会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • CONNECTION STRUCTURE OF FUEL STORAGE POOL
    • JPH03131798A
    • 1991-06-05
    • JP26975289
    • 1989-10-17
    • HITACHI LTD
    • TSUDA TORUMATSUMOTO TAKASHIOKINO YASUYUKI
    • G21C19/07G21C19/32
    • PURPOSE:To transport a large amount of used fuel at a time by composing a connection passage of a large-diameter communication hole in a closed section shape and a bellows type expansible joint. CONSTITUTION:Communication holes 9 and 10 which have large diameters and are sectioned rectangularly are formed in vertical wall parts 7 and 8 facing fuel storage pools 1 and 2 at mutual matching positions and the communication holes 9 and 10 are connected by the bellows type expansible joint 11 made of stainless steel which has a large diameter and is sectioned rectangularly. Consequently, if an earthquake takes places, two buildings behave differently, but the relative displacement in the earthquake is absorbed by the motion of the bellows type expansible joint 11 to increase the safety. Further, the communi cation holes 9 and 10 and bellows type expansible joint 11 are sectioned rectangu larly, namely, in the closed section shape, so a decrease in the strength of the vertical wall parts 7 and 8 is minimized to maintain the soundness in an earth quake.
    • 5. 发明专利
    • Partitioning device for covering body of weld zone of hermetically sealed enclosure
    • 用于覆盖密封外壳的焊接区域的分隔装置
    • JPS6131935A
    • 1986-02-14
    • JP15467784
    • 1984-07-25
    • Hitachi Ltd
    • TSUDA TORUFURUKAWA HIDEYASUOYAMADA OSAMU
    • G01M3/04G01M3/02
    • G01M3/022
    • PURPOSE:To partition the covering body without welding the hermetically sealed enclosure to a structure body by fixing a partition plate to the covering body by melt-sticking, etc., and sealing the gap between the partition plate and a metallic plate with a gasket having elasticity. CONSTITUTION:Partition plates 6A and 6B are fixed to the covering body by melt-sticking, etc., and the gap between the partition plates 6A and 6B and metallic plate is sealed with the gasket 8 having elasticity. In this case, when the gasket 8 is pressed to seal the gap, the space in a test channel 1 is partitioned into two independent spaces with the partition plates 6A and 6B and those spaces are shield from each other and held airtight. Then, piping is performed and pressure air is fed to the spaces to test airtightness. Similarly, the range of the test is narrowed down successively to a specific partition position to form a small area, and then the covering body is partitioned without welding the sealed container to the structure body.
    • 目的:为了将覆盖体分隔开而不用将密封的外壳焊接到结构体上,通过熔融粘合等将隔板固定到覆盖体上,并用隔离板和金属板之间的间隙密封, 弹性。 构成:隔板6A和6B通过熔融粘合等固定到覆盖体上,隔板6A和6B与金属板之间的间隙被具有弹性的垫圈8密封。 在这种情况下,当按压垫圈8以密封间隙时,测试通道1中的空间被分隔成具有分隔板6A和6B的两个独立空间,并且这些空间彼此保护并保持气密。 然后,执行管道并将压力空气供给到空间以测试气密性。 类似地,试验的范围依次变窄到特定的分隔位置以形成小的面积,然后将密封容器与结构体焊接而将覆盖体分隔开。