会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 9. 发明授权
    • Roofing system and method
    • 屋顶系统和方法
    • US07028438B2
    • 2006-04-18
    • US10188940
    • 2002-07-03
    • Brad C. Burdic
    • Brad C. Burdic
    • E04B5/00
    • E04D13/16
    • A roofing system for a roof deck able to retain mechanical fasteners includes a layer of roof insulation boards overlaying the roof deck and a plurality of spaced apart hold-down straps overlaying the roof insulation boards. The hold-down straps have pre-formed mechanical fastener openings therethrough on preselected center to center spacings and mechanical fasteners pass down through the mechanical fastener openings in the hold-down straps, through the roof insulation boards, and into the roof deck to secure the roof insulation boards to the roof deck. Preferably, the roof insulation boards each have guidelines thereon for placement of the hold-down straps relative to the roof insulation board.
    • 用于能够保持机械紧固件的屋顶板的屋顶系统包括覆盖屋顶板的顶层绝缘板层和覆盖屋顶绝缘板的多个间隔开的压紧带。 压紧带具有预先形成的机械紧固件开口,其预选中心到中心间隔,并且机械紧固件向下穿过压紧带中的机械紧固件开口,穿过屋顶绝缘板,并进入屋顶板,以固定 屋顶保温板到屋顶甲板。 优选地,屋顶绝缘板各自具有用于相对于屋顶绝热板放置压紧带的指导。