
    • Hitachi Ltd株式会社日立製作所
    • HASHIMOTO HIDENORITAKAMURA TOSHIKO
    • G06F17/21
    • PROBLEM TO BE SOLVED: To solve the problem of conventional material preparation of requiring a lot of labor in discovering a reusable portion. SOLUTION: A material preparation support server 101 and a material-preparing terminal 102 (103) is provided on a network 105, and the material preparation support server 101 exhibits choices of a condition determining a configuration of material to a user. An item (a framework) to be recorded as the material and a candidate of contents (substance) of the usable material are determined according to the condition selected by the user, and the optimum framework and the reusable substance wherein they are associated are exhibited. By a result thereof, a material file produced by the user is received by the material preparation support server 101, and the material file is decomposed and classified on the basis of the framework, the substance and information about the association, and is stored in a database 104 in a format wherein a portion newly produced and added by a material preparation person is reusable. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了解决在发现可再利用部分时需要大量劳动的常规材料制备的问题。 解决方案:材料准备支持服务器101和材料准备终端102(103)被提供在网络105上,并且材料准备支持服务器101展示了确定用户的材料配置的条件的选择。 根据用户选择的条件确定要记录为材料的物品(框架)和可用材料的内容(物质)的候选物,并显示它们相关联的最佳框架和可重复使用的物质。 其结果是,材料制作支援服务器101接收由用户生产的材料文件,并根据框架,物质和关联关联信息对材料文件进行分解分类,并存储在 数据库104,其中由材料准备人员新生产和添加的部分可重复使用的格式。 版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • プロジェクト見積り支援装置、プロジェクト見積り支援方法
    • 项目估算支持设备和项目估算支持方法
    • JP2014215710A
    • 2014-11-17
    • JP2013090668
    • 2013-04-23
    • 株式会社日立製作所Hitachi Ltd
    • OGURA TAKAHIROKUBOTA ATSUSHIISHIBASHI HISAYATAKAMURA TOSHIKOKORI SHINGOKAMIMURA NAOKI
    • G06Q30/06G06Q10/06
    • G06Q10/06G06Q30/06
    • 【課題】容易に適切なプロジェクトの見積りを得られる技術を提供する。【解決手段】プロジェクト見積り支援装置であって、プロジェクトごとに、一または複数の非数値の情報を含む属性情報を格納する記憶部と、見積り対象のプロジェクトについて一または複数の非数値の情報を含む属性情報の入力を受け付ける属性情報受付部と、属性情報受付部により受け付けた属性情報の非数値の情報を含む一部または全部の属性情報を用いて、記憶部に格納されたプロジェクトから類似するプロジェクトを抽出する類似プロジェクト抽出部と、類似する順にプロジェクトおよび当該プロジェクトに関する情報を出力する出力部と、を備えることを特徴とする。【選択図】図1
    • 要解决的问题:提供允许容易获得足够的项目估计的技术。解决方案:项目估计支持设备包括:存储部分,用于存储包括每个项目的一个或多个非数值信息的属性信息; 属性信息接收部分,用于接收包括要估计的项目的一个或多个非数值信息的属性信息的输入; 一种类似的项目提取部分,用于使用包括由属性信息接收部分接收的属性信息的非数值信息的部分或全部属性信息从存储在存储部分中的项目中提取类似项目; 以及用于以相似性的顺序输出项目和关于项目的信息的输出部分。
    • 10. 发明专利
    • Design information management device
    • 设计信息管理设备
    • JP2008059236A
    • 2008-03-13
    • JP2006234845
    • 2006-08-31
    • Hitachi Ltd株式会社日立製作所
    • MATSUBARA SHIGEKITAKAMURA TOSHIKOFUNAHASHI YOSHIMI
    • G06F11/28
    • PROBLEM TO BE SOLVED: To provide a design information management device capable of certainly verifying whether unexpected influence appears because of a change of a program in a function related to the change of the program.
      SOLUTION: This design information management device has: a product storage part 107 storing a software product; a design information storage part 104 storing design information or related information; a verification information storage part 109 storing verification time information; and a means having a function extracting relation between an upstream software product, and the design information and a design information identification ID from the software product, and managing the design information in design information identification ID units. The design information management device also has: a means managing relation between the design information identification IDs; a means retrieving the higher-rank design information than the design information to be changed, and extracting a verification item to be reverified; a means presenting verification order; and a means presenting a verification time of reverification.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种设计信息管理装置,其能够肯定地验证由于与节目的改变有关的功能中的节目的改变而出现意外影响。 解决方案:该设计信息管理装置具有:存储软件产品的产品存储部107; 存储设计信息或相关信息的设计信息存储部分104; 存储验证时间信息的验证信息存储部109; 以及具有上游软件产品和来自软件产品的设计信息和设计信息标识ID之间的功能提取关系的装置,以及管理设计信息识别ID单元中的设计信息。 设计信息管理装置还具有:管理设计信息识别ID之间的关系的装置; 检索与要改变的设计信息相比较的高级设计信息的方法,以及提取要重新验证的验证项目; 提供验证令的手段; 以及提供重新验证验证时间的方法。 版权所有(C)2008,JPO&INPIT