会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • MANAGEMENT SYSTEM FOR WATER NET WORKS DISTRIBUTION SYSTEM
    • JPH1185217A
    • 1999-03-30
    • JP25770997
    • 1997-09-05
    • HITACHI LTD
    • WATANABE TADAOTATE JINPEINOBUTOMO YOSHIHIRO
    • E03B1/00G05B9/02G05B15/02G05B17/02G05D7/06G06Q50/00G06Q50/06
    • PROBLEM TO BE SOLVED: To correctly prepare a water operation plan at the time of emergency in a water net works distribution system in accordance with a real operation by taking into consideration a faulty recovery time of equipment. SOLUTION: This management system purifies water taken from a source of water and supplies it to a distributing reservoir, and consists of a calculating device for managing a water processing facility and a distributing water pipe network disposed in a water net works distribution system for supplying water to a group of consumers, an external storage device and a display device. Herein, the calculating device is provided with an operating plan generation part 106 for generating an operation plan for a water processing facility and the distributing water pipe network, a current condition and case fetch part 107 for fetching monitoring control data and facility data from the external storage device and obtaining a distributing water path, a faulty set part 108 for fetching a recovery time of a facility faulty and operating the data generated by the current condition and case fetch part, and an operating plan improvement part 109 for fetching the data generated by the faulty set part as an initial operating plan and improving it.
    • 6. 发明专利
    • PLANNING SUPPORT SYSTEM FOR WATER UTILIZATION
    • JPH07113253A
    • 1995-05-02
    • JP26209893
    • 1993-10-20
    • HITACHI LTD
    • OBA MASAHIROTATE JINPEIHIROSE TADASHI
    • G09B3/00E03B1/00G06F9/44G06N5/04G06Q50/00G06Q50/06G06F17/60
    • PURPOSE:To make development of a specific algorithm for planning unnecessary by a method wherein retrieval of working examples is made, based on problem circumstances and the result of execution on a model using an example, in a step of example retrieval, and a working plan is modified to suit itself to the problem circumstances. CONSTITUTION:A model program and a characteristic amount extracting program are actuated in order to evaluate how close do working examples and working plan match with a working strategy and conditions attached. In the first place, related examples are retrieved by means of index retrieval in an example retrieval step for retrieving an example suitable to conditions for planning of a working plan out of an example DB, and the result of a second retrieval is sought for the retrieved example. Based on the result of the output, an example serving as a base for the working plan is specified out of the examples outputted from the second retrieval in a step for producing the working plan suitable to the circumstances, and an initial data for the working plan is produced, based on the specification, with reference an to a monitoring-controlling system DB. Furthermore, final values are determined after improvement is made so that the contents of the working plan become suitable to the circumstances.