    • 2. 发明专利
    • Structural member
    • 结构会员
    • JP2005273207A
    • 2005-10-06
    • JP2004085190
    • 2004-03-23
    • East Japan Railway Co東日本旅客鉄道株式会社
    • ISHIBASHI TADAYOSHIKUDO SHINJISUGANO TAKAHIROTSUNASHIMA KAZUHIKOSHIRAGAMI AKIRAHOSODA AKIRA
    • E01D1/00E01D2/00E01D19/02E01D101/00E04C3/293
    • PROBLEM TO BE SOLVED: To easily and surely integrate a steel structural material with concrete around the steel structural material.
      SOLUTION: The steel structural material (a steel girder 11) is covered with the expanding material-added concrete 14, and the concrete expands, and is densely filled in the periphery of the steel structural material, and also presses a surface of the steel structural material. By adding fiber to the concrete 14, when the concrete 14 covering the steel structural material tries to expand in the direction for separating from the steel structural material, the fiber restricts this expansion. By forming a plurality of through-holes 15 in the steel structural material, the concrete 14 is also filled in the through-holes 15, to enhance sticking performance of the concrete 14 and the steel structural material. Thus, the concrete 14 and the steel structural material can be surely integrated.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:将钢结构材料与钢结构材料周围的混凝土轻松可靠地结合在一起。 解决方案:钢结构材料(钢梁11)被膨胀材料添加混凝土14覆盖,混凝土膨胀并且密集地填充在钢结构材料的周围,并且还压制 钢结构材料。 通过向混凝土14添加纤维,当覆盖钢结构材料的混凝土14试图在与钢结构材料分离的方向上膨胀时,纤维限制了这种膨胀。 通过在钢结构材料中形成多个通孔15,还将混凝土14填充在通孔15中,以提高混凝土14和钢结构材料的粘附性能。 因此,混凝土14和钢结构材料可以可靠地整合。 版权所有(C)2006,JPO&NCIPI
    • 3. 发明专利
    • Construction girder
    • 建筑师
    • JP2012036615A
    • 2012-02-23
    • JP2010176632
    • 2010-08-05
    • East Japan Railway Co東日本旅客鉄道株式会社
    • KUDO SHINJIGOTO TAKASHITAKANO YUKIHIROYAGINUMA KENICHISHIRAGAMI AKIRA
    • E01B23/00E01B1/00
    • PROBLEM TO BE SOLVED: To broaden an application range of a sleeper width; to simplify construction and enhance riding comfort in a train by reducing processing of a sleeper bearing girder to be used; and to reduce noise and vibration generated due to components by reducing the number of components.SOLUTION: A construction girder 1 is provided with a pair of main girders 4A, 4B disposed along the extension direction of a rail 2, and a sleeper bearing girder 5 disposed toward the direction in which the main girders 4A, 4B separate from each other in the material axis direction. The sleeper bearing girder 5 supports from the lower side a sleeper 3 receiving the rail 2. The main girder 4 is provided with a upper flange 41, a lower flange 42, and a web 43, and a web 53 in the sleeper bearing girder 5 of H-shaped steel material is disposed toward the vertical direction, and a lower flange 52 in the sleeper bearing girder 5 is brought into surface contact with the lower flanges 42 of the main girders 4A, 4B.
    • 要解决的问题:拓宽卧铺宽度的应用范围; 通过减少使用的卧铺轴承梁的加工,简化结构,提高列车乘坐舒适性; 并且通过减少部件的数量来减少由于部件产生的噪音和振动。 解决方案:一个施工梁1设置有沿着轨道2的延伸方向设置的一对主梁4A,4B,以及沿着主梁4A,4B分离的方向设置的轨枕支承梁5 彼此在材料轴方向。 卧铺轴承梁5从下侧支撑接收轨道2的轨枕3.主梁4设置有上凸缘41,下凸缘42和腹板43,以及在卧铺轴承梁5中的腹板53 H形钢材沿垂直方向配置,而在卧铺轴承梁5中的下凸缘52与主梁4A,4B的下凸缘42面接触。 版权所有(C)2012,JPO&INPIT