会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明授权
    • Copying apparatus
    • 复印机
    • US5093687A
    • 1992-03-03
    • US732530
    • 1991-07-19
    • Hiroshi TaguchiAkira IgarashiHiroyoshi Nakano
    • Hiroshi TaguchiAkira IgarashiHiroyoshi Nakano
    • G03B27/18G03B27/08G03D7/00
    • G03B27/08G03D7/00
    • A developing unit comprising a developing chamber having an upper film pass roller and a lower film pass roller, a gasifying chamber, and a heating chamber, discharging outlets connecting from the heating chamber to the developing chamber at upper and lower portions of the upper film pass roller, and sucking inlets connecting from the developing chamber to the gasifying chamber at upper and lower portions of the lower film pass roller, so that the surface area of each sucking inlet is made substantially equal to that of each discharging outlet. This improves convection efficiency of the hot blast and thus temperature differences between the upper and lower portions within the developing chamber thereby preventing tone variations of the copied images.
    • 一种显影单元,包括具有上膜通过辊和下膜通过辊,气化室和加热室的显影室,在上膜通道的上部和下部排出与加热室连接的显影室的显影室 辊和从下显影辊的上部和下部从显影室连接到气化室的吸入口,使得每个吸入口的表面积基本上等于每个排出口的表面积。 这提高了热风的对流效率,从而改善了显影室内的上部和下部之间的温差,从而防止了复印图像的色调变化。
    • 10. 发明授权
    • Dynamic loading test equipment for a real-size vibration-controlling damper
    • 用于实际振动控制阻尼器的动态负载测试设备
    • US06412348B1
    • 2002-07-02
    • US09591046
    • 2000-06-09
    • Hirokazu IemuraAkira Igarashi
    • Hirokazu IemuraAkira Igarashi
    • G01M702
    • G01M7/00G01M17/04
    • A floorboard 5 is supported on bridge gate shaped piers 2 so as to move horizontally by rollers 4 provided at the corners of the floorboard. Rubber members 7 installed between the floorboard 5 and the piers 2 restoring force to restitute elastically the floorboard to a neutral position when the floorboard moves horizontally. A shaker 8, which is fixed on the floorboard 5, excites the floorboard linearly and reciprocally by a weight 12 movable along a ball screen shaft 11 with a motor 10. The inertia force of the floorboard 5 generates, in a real-size and real-time scale, vibration for a main structure to which a vibration-controlling damper 15 is installed. The vibration of the floorboard 5 is inputted to the damper 15 and the dynamic response of the damper is observed by a computer 14.
    • 地板5被支撑在桥形门墩2上,以便通过设置在地板块角落处的辊4水平地移动。 当地板块水平移动时,安装在地板5和码头2之间的橡胶构件7将恢复力弹性地恢复到中间位置。 固定在地板5上的振动台8通过马达10沿着球筛轴11可移动的重物12线性地并且平行地激发地板。地板5的惯性力以实际尺寸和实际值产生 对于安装有防振阻尼器15的主结构的时间刻度,振动。 地板5的振动被输入到阻尼器15,并且计算机14观察到阻尼器的动态响应。