会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Crawler
    • 履带
    • US06634725B2
    • 2003-10-21
    • US10169996
    • 2002-07-12
    • Genroku SugiyamaWataru IdetsuAkihiko YamamotoYuji YoshitomiAkiomi Kono
    • Genroku SugiyamaWataru IdetsuAkihiko YamamotoYuji YoshitomiAkiomi Kono
    • B62D2516
    • B62D55/211B62D55/21
    • Hardened surface layers (12) and (14) of a nitride or other compound, which is higher in hardness than dirt or soil, are formed on the inner peripheral surface (11B) of each metal bush (11) and on the outer peripheral surface (13A) of each connecting pin (13) which constitute a crawler belt (7), respectively. In addition, resinous sliding bearings (15) are fitted in transversely spaced positions on the inner periphery of each metal bush (11) of the crawler belt. Bearing (15) is provided with recessed grooves (16). Accordingly, part of soil or dirt which intrudes into a gap space between an outer link portion (9) of a track link and a metal bush (11) through an annular seal member (17) is trapped on an inner peripheral surface (15A) of the bearing (15).
    • 在每个金属衬套(11)的内周面(11B)和外周面上形成硬度高于污物或土壤的氮化物或其它化合物的硬化表面层(12)和(14) (13)的每个连接销(13A)分别构成履带(7)。 此外,树脂滑动轴承(15)在履带的每个金属衬套(11)的内周上以横向间隔的位置装配。 轴承(15)设有凹槽(16)。 因此,通过环形密封构件(17)侵入到轨道连杆的外链节(9)和金属衬套(11)之间的间隙空间中的一部分土壤或污物被捕获在内周面(15A)上, 的轴承(15)。
    • 2. 发明授权
    • Crawler belt
    • 履带
    • US06390572B1
    • 2002-05-21
    • US09600284
    • 2000-07-14
    • Wataru IdetsuGenroku SugiyamaYoshiaki SekiguchiKazuyoshi Hatano
    • Wataru IdetsuGenroku SugiyamaYoshiaki SekiguchiKazuyoshi Hatano
    • B60S162
    • B62D55/21B62D55/0887
    • The present invention concerns a crawler belt (7) incorporating a sealing devices (21), which are each constituted by a coned disc spring (23) and a seal ring (22), to seal up gap spaces between track links (8) and bushes (13). A seal anchor hole (12) is provided in each one of outer link portions (9) of track links (8) of the crawler belt (7), and the sealing device (21) is fitted in the seal anchor hole (12) between an outer link portion (9) and an opposing end face (13A) of a bush (13). The sealing device (21) includes the seal ring (22) in the shape of an O-ring, and the coned disc spring (23) which is arranged to press the seal ring (22) resiliently against peripheral wall surface (12B) of the seal anchor hole (12) and the end face (13A) of the bush (13).
    • 本发明涉及一种包括密封装置(21)的履带(7),每个密封装置(21)由螺旋形弹簧(23)和密封环(22)构成,以密封轨道连杆(8)和 灌木丛(13)。 在履带(7)的轨道连杆(8)的外链节(9)的每一个中设置有密封锚定孔(12),并且密封装置(21)装配在密封锚定孔(12)中, 在外连杆部分(9)和衬套(13)的相对端面(13A)之间。 密封装置(21)包括O形圈形式的密封环(22)和盘形弹簧(23),其被设置成将密封环(22)弹性地压靠在外壁表面(12B)上 密封锚定孔(12)和衬套(13)的端面(13A)。
    • 3. 发明授权
    • Method of producing spray deposit on bearing boss
    • 在轴承座上产生喷雾沉积的方法
    • US06678956B2
    • 2004-01-20
    • US09980086
    • 2001-11-30
    • Wataru IdetsuRyohei SuzukiOsamu Gokita
    • Wataru IdetsuRyohei SuzukiOsamu Gokita
    • C23C400
    • B23P13/00C23C4/01F16C11/045Y10T29/49636Y10T29/49647Y10T29/49677Y10T29/49705Y10T29/49707Y10T29/4981Y10T29/49812Y10T29/49986
    • Prior to forming a thermal spray coating layer (28) on an end face (23B′) of a structural base material (23′) to be shaped into a boss, firstly an inner masking member (32) is fitted in an original hole (23A′) of the structural base material (23′) and then an outer masking member (33) is fitted on outer peripheral side of the structural base material (23′). In the next place, by the use of a hard material, a thermal spray coating layer (28) is formed on an annular coating area (23B1′) which is exposed between the inner and outer masking members (32) and (33). Surface areas on the end face (23B′) of the structural base material (23′), corresponding to an allowance range of a machining operation by which the original hole (23A′) is ultimately shaped into a joint pin hole of a specified diameter, are left as a non-coating area (23B2′) free of the thermal spray coating layer (28). Therefore, the original hole (23A′) in the structural base material (23′) can be machined into a final joint pin hole by means of a cutting tool, without experiencing cracking troubles which would otherwise occur to the thermal spray coating layer (28) during the machining operation.
    • 在将要成形为凸台的结构基材(23')的端面(23B')上形成热喷涂层(28)之前,首先将内部遮蔽构件(32)装配在原始孔中 23''),然后将外遮光构件(33)装配在结构基材(23')的外周侧。 接下来,通过使用硬质材料,在暴露在内部和外部遮蔽构件(32)和(33)之间的环形涂覆区域(23B1')上形成热喷涂层(28)。 对应于原始孔(23A')最终成形为规定直径的接头销孔的加工操作的允许范围,结构基材(23')的端面(23B')上的表面积 作为没有热喷涂层(28)的非涂覆区域(23B2')。 因此,可以通过切削工具将结构基材(23')中的原始孔(23A')加工成最终的接合销孔,而不会发生热喷涂层(28)否则会发生的开裂故障 )。