    • 1. 发明专利
    • Method of reinforcing banking for filling existing valley and wetland
    • 用于填充现有谷物和湿地的加固方法
    • JP2007239276A
    • 2007-09-20
    • JP2006061975
    • 2006-03-08
    • Hazama Corp株式会社間組
    • MIHARA MASAYAYAMAZAKI TSUTOMU
    • E02D17/18E02D3/046E02D3/10E02D17/20
    • PROBLEM TO BE SOLVED: To provide a method of reinforcing a banking used for existing building lots and roads capable of reinforcing at relatively low cost without affecting valley and wetland burying banking part.
      SOLUTION: In this method of reinforcing the banking for burying the existing valley and wetland buried with sandy soil, drain pipes are installed at the banking part at predetermined intervals. A vibration generator is disposed on the surface of the banking. A small vibration not substantially producing the change of density in the sandy soil, for example, the vibration of approximately 5×10
      -4 to 2×10
      -3 in strain level of the ground is repeatedly given to the banking by approximately 10,000 times or more to increase the rigidity and the strength of the ground.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种加强对现有建筑物和用于相对较低成本加固的道路的银行的方法,而不影响谷和湿地掩埋银行部分。 解决方案:采用这种加固现有山体和埋藏在沙土中的湿地的银行业务方式,排水管以预定的间隔安装在银行部分。 振动发生器设置在银行业务的表面上。 基本上不产生沙质土壤密度变化的小振动,例如应变水平下约5×10 -4 至2×10 -3 的振动 的地面反复给银行约10,000次以上,以增加地面的刚性和强度。 版权所有(C)2007,JPO&INPIT
    • 2. 发明专利
    • Reinforcement structure of dam body
    • AM AM。。。。。。。。。。。
    • JP2007278042A
    • 2007-10-25
    • JP2006109540
    • 2006-04-12
    • Hazama CorpTokyo Kiban Giken Kk東京基盤技研株式会社株式会社間組
    • ADACHI YUJIMIHARA MASAYAKATAYAMA KEIJI
    • E02B3/04E02D17/18
    • PROBLEM TO BE SOLVED: To provide a reinforcement structure of a dam body which can sufficiently enhance the strength of the dam body as a whole, exhibits an effect also on the bending moment, can be formed to have a proper three-dimensional structure according to the dam body itself and the surrounding environment, has high cutoff performance, has favorable workability, and causes no damage to the dam body during construction. SOLUTION: A reinforcing wall body 4 constructed in the dam body 2 has the three-dimensional structure in which a plurality of vertical walls 5a, 5b are spaced out in the width direction of the dam body 2. The reinforcing wall body 4 is constructed in a manner that a solidification material is solidified in the ground of the dam body. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了提供能够充分提高坝体整体强度的坝体的加强结构,也能够对弯矩产生影响,可以形成为具有适当的三维 根据坝体本身和周围环境的结构,具有较高的切割性能,具有良好的可加工性,施工期间不会对坝体造成损坏。 解决方案:在坝体2中构造的加强壁体4具有多个垂直壁5a,5b在坝体2的宽度方向上间隔开的三维结构。加强壁体4 以凝固材料在坝体的地面固化的方式构造。 版权所有(C)2008,JPO&INPIT