会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • Maintenance supporting method for equipment and facility
    • 设备和设施的维护支持方法
    • JP2004145496A
    • 2004-05-20
    • JP2002307780
    • 2002-10-23
    • Hitachi Ltd株式会社日立製作所
    • GOTO JINICHIRO
    • G06Q50/06G05B23/02G06Q50/00G06Q50/10G06Q90/00G06F17/60
    • Y04S10/54
    • PROBLEM TO BE SOLVED: To rationalize the preventive maintenance of a plant or equipment and facilities. SOLUTION: This maintenance supporting method for supporting the maintenance of equipment and facilities, the maintenance scheduled period of equipment and facilities is updated by using a loss function L(t) defined for each equipment facility, and a loss function L(t0) changing with time is calculated based on the information of the equipment and facilities changing with time acquired by remotely monitoring the equipment and facilities, and at least either the optimal check interval or optimal conservation limit is calculated based on the calculated loss function, and the maintenance scheduled time t2 of the equipment and facilities is updated based on the calculated optimal check interval or optimal conservation limit. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:使工厂或设备和设施的预防性维护合理化。

      解决方案:通过使用为每个设备设施定义的损失函数L(t)来更新用于支持设备和设施维护的维护支持方法,设备和设施的维护预定时间,以及损失函数L(t0 )随时间变化的计算是根据设备和设施随时间变化的信息进行计算的,通过远程监控设备和设施获取的时间,并且基于计算出的损失函数计算最优检查间隔或最优守恒极限, 基于计算出的最佳检查间隔或最佳保存限值来更新设备和设施的维护预定时间t2。 版权所有(C)2004,JPO

    • 6. 发明专利
    • POWER UTILIZATION SYSTEM
    • JP2002342418A
    • 2002-11-29
    • JP2001148160
    • 2001-05-17
    • HITACHI LTD
    • HARUYAMA HIROSHIGOTO JINICHIROISHIDA TAKESHINAGABUCHI NAOYUKIHORIE TORUARAKI KENJI
    • G06Q50/06G06Q50/00H02J3/00H02J3/46G06F17/60
    • PROBLEM TO BE SOLVED: To support forming of a power receiving contract or the execution of the contract by selecting a power supplier meeting the requirements of a power demander. SOLUTION: This system is provided with a power utilization information providing means 5 which is connected with a plurality of power demanders 1 and a plurality of power suppliers 2 to obtain desire information 9 of the respective power demander to the power supplier and power generation information 10 being the power supplying condition of the respective power supplier and to transmit the obtained desire information 9 and the power generation information 10 respectively to the demanders 1 and the suppliers 2, a monitor 8 for monitoring a power quantity to be supplied to the demanders from the suppliers and the quality of power to be supplied and transmitting the monitoring results as power monitoring information, and a banking means 6, which manages receiving of power charges for the power demanders, information providing charge for information provided by the power utilization information providing means and a penalty charge to the power suppliers in the case of not meeting the power supplying conditions based on the power monitoring information.
    • 7. 发明专利
    • Performance diagnostic method and performance diagnostic system of gas turbine
    • 性能诊断方法和气体涡轮机性能诊断系统
    • JP2009047092A
    • 2009-03-05
    • JP2007214932
    • 2007-08-21
    • Hitachi Ltd株式会社日立製作所
    • YOSHIDA TAKUYAMORIKAWA TOSHIHIROGOTO JINICHIROHAYASHI YOSHIHARU
    • F02C9/00F02C9/28
    • F02D41/0007Y02T10/144
    • PROBLEM TO BE SOLVED: To accurately diagnose performance of a gas turbine by adjusting a few factors without relying on a complicated means.
      SOLUTION: A gas turbine diagnostic system has a performance calculation circuit for calculating and outputting power generation output and the exhaust temperature of the gas turbine by receiving input of the intake temperature, the compressor pressure ratio and a fuel flow rate measured by an actual machine, and an evaluation circuit for evaluating performance based on a deviation between the power generation output outputted from the performance calculation circuit and an actual machine measured value of the exhaust temperature, and is provided with a correction circuit for setting a correction fuel flow rate provided by the calculation to the input to the performance calculation circuit by calculating a correction value of a value of the fuel flow rate based on the intake temperature, the compressor pressure ratio and the actual machine measured value of the fuel flow rate.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:通过调整几个因素来精确地诊断燃气轮机的性能,而不依赖于复杂的手段。 解决方案:燃气轮机诊断系统具有一个性能计算电路,用于通过接收输入的进气温度,压缩机压力比和燃料流量测量的燃料流量来计算和输出燃气轮机的发电输出和排气温度 实际机器和用于基于从性能计算电路输出的发电输出与实际机器测量值之间的偏差来评估性能的评估电路,并且设置有校正电路,用于设定校正燃料流量 通过基于进气温度,压缩机压力比和燃料流量的实际机器测量值计算燃料流量的值的校正值,通过计算提供给对性能计算电路的输入。 版权所有(C)2009,JPO&INPIT
    • 8. 发明专利
    • Apparatus and method for measuring gap in equipment seal
    • 用于测量设备密封缝隙的装置和方法
    • JP2006242924A
    • 2006-09-14
    • JP2005063100
    • 2005-03-07
    • Hitachi Ltd株式会社日立製作所
    • GOTO JINICHIROAOTO HIROAKI
    • G01B21/16F01D11/02F01D25/00
    • PROBLEM TO BE SOLVED: To provide an apparatus and method for measuring a gap in an equipment seal that can achieve rationalization, in the measurement work of a seal gap, and to improve the reliability of a measured value.
      SOLUTION: The apparatus for measuring the gap of the equipment seal, which measures the gap between a seal 101 and a turbine rotor 215 is equipped with a sensor 2, which is arranged between the seal 101 and the rotor 215, for measuring the seal gap between the seal 101 and the rotor 215; an electronic tag 9 for storing the measurement data measured by this sensor 2; and a sheet 1, which is a base for pasting the sensor 2 and electronic tag 9, formed by flexible materials.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种用于测量在密封间隙的测量工作中可以实现合理化的设备密封件中的间隙的装置和方法,并且提高测量值的可靠性。 解决方案:用于测量密封件101和涡轮转子215之间的间隙的设备密封件间隙的测量装置配备有传感器2,传感器2设置在密封件101和转子215之间,用于测量 密封件101和转子215之间的密封间隙; 用于存储由该传感器2测量的测量数据的电子标签9; 以及作为用于粘贴由柔性材料形成的传感器2和电子标签9的基座的片材1。 版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • Power supply facility and management method therefor
    • 电力设施及其管理方法
    • JP2003271233A
    • 2003-09-26
    • JP2002075387
    • 2002-03-19
    • Hitachi Ltd株式会社日立製作所
    • GOTO JINICHIROSEKIHARA TAKASHIFURUKAWA MASAO
    • G05B23/02
    • PROBLEM TO BE SOLVED: To solve problems in managing a distributed power supply facility reliably. SOLUTION: A distributed power supply management apparatus 4 attached to a distributed power supply 1 which can be detached and exchanged, a diagnosis apparatus 5 attached to inside the management apparatus 4 which can be detached and exchanged, and a recording medium 6, are provided. When taking out a recorded content in the diagnosis apparatus and the recording medium, a replacement of the management apparatus 4 is attached to the distributed power supply to continue to operate the distributed power source, and recorded information is taken out from the detached management apparatus 4 to help management. COPYRIGHT: (C)2003,JPO
    • 解决问题:可靠地解决管理分布式供电设备的问题。 解决方案:安装在能分离和更换的分布式电源1上的分布式电源管理装置4,安装在管理装置4的内部,可拆卸和交换的诊断装置5,以及记录介质6, 被提供。 当在诊断装置和记录介质中取出记录的内容时,管理装置4的更换被附接到分布式电源以继续操作分布式电源,并且从分离的管理装置4中取出记录的信息 帮助管理。 版权所有(C)2003,JPO