会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • SYSTEMS AND METHODS FOR CHANNELING STEAM INTO TURBINES
    • 将蒸汽通入涡轮机的系统和方法
    • US20090217665A1
    • 2009-09-03
    • US12040296
    • 2008-02-29
    • Daniel Francis HolzhauerFernando Javier D'Amato
    • Daniel Francis HolzhauerFernando Javier D'Amato
    • F01K13/02
    • F01K23/108F01D17/00Y02E20/16
    • A method of operating a steam turbine in a combined-cycle power system is provided. The method includes channeling a first amount of steam from a first steam generator to the steam turbine to facilitate powering the steam turbine, generating a second amount of steam within a second steam generator that is coupled in flow communication with the steam turbine, and calculating a predicted stress level within the steam turbine in the event the second amount of steam is channeled from the second steam generator into the steam turbine. An initiation time at which to channel the second amount of steam into the steam turbine is determined such that the calculated predicted stress level will not exceed a predetermined stress limit of the steam turbine. The second amount of steam is automatically channeled from the second steam generator to the steam turbine at the determined initiation time.
    • 提供了一种在联合循环电力系统中操作蒸汽轮机的方法。 该方法包括将来自第一蒸汽发生器的第一量的蒸汽引导到蒸汽涡轮机以便于为蒸汽轮机供电,在第二蒸汽发生器内产生与蒸汽涡轮机流动连通耦合的第二量的蒸汽, 在第二蒸汽量从第二蒸汽发生器引入蒸汽轮机的情况下,在蒸汽涡轮机内预测的应力水平。 确定将第二量的蒸汽引入蒸汽涡轮机的引导时间,使得计算出的预测应力水平不会超过蒸汽轮机的预定应力极限。 在确定的启动时间,第二量的蒸汽被自动地从第二蒸汽发生器引导到蒸汽涡轮机。
    • 4. 发明授权
    • Systems and methods for channeling steam into turbines
    • 将蒸汽引入涡轮机的系统和方法
    • US07937928B2
    • 2011-05-10
    • US12040296
    • 2008-02-29
    • Daniel Francis HolzhauerFernando Javier D'Amato
    • Daniel Francis HolzhauerFernando Javier D'Amato
    • F02C6/00
    • F01K23/108F01D17/00Y02E20/16
    • A method of operating a steam turbine in a combined-cycle power system is provided. The method includes channeling a first amount of steam from a first steam generator to the steam turbine to facilitate powering the steam turbine, generating a second amount of steam within a second steam generator that is coupled in flow communication with the steam turbine, and calculating a predicted stress level within the steam turbine in the event the second amount of steam is channeled from the second steam generator into the steam turbine. An initiation time at which to channel the second amount of steam into the steam turbine is determined such that the calculated predicted stress level will not exceed a predetermined stress limit of the steam turbine. The second amount of steam is automatically channeled from the second steam generator to the steam turbine at the determined initiation time.
    • 提供了一种在联合循环电力系统中操作蒸汽轮机的方法。 该方法包括将来自第一蒸汽发生器的第一量的蒸汽引导到蒸汽涡轮机以便于为蒸汽轮机供电,在第二蒸汽发生器内产生与蒸汽涡轮机流动连通耦合的第二量的蒸汽, 在第二蒸汽量从第二蒸汽发生器引入蒸汽轮机的情况下,在蒸汽涡轮机内预测的应力水平。 确定将第二量的蒸汽引入蒸汽涡轮机的引导时间,使得计算出的预测应力水平不会超过蒸汽轮机的预定应力极限。 在确定的启动时间,第二量的蒸汽被自动地从第二蒸汽发生器引导到蒸汽涡轮机。