热词
    • 1. 发明专利
    • Constructing method for tip-reinforcing cast-in-place pile
    • 用于提升加固桩的构造方法
    • JP2006138100A
    • 2006-06-01
    • JP2004327942
    • 2004-11-11
    • East Japan Railway Co東日本旅客鉄道株式会社
    • TANIGUCHI YOSHINORIFUJISAWA HAJIMEHOSHINO TADASHIMATSUO NOBUYUKI
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide a constructing method for a tip-reinforcing cast-in-place pile, which brings about improved construction accuracy and working efficiency, and positively reinforces the ground near the tip of the pile.
      SOLUTION: According to the method of constructing the cast-in-place pile, first a cage (2) having a steel frame (3) attached to the tip thereof is built in an excavated hole. The steel frame (3) has an injection bag (4) set on a bottom thereof. Then the steel frame is crushed by the pile bottom to expand the injection bag on the pile bottom, and a grouting material is injected in the ground with pressure, followed by pressurizing the ground in the vicinity of the pile tip. In the method, an injection pipe (20) for injecting the grouting material into the ground with pressure, and a slime discharging pipe (21), are each formed of a flexible rigid resin hose.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种尖端加固现浇桩的施工方法,其提高了施工精度和工作效率,并且有效地增强了桩顶附近的地面。 解决方案:根据现浇桩的构造方法,首先,在挖掘孔中内置有具有安装在其顶端的钢框架(3)的保持架(2)。 钢框架(3)具有设置在其底部的注射袋(4)。 然后将钢框架由桩底压碎,将桩袋底部的注射袋膨胀,并在压力下将注浆材料注入地面,然后对桩尖附近的地面加压。 在该方法中,将用于将灌浆材料注入地面的注射管(20)和压力排出管(21)分别形成为柔性刚性树脂软管。 版权所有(C)2006,JPO&NCIPI
    • 2. 发明专利
    • Method for improving ground under railway and ground improving rod
    • 改善铁路地基和改善地基的方法
    • JP2006037413A
    • 2006-02-09
    • JP2004216372
    • 2004-07-23
    • East Japan Railway Co東日本旅客鉄道株式会社
    • FUJISAWA HAJIMEMATSUURA KAZUYAHOSHINO TADASHIGENJUN TAKASHI
    • E02D3/12E01B37/00E02D3/00
    • PROBLEM TO BE SOLVED: To provide a means capable of improving the ground so as to improve the bearing power as a direct foundation.
      SOLUTION: Sleepers 4 of a construction site are removed. Ballasts are removed to expose the ground 8 of the construction site. The surface soil of the ground 8 of the construction site is removed. A mixture of regenerated aggregate 10 and a solidification material 12 is injected to the part from which the surface soil is removed, and replaced by the removed surface soil. When the regenerated aggregate 10 and the solidification material 12 replaced by the removed surface soil are solidified, an improved ground 14 is obtained, and the ground of the construction site is strengthened. A receiving girder 16 is laid on the improved ground 14, and a work girder 18 is provided further thereon. An anchor 20 is driven to the ground 8. The earth of the ground 8 of a desired position is excavated and removed, whereby the work girder 18 and a rail 2 can be stably supported by the improved ground 14.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供能够改善地面以便作为直接基础提高轴承功率的装置。 解决方案:拆除施工现场的落枕4。 去除镇流器以暴露施工现场的地面8。 拆除施工现场地面8的表面土壤。 将再生骨料10和固化材料12的混合物注入到除去表面土壤的部分中,并由去除的表面土壤代替。 当由被除去的表面土壤代替的再生骨料10和凝固材料12凝固时,得到改良的地面14,施工部位的地面得到加强。 接收梁16放置在改进的地面14上,并且还在其上设置工作梁18。 锚20被驱动到地面8.挖掘和移除所需位置的地面8的地面,由此工作梁18和轨道2可以由改进的地面14稳定地支撑。版权所有( C)2006,JPO&NCIPI
    • 5. 发明专利
    • Excavation method
    • 挖掘方法
    • JP2007120120A
    • 2007-05-17
    • JP2005313047
    • 2005-10-27
    • East Japan Railway Co東日本旅客鉄道株式会社
    • HOSHINO TADASHINOZAWA SHINICHIROWATANABE AKIYUKIGENJUN TAKASHIMATSUURA KAZUYAWATANABE YASUOSAITO TAKASHIFUJIWARA TORASHIRO
    • E21B7/00
    • PROBLEM TO BE SOLVED: To provide an excavation method which enables the accumulation of a mud cake and slime to be reduced without a decrease in excavation efficiency, in a normal circulation method.
      SOLUTION: Excavation equipment 10 comprises a boring machine 12 and a grout pump 16. Slurry, which is supplied from the grout pump 16, is introduced into the rod pipe 22 of the boring machine 12. A cutter head 24 is provided at the lower end of the rod pipe 22, and an excavation hole H is excavated. The slurry introduced into the rod pipe 22 is supplied into the excavated hole H from a lower end opening of the rod pipe 22. The grout pump 16 supplies the slurry to the boring machine 12. The quantity of the slurry supplied by the grout pump 16 is 0.5-2.1 m
      3 /min, that is, 1.5-5 times as large as the quantity of the slurry supplied in a conventional normal circulation method. Thus, the accumulation of the mud cake and the slime can be reduced without the decrease of the excavation efficiency in the normal circulation method.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种挖掘方法,其能够在正常循环方法中减少泥饼和泥浆的积聚而不降低挖掘效率。 解决方案:挖掘设备10包括镗床12和灌浆泵16.从砂浆泵16供应的浆料被引入镗床12的杆管22中。刀头24设置在 杆管22的下端和挖掘孔H被挖出。 引入杆管22的浆料从杆管22的下端开口供给到挖掘孔H.浆液泵16将浆料供给到镗床12中。浆料泵16供给的浆料量 为0.5-2.1m 3 / SP / min,即以常规正常循环方式供给的浆料的量的1.5-5倍。 因此,在正常循环方式下,不会降低挖掘效率,可以减少泥饼和泥渣的积聚。 版权所有(C)2007,JPO&INPIT
    • 6. 发明专利
    • Construction method for pile draft foundation
    • 基坑施工方法
    • JP2006193977A
    • 2006-07-27
    • JP2005006662
    • 2005-01-13
    • East Japan Railway Co東日本旅客鉄道株式会社
    • FUJISAWA HAJIMEHOSHINO TADASHIMATSUURA KAZUYAGENJUN TAKASHI
    • E02D27/34E02D27/12E02D27/28
    • PROBLEM TO BE SOLVED: To provide a construction method for a pile draft foundation for reducing an amount of settlement.
      SOLUTION: A pile 14 is driven into the ground in a construction section. Next, the foundation 10 is directly installed on it so as to make a head of the pile 14 protruded out of a pile frame 12. A jack receiver 18 is joined with the pile 14 with a bolt 26. A method for joining the pile 14 with the jack receiver 18 may be the other method such as welding. After arranging a jack 30 between the jack receiver 18 and the foundation 10 directly, a force is applied in the direction for pulling out the pile 14 by the jack. A settling load (pre-load) is directly applied on the foundation 10 by a reaction force generated by a friction force on the peripheral face of the pile 14. Lastly, the foundation 10 and the pile 14 are directly connected and integrated to each other by a reinforcing bar 32 to construct the pile draft foundation for reducing an amount of settlement when a structure is constructed on it.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种用于减少沉降量的打桩基础的施工方法。 解决方案:桩14在建筑部分被驱动到地面上。 接下来,将基座10直接安装在基座10上,以使桩14的头突出于桩架12之外。插座接收器18用桩螺栓26与桩14接合。一种用于将桩14 插座接收器18可以是诸如焊接的其它方法。 在千斤顶30直接在千斤顶接收器18和基座10之间布置之后,通过千斤顶向该拉出方向施加力。 通过由桩14的周面上的摩擦力产生的反作用力将沉降载荷(预载)直接施加在基础10上。最后,基础10和桩14彼此直接连接并相互集成 通过钢筋32构造用于在其上构造结构时减少沉降量的起绒基础。 版权所有(C)2006,JPO&NCIPI
    • 7. 发明专利
    • Bridge structure and its construction method
    • 桥梁结构及其施工方法
    • JP2006022518A
    • 2006-01-26
    • JP2004200131
    • 2004-07-07
    • East Japan Railway Co東日本旅客鉄道株式会社
    • NOZAWA SHINICHIROFUJISAWA HAJIMEHOSHINO TADASHI
    • E01D21/00E01D19/02
    • PROBLEM TO BE SOLVED: To provide a bridge structure and its construction method securing a head clearance of a bridge, shortening workhours for new construction work and improvement work of the bridge, coping with a narrow working space, reducing a construction cost, having high durability and minimizing the suspension of traffic of a road or the like under the bridge.
      SOLUTION: In this bridge structure, the bridge is composed of an upper structure and a lower structure, and steel fitting joints of approximately C-shaped cross section are continuously provided at the lower end of the upper structure and the upper end of the lower structure. The steel fitting joints of the upper structure and lower structure are slid and fitted to integrate the upper structure and the lower structure.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种确保桥梁头部间隙的桥梁结构及其施工方法,缩短新建筑工程的工作时间和桥梁的改善工作,应对狭窄的工作空间,降低施工成本, 具有很高的耐用性,并使桥下的道路等的交通量的悬挂最小化。 解决方案:在这种桥梁结构中,桥梁由上部结构和下部结构组成,大致C形横截面的钢管接头连续设置在上部结构的下端,上端 较低的结构。 上部结构和下部结构的钢管接头滑动并嵌合以整合上部结构和下部结构。 版权所有(C)2006,JPO&NCIPI
    • 8. 发明专利
    • Construction method of tip-reinforced cast-in-place concrete pile, injection bag, and steel frame
    • 钢筋混凝土桩,注射袋和钢框架的施工方法
    • JP2005194766A
    • 2005-07-21
    • JP2004001632
    • 2004-01-07
    • East Japan Railway Co東日本旅客鉄道株式会社
    • HOSHINO TADASHIFUJISAWA HAJIME
    • E02D5/34
    • PROBLEM TO BE SOLVED: To cope with a construction method causing accumulation of much slime, or the case of an enlarged diameter pile, a pile with much outbreak, or the like, to dissolve intrusion of slime or concrete coming around to the back face of an injection bag, to positively reinforce the ground around the tip of the pile and to be applicable also to an already proposed construction method.
      SOLUTION: In this construction method of a tip-reinforced cast-in-place concrete pile, a reinforcing cage fitted at its tip with a steel frame 3 with an injection bag installed at the bottom part, is erected in an excavated hole, and the steel frame is crushed at a bending point P at the pile bottom to spread the injection bag to the pipe bottom. An injection material is thereby pressure-injected to pressurize and compress the ground around the tip of the pile. The steel frame has an injection bag extension arm extending outward from the bending point P when crushed.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了解决造成泥土积聚的施工方法,或者是直径较大的桩的情况,具有大量爆发的桩等,以将粘土或混凝土的入侵溶解到 注射袋的背面,积极地加固桩的尖端周围的地面,并且也适用于已经提出的施工方法。 解决方案:在这种顶尖加固现浇混凝土桩的施工方法中,安装在其顶端的加固笼与安装在底部的注射袋的钢框架3竖立在挖掘孔中 ,并且在框底部的弯曲点P处将钢框架压碎,以将注射袋扩展到管底。 因此,注射材料被压力注射以对桩周围的地面加压和压缩。 钢框架具有从压弯点P向外延伸的注射袋延伸臂。 版权所有(C)2005,JPO&NCIPI
    • 9. 发明专利
    • Pile hole digging device and pile hole digging construction method
    • 桩孔钻孔装置和桩孔施工方法
    • JP2005023773A
    • 2005-01-27
    • JP2003314971
    • 2003-09-08
    • East Japan Railway Co東日本旅客鉄道株式会社
    • NOZAWA SHINICHIROFUJISAWA HAJIMEHOSHINO TADASHI
    • E21B10/32E02D7/00E21B11/00
    • PROBLEM TO BE SOLVED: To dig a pile hole having a diameter expanded part by a simple configuration.
      SOLUTION: A sliding shaft 33 is slidably attached along a rotary digging shaft 31 provided with a cutter 32 in a lower end part, and an auxiliary cutter 34 protruding on a side of the cutter 32 and turnable in substantially vertical face so that it is stored above the cutter 32 is provided. The sliding shaft 33 and the auxiliary cutter 34 are mutually connected by a link mechanism 35, and the sliding shaft 33 rises for the rotary digging shaft 31 to protrude the auxiliary cutter 34 from the side of the cutter 32. The auxiliary cutter 34 has a peripheral face cutter part 341 whose sideway protrusion amount becomes large gradually when going downward in a condition in which it protrudes on the side of the cutter 32 to dig a peripheral face of the pile hole and expand diameter and a lower face cutter part 342 digging a lower face of the diameter expanded part dug by the peripheral face cutter part. A peripheral face of the pile hole is dug by the auxiliary cutter 34 protruding on the side of the cutter 32 to expand diameter in a conical shape and dig a lower face of the diameter expanded part simultaneously.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过简单的构造挖掘具有直径扩大部分的桩孔。 解决方案:滑动轴33沿着设置在下端部中的切割器32的旋转挖掘轴31可滑动地附接,以及辅助切割器34,其在切割器32的一侧突出并且可基本垂直的面转动,使得 存储在切割器32上方。 滑动轴33和辅助切割器34通过连杆机构35相互连接,并且滑动轴33上升用于旋转挖掘轴31,以使辅助切割器34从切割器32的侧面突出。辅助切割器34具有 在切割器32侧突出的状态下向下方侧边突出量逐渐变大的周边切割器部341,挖掘绒毛孔的外周面和展开直径,下面切割部342挖掘 通过外周面切割器部分挖出直径扩大部分的下表面。 通过在切割器32侧突出的辅助切割器34挖出绒头孔的外周面,以将直径扩大为圆锥形,同时挖掘直径扩大部的下表面。 版权所有(C)2005,JPO&NCIPI