会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Ground improving body forming method and apparatus
    • 改善身体形成方法和装置的接地
    • JP2005139863A
    • 2005-06-02
    • JP2003380394
    • 2003-11-10
    • Esutekku:KkFuroo Techno KkShigehito KajiNit:KkToko Corpフローテクノ株式会社東興建設株式会社株式会社エステック株式会社エヌ・アイ・ティ茂仁 鍜治
    • KAJI SHIGEHITOKASHIMA TORUNAKANISHI YASUHARUSAKUMA TAKAOKAWADA MITSURU
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a ground improving body forming method the construction period of which is shortened by simultaneously executing insertion of a steel pipe and formation of a ground improving body and which is excellent in economical effect, and a ground improving body forming apparatus.
      SOLUTION: The ground improving body forming method comprises the steps of simultaneously advancing a pipe 6 having a pipe bit 5 provided at the tip end and a hardening material jetting rod 4 piercing the pipe 6, moving only the rod 4 backward by a specified distance after completion of boring to align hardening material jetting holes and sludge suction holes of both the pipe 6 and the rod 4 to one another, moving the pipe 6 and the rod 4 backward with jetting the hardening material into the ground and discharging the sludge for the primary formation, then advancing only the pipe 6 to align the holes of the rod 4 and other hardening material jetting holes of the pipe with the sludge suction hole for the secondary formation and repeating the above described primary formation and secondary formation to form the ground improving body with the pipe inserted. The ground improving body forming apparatus is also disclosed.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种通过同时执行钢管的插入和地面改进体的形成来缩短施工周期并且经济效果优异的地面改良体形成方法,以及地面改良 身体成型装置。 解决方案:地面改进体形成方法包括以下步骤:同时推进具有设置在尖端处的管5的管6和刺穿管6的硬化材料喷射棒4,仅使杆4向后移动一 在镗孔完成之后的指定距离将管6和杆4的硬化材料喷射孔和污泥吸入孔彼此对准,使管6和杆4向后移动,将硬化材料喷射到地下并排出污泥 对于初级形成,然后仅使管6前进,使杆4的孔和管的其它硬化材料喷射孔与用于二次生成的污泥吸入孔对准,并重复上述初级形成和二次形成 地面改善体与管插入。 还公开了地面改善体形成装置。 版权所有(C)2005,JPO&NCIPI
    • 3. 发明专利
    • High-pressure jetting type grouting method
    • 高压喷射式灌浆方法
    • JP2007056477A
    • 2007-03-08
    • JP2005240564
    • 2005-08-23
    • Estec:KkFuroo Techno KkNit:KkToko Corpフローテクノ株式会社東興建設株式会社株式会社エステック株式会社エヌ・アイ・ティ
    • ODA KEINOSUKESAKUMA TAKAONAKANISHI YASUHARUKASHIMA TORUKAWADA MITSURU
    • E02D3/12
    • PROBLEM TO BE SOLVED: To solve the following problem that, conventionally when a hardener is diagonally or horizontally injected, a pump of standard performance cannot exert sufficient injection pressure and a discharge amount, resulting in insufficient injection, and in order to enhance the injection pressure and the discharge amount during the injection of the hardener into the target ground, a special high-performance pump at a cost equal to three times or more the cost of a standard pump is required.
      SOLUTION: There is provided a multi-injection nozzle 3 composed of a core nozzle and circumferential nozzles enclosing the same, and the nozzles are connected to injection material feeding channels 2a, 2b, etc. , respectively, which then have respective high-pressure pumps arranged therein. Upon the simultaneous pressurization of the pumps, the injection materials are injected in a multi-overlapping manner, and therefore injection pressure of each injection material becomes synergistic, to thereby enhance the injection energy of high-pressure jet of the injection material in the target ground.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 解决以下问题:为了解决以往的问题,通常当硬化剂对角线或水平注射时,标准性能的泵不能施加足够的注射压力和排出量,导致注射不足,并且为了增强 在将硬化剂注入目标地面期间的注射压力和排出量,需要成本等于标准泵的成本的三倍或更多的特殊的高性能泵。 解决方案:提供一个由芯喷嘴和包围其的圆周喷嘴组成的多喷嘴3,并且喷嘴分别连接到注射材料供给通道2a,2b等,然后其分别具有高的 其中布置有压力泵。 在同时对泵进行加压时,以多重重叠的方式喷射注射材料,因此每种注射材料的注射压力变得协调,从而增强注射材料在目标地面中的高压射流的注入能量 。 版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Slime sucking and hardening material injecting method and device
    • SLIME SUCKING AND HARDENING MATERIAL INJECTING METHOD AND DEVICE
    • JP2006045836A
    • 2006-02-16
    • JP2004226353
    • 2004-08-03
    • Estec:KkNit:KkTakku:KkToko Corp有限会社タック東興建設株式会社株式会社エステック株式会社エヌ・アイ・ティ
    • SAWABE ASAOTANAKA HIROYUKIKASHIMA TORUNAKANISHI YASUHARU
    • E02D3/12
    • PROBLEM TO BE SOLVED: To solve the problems of producing waste that a specially injected hardening material is discharged as slime, and thinning a built-up hardening material layer, since excessive suction may be caused, when ground internal pressure of the object ground exceeds a predetermined value, though conventionally an arrival distance of a hardening material jet is extended and the ground internal pressure is adjusted by sucking the generating slime when injecting a ground hardening material. SOLUTION: An adjustably opening-closing shutter 55 is attached to a slime suction hole 5. A ground internal pressure measuring sensor 54 is arranged in a rod tip part. Slime suction corresponding to an internal pressure variation in the object ground by injection pressure of the hardening material, is performed by adjusting opening and closing of the shutter, and the excessive suction is prevented, and proper slime suction force is held. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题为了解决专门注入的硬化材料作为粘液排出的废弃物的生产问题,并且使积聚的硬化材料层变薄,由于可能引起过度的吸入,所以当物体的接地内部压力 接地超过预定值,但是通常当硬化材料射流的到达距离延长并且通过在注入研磨硬化材料时吸附发生粘泥来调节接地内部压力。 解决方案:可调节的开闭闸门55附接到粘液吸入孔5.接地内压测量传感器54布置在杆尖部分中。 通过调节活门的打开和关闭来进行对应于对象地面的内部压力变化的泥浆吸力,并且防止过大的吸力,并且保持适当的粘液吸力。 版权所有(C)2006,JPO&NCIPI