会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • Method for improving slime left in cast-in-place concrete pile
    • 用于改善混凝土混凝土柱中的泥浆的方法
    • JP2007332722A
    • 2007-12-27
    • JP2006168434
    • 2006-06-19
    • East Japan Railway Co東日本旅客鉄道株式会社
    • NOZAWA SHINICHIROWATANABE AKIYUKINISHIWAKI KEIICHIGENJUN TAKASHIKATO SEISUKE
    • E02D5/34E02D15/06
    • PROBLEM TO BE SOLVED: To provide a method for improving a slime left in a simple cast-in-place concrete pile capable of obtaining a supporting force degree strength at a front end of the pile by pouring a solidification agent without using equipments such as an agitation blade or the like and in spite of different components of the slime left in the pile hole.
      SOLUTION: A method for improving a slime left in a cast-in place concrete pile is characterized in replacing the slime left in the front end of the pile hole with a poured solidification agent and solidifying the slime by inserting a reinforcing basket fixed the solidification agent filling pipe with the pile hole excavated in the ground, by pouring the solidification agent into the front end of the pile hole from the solidification agent filling pipe before placing concrete to the pile hole or after placing concrete to the pile hole.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种改善在简单的现浇混凝土桩中留下的泥浆的方法,其能够通过在不使用设备的情况下浇注固化剂在桩的前端获得支撑力强度 例如搅拌叶片等,并且尽管在桩孔中留下了不同的粘液成分。 解决方案:一种用于改善在浇注混凝土桩中留下的泥渣的方法的特征在于用浇注的固化剂代替桩孔前端留下的泥浆,并通过将固定的加强篮固定 凝固剂灌装管在桩底挖掘出来,将固化剂从凝固剂填充管浇注到桩孔的前端,然后再将混凝土浇筑到桩孔内或将混凝土浇筑到桩孔后。 版权所有(C)2008,JPO&INPIT
    • 7. 发明专利
    • Embedment method of tubular member
    • 管状构件的嵌入方法
    • JP2005133540A
    • 2005-05-26
    • JP2005006431
    • 2005-01-13
    • East Japan Railway Co東日本旅客鉄道株式会社
    • ISHIBASHI TADAYOSHIWATANABE AKIYUKINAGAO TATSUJI
    • E21D9/04
    • PROBLEM TO BE SOLVED: To provide an embedment method of a tubular member capable of facilitating the removal work of an obstacle in the case an element encounters the obstacle when the element is inserted in the ground while excavating the ground by means of the front end.
      SOLUTION: The embedment method of the tubular member is so constituted that the front end section is furnished with an edge by making an axial direction as an insertion direction, at least one opening section 111 is formed in a side wall section 11a extended in the insertion direction and, at the same time, an earth retaining plate 5A capable of coming in and out from the opening section to the outside is provided to the preceding element 11 successively buried by adjacently inserting in the ground while excavating the ground by the front end opening part. When the succeeding element 1A is buried, the earth retaining plate 5A is projected from the opening section of the preceding element 11 to carry out earth retaining of a forward bedrock part of the front end section, even if there is the obstacle hindering the insertion in the ground, the earth retaining plate 5A is projected so that the earth retaining necessary to remove the obstacle can be carried out, and the removal work of the obstacle is thereby facilitated.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种管状构件的嵌入方法,该管状构件能够在元件被插入到地面中时在元件遇到障碍物的情况下便于障碍物的移除工作,同时借助于 前端。 解决方案:管状构件的嵌入方法构造成使得前端部通过使轴向方向作为插入方向而设置有边缘,至少一个开口部111形成在侧壁部11a延伸 在插入方向上,并且同时将能够从开口部分进出外部的接地保持板5A设置到先前的元件11,前面的元件11通过相邻地插入地面中而被相继地埋入,同时挖掘地面 前端开口部分。 当后续元件1A被埋设时,即使存在障碍物插入的障碍物,接地保持板5A从前一元件11的开口部突出,以进行前端部的前方基部的接地保持 地面保持板5A突出,从而可以进行必要的移除障碍物的地面,从而便于障碍物的移除作业。 版权所有(C)2005,JPO&NCIPI
    • 8. 发明专利
    • Construction method of underground structure and its device
    • 地下结构及其装置的施工方法
    • JP2005133521A
    • 2005-05-26
    • JP2003403783
    • 2003-10-28
    • East Japan Railway CoNippon Keemoo Koji Kk日本ケーモー工事株式会社東日本旅客鉄道株式会社
    • ISHIBASHI TADAYOSHISHIMIZU MITSURUWATANABE AKIYUKINISHIJIMA KAZUOKURISU MOTOAKISUZUKI TAKEJISHU SHINJI
    • E21D9/04E21D9/06
    • PROBLEM TO BE SOLVED: To provide a construction method of an underground structure capable of aiming at work comparatively shortening a width of a railway track (or a road), reducing a construction period of time and accomplishing the work even if an arrival shaft can't be installed. SOLUTION: The front end of a propulsion member for preventing the deformation damage of an element is connected to an edge, the element is inserted in the propulsion member from the outside to connect the front end of the element to the edge, an auger is inserted into the inside of the propulsion member, the rear end of a shaft of the auger is connected to a power source, at the same time, the rear end of the propulsion member is also connected to the power source to drive the propulsion member toward the arrival shaft from a starting shaft, and after the element has arrived at the arrival shaft, the auger and the propulsion member are pulled out from the element, the same procedure is repeated to construct an upper floor slab, and then, the construction method of the underground structure constituted of the construction of a side wall section by repeating the same procedure and a device executing the construction method are provided. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种地下结构的施工方法,其能够相对缩短铁路轨道(或道路)的宽度,减少施工时间并完成工作,即使到达 轴无法安装。 解决方案:用于防止元件的变形损坏的推进构件的前端连接到边缘,元件从外部插入到推进构件中,以将元件的前端连接到边缘, 螺旋推入部件插入到推进件的内部,螺旋钻的轴的后端连接到动力源,同时推进件的后端也连接到动力源以驱动推进 构件从启动轴朝向到达轴,并且在元件到达到达轴之后,将螺旋推运器和推进构件从元件中拉出,重复相同的过程以构造上层楼板,然后, 提供了通过重复相同程序构建侧壁部分的地下结构的施工方法和执行施工方法的装置。 版权所有(C)2005,JPO&NCIPI
    • 10. 发明专利
    • Muddy water treatment device and method of treating muddy water
    • 泥浆水处理装置和处理泥水的方法
    • JP2009121121A
    • 2009-06-04
    • JP2007295785
    • 2007-11-14
    • East Japan Railway Co東日本旅客鉄道株式会社
    • WATANABE AKIYUKISAEKI KAZUHIRONISHIWAKI KEIICHIYAMADA KEISUKEKATO SEISUKE
    • E21B43/34C02F1/463C02F1/465E21B21/06
    • PROBLEM TO BE SOLVED: To provide a muddy water separating device capable of keeping constant the quality of muddy water by maintaining the fine fraction ratio of the muddy water within a predetermined range and also provide a method of separating the muddy water. SOLUTION: This muddy water treatment device 10 is used to control the fine fraction ratio of muddy water in a circulation tank 73 used in a cast-in-place pile method. The muddy water treatment device comprises: at least a set of electrodes 11a, 11b so disposed in the circulation tank 73 as to be opposed to each other; a hydrometer 12a and a viscometer 12b used for detecting the fine fraction ratio of the muddy water in the circulation tank 73; an electrode position moving part 16 for moving the position of the electrode 11b; and a fine fraction ratio control part 13 for controlling the coagulated amount of fine fraction by applying a current to the electrode and adjusting the position of the electrode by an electrode position moving part 16 to bring the fine fraction ratio within a predetermined range when the fine fraction ratio is larger than the target value. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种通过将泥浆水的细分比保持在预定范围内而能够保持泥水质量恒定的泥水分离装置,并且还提供了分离泥浆水的方法。 解决方案:该泥浆水处理装置10用于控制在现浇桩方法中使用的循环罐73中的泥水的细分比。 泥浆水处理装置包括:至少一组电极11a,11b,其设置在循环箱73中以彼此相对; 液体比重计12a和粘度计12b,用于检测循环罐73中的泥浆水的微细比例; 用于移动电极11b的位置的电极位置移动部分16; 以及细分比控制部13,用于通过向电极施加电流并通过电极位置移动部16调节电极的位置来控制细小分数的凝固量,以在细微分数比为预定范围内时,微细比例控制部13 分数比大于目标值。 版权所有(C)2009,JPO&INPIT