热词
    • 5. 发明专利
    • Construction method for cast-in-place concrete pile
    • 混凝土桩施工方法
    • JP2006138067A
    • 2006-06-01
    • JP2004325950
    • 2004-11-10
    • Fujita Corp株式会社フジタ
    • MORI KOICHIYAMAMOTO HIDEAKI
    • E02D13/00
    • PROBLEM TO BE SOLVED: To enhance pile center accuracy in the construction of a cast-in-place concrete pile.
      SOLUTION: A polygonal ruler 2 is formed by pre-laying a temporary material 21 on ground 1 in such a manner that the temporary material 21 is circumscribed with a virtual circle R concentric with a designed pile center P
      O and larger in diameter than a surface layer casing 3; an upper hole 4 is formed by inserting the casing 3 into the surface layer section of the ground 1 in such a manner that the casing 3 is located at an equidistance L
      1 from points C
      X1 , C
      X2 , CX
      Y1 and C
      Y2 of contact between each side 21a of the polygon of the ruler 2 and the virtual circle R; a pile body forming hole 5 concentric with the casing 3 is vertically drilled into the ground 1 from a bottom of the hole 4; and concrete is placed after a cage is vertically inserted into the hole 5.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提高现浇混凝土桩施工中的桩中心精度。 解决方案:通过将临时材料21预先铺设在地面1上,使得临时材料21与设计的桩中心P O同心的虚拟圆R外接,形成多边形尺2, / SB>并且比表面层壳体3的直径大; 通过将壳体3插入到地面1的表面层部分中,使得壳体3位于等距离L 1 的点C < / SB>,C X2 ,CX Y1 和标尺2的多边形的每一侧21a之间的接触的C Y2 R等 与壳体3同心的桩体形成孔5从孔4的底部垂直钻入地面1; 并且在将笼子垂直插入孔5之后放置混凝土。版权所有(C)2006,JPO&NCIPI
    • 6. 发明专利
    • Method for construction of cast-in-place concrete pile, and cage for use in the construction
    • 建筑施工中的混凝土桩的施工方法和施工中使用的笼子
    • JP2005048547A
    • 2005-02-24
    • JP2003283998
    • 2003-07-31
    • Fujita Corp株式会社フジタ
    • MORI KOICHI
    • E02D5/30
    • PROBLEM TO BE SOLVED: To provide a method for construction of a cast-in-place concrete pile, which can increase concrete strength of a pile head part by eliminating variations in the concrete strength of the pile head part.
      SOLUTION: A plurality of rod-shaped high-frequency vibrators 12, which imparts vibrations to concrete, are provided. A plurality of supporting implements 16 are pre-attached to an upper part of a cylindrical cage 14 which is to be installed in a drilled hole H. The cage 14, to which the supporting implements 16 are attached, is installed in the drilled hole H, and the high-frequency vibrators 12 are supported by the supporting implements 16 before the placing of the concrete. Subsequently, the concrete is placed in the hole H; directly after that, the high-frequency vibrators 12 are started so as to vibrate the concrete of the pile head part; and after that, the high-frequency vibrators 12 are pulled upward so that a hardening process can be performed.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种现浇混凝土桩的施工方法,其可以通过消除桩头部分的混凝土强度的变化来增加桩头部分的混凝土强度。 解决方案:提供了向混凝土施加振动的多个杆状高频振动器12。 多个支撑工具16预先附接到要安装在钻孔H中的圆柱形保持架14的上部。支撑工具16所附接的保持架14安装在钻孔H中 并且高频振动器12在放置混凝土之前由支撑工具16支撑。 随后,将混凝土置于孔H中; 在此之后,启动高频振动器12以使桩头部分的混凝土振动; 然后将高频振动器12向上拉,从而可以进行硬化处理。 版权所有(C)2005,JPO&NCIPI
    • 7. 发明专利
    • Cast-in-place concrete pile and its construction method
    • 混凝土混凝土桩及其施工方法
    • JP2006016787A
    • 2006-01-19
    • JP2004193546
    • 2004-06-30
    • Fujita Corp株式会社フジタ
    • MORI KOICHI
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide cast-in-place concrete which makes necessary and sufficient strength possessed by a section from a pile head part to a pipe bottom part and which can reduce costs, and a construction method for the cast-in-place concrete.
      SOLUTION: In the construction of a cast-in-place concrete pile 20, a tremie pipe 16 is inserted into an excavated hole 12, and concrete is poured into the excavated hole 12 from the tremie pipe 16. In that case, the concrete is poured while a leading end of the tremie pipe 16 is embedded in the already poured concrete and while the tremie pipe 16 is gradually pulled up. The amount of cement in the concrete to be poured is increased as the concrete approaches the bottom part 20A of a pile body, an intermediate part 20B of the pile body and the head part 20C of the pile body.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种现浇混凝土,其使得从桩头部分到管道底部部分具有必要且足够的强度,并且可以降低成本,并且用于铸造 - 就地混凝土 解决方案:在现浇混凝土桩20的构造中,将颤音管16插入到挖掘孔12中,并将混凝土从颤音管16注入到挖掘孔12中。在这种情况下, 将混凝土浇注,同时将颤音管16的前端嵌入已经浇注的混凝土中,同时将颤音管16逐渐拉起。 当混凝土接近桩体的底部20A,桩体的中间部分20B和桩体的头部20C时,待浇注的混凝土中的水泥的量增加。 版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • UNDERGROUND SKY PARKING SPACE
    • JPH06299729A
    • 1994-10-25
    • JP11249993
    • 1993-04-16
    • FUJITA CORP
    • HAMAZUKA SEIJIONISHI YASUKAZUMORI KOICHI
    • E02D29/045E04H6/18E04H6/28E21D13/00E02D29/04
    • PURPOSE:To prevent the eccentricity of a building body, and to enable parking even in the underground section of a section, where a car does not approach from a road, by arranging a plurality of parking shafts consisting of box-shaped footings by underground continuous piles to the lower section of a building in a balanced manner and installing a tunnel connecting the bottoms of each parking shaft. CONSTITUTION:Parking shafts 20, 20... composed of underground continuous piles 21 by themselves as box-shaped footings are disposed in a balanced manner in conformity with the position of the outer circumference of a building body 10. When all of parking chambers 23 in the first parking shaft 201 are full, a lifting and lowering cage 31 is lowered up to the bottom 20a of the parking shaft 201, the direction of a car C is conformed to the direction of a moving pallet 41 during standby by the horizontal turning of a turntable 33 mounted on the bottom, and the car C is placed on the pallet 41 and carried horizontally onto the bottom 20a of another parking shaft 20, in which there is an empty chamber, in a tunnel 40, and put on the turntable 33 of a lifting and lowering cage 31 stood by on the bottom 20a. Since the direction of the table 33 is equalized to that of the pallet 41, the table 33 is turned horizontally so as to be adapted to the direction of the lifting and lowering cage 31, the direction of the parking space of the parking chamber 23, lifted and moved by the lifting and lowering cage 31, and entered into the parking chamber 23 as the empty chamber.
    • 10. 发明专利
    • Reinforcing cage for cast-in-place concrete pile
    • 钢筋混凝土桩加固笼
    • JP2004190404A
    • 2004-07-08
    • JP2002361583
    • 2002-12-13
    • Fujita Corp株式会社フジタ
    • TERAOKA MASARUMORI KOICHIEBIKI KIYOTO
    • E02D5/34
    • PROBLEM TO BE SOLVED: To cause no rupture of a weld part between a pile main reinforcement and a reinforcing ring even when horizontal force is applied to a cast-in-place concrete pipe in case of an earthquake or the like.
      SOLUTION: This reinforcing cage 10 is provided with pile main reinforcements 12 passing through vertically, on the outer peripheral surfaces of first reinforcing rings 11a (11) provided at prescribed spaces along a vertical direction. Hoops 13 are provided at suitable spaces in the vertical direction around the pile main reinforcements 12. The pile main reinforcements 12 and the first reinforcing rings 11a (11) are bound with wires, and the reinforcing rings 11b-11d and the pile main reinforcements are fastened by welding. The upper end side of the pile main reinforcements 12 are provided with a pile main reinforcement restraining member 14 to suppress the curvature of the pile main reinforcement 12 in a position above the first reinforcing ring 11a (11) anchored to a foundation slab.
      COPYRIGHT: (C)2004,JPO&NCIPI
    • 要解决的问题:即使在地震等情况下施加水平力施加到现浇混凝土管时,也不会使桩主加强件和加强环之间的焊接部分断裂。 解决方案:该加强保持架10设置有沿着垂直方向穿过在沿垂直方向设置在规定空间的第一加强环11a(11)的外周面上的桩主加强件12。 箍13在垂直方向上围绕桩主加强件12设置在合适的空间处。桩主加强件12和第一加强环11a(11)用钢丝捆扎,加强环11b-11d和桩主加强件 通过焊接固定。 桩主加强件12的上端侧设置有桩主加强件限制构件14,以将桩主加强件12的曲率抑制在锚固到基础板的第一加强环11a(11)上方的位置。 版权所有(C)2004,JPO&NCIPI