热词
    • 2. 发明专利
    • Method and system for removing sediment from dam
    • 从DAM中移除SEDIMENT的方法和系统
    • JP2006200168A
    • 2006-08-03
    • JP2005011128
    • 2005-01-19
    • Taisei Corp大成建設株式会社
    • NOBUTOMO SUEOMIYAYAMA NORIAKIWADA SHOZOKUSUMI MASAYUKIMUNEMORI NOBUOWATANABE KOICHI
    • E02B8/00
    • PROBLEM TO BE SOLVED: To provide a method and a system for removing sediment from a dam, which enable the removal of the sediment with a large grain size, and which hardly cause a rise in a river bed of a river downstream from a dam body.
      SOLUTION: This system 1 for removing the sediment from the dam, which removes the sediment (sediment T) accumulated in the dam storage reservoir L of the dam D constructed in the river R, comprises: a dredger 2 which serves as a sediment sampling means for sampling the sediment T; sediment conveying equipment 3 for conveying the sediment T from the dredger 2; a sediment crushing plant 4 which serves as a sediment crushing means for crushing the sediment T; and fine-sand conveying equipment 5 for conveying fine sand S to a planned sediment area A which is provided directly upstream of the dam D from the plant 4.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种从大坝中去除沉积物的方法和系统,其能够以大的粒度去除沉淀物,并且几乎不引起下游河流的河床上升 一个坝体。 解决方案:用于清除大坝沉积物的系统1,其去除在河R中构建的大坝D的蓄水库L中积聚的沉积物(沉积物T),包括:作为 沉积物采样装置用于取样沉积物T; 泥沙输送设备3用于从挖泥船2输送沉淀物T; 沉渣破碎装置4,用作粉碎沉淀物T的沉渣破碎装置; 和细沙输送设备5,用于将细砂S输送到从工厂4直接设在坝D上游的计划的沉积区域A.版权所有(C)2006,JPO&NCIPI
    • 3. 发明专利
    • CONSTRUCTION METHOD OF CONTINUOUS UNDERGROUND WALL
    • JPH10204872A
    • 1998-08-04
    • JP2107997
    • 1997-01-20
    • TAISEI CORP
    • MIYAYAMA NORIAKI
    • E02D5/20
    • PROBLEM TO BE SOLVED: To facilitate boring for grout working and make a stiff structure by using a grout pipe for at least a part of frame material for continuos underground wall construction. SOLUTION: A frame skeleton is constituted of a dry excavation frame skeleton 1 and a body part flame skeleton 2. The dry excavation part frame skeleton 1 is used in a case where the construction planned ceiling end of a continuos underground wall is lower than the site ground. The body part frame skeleton 2 is a frame skeleton which is the body part of the continuos underground wall, is composed of a frame material 3 as a main girder, inclination material 4 connecting the frame materials 3, and a horizontal material 5 for horizontally connecting the frame materials 3. A part or the whole of the frame material 3 is constituted of a grout pipe with a bottom cover composed of a thin iron plate, after construction of the continuos underground wall the frame material 3 is used to perform grout in the foundation bedrock of the continuos underground wall edge. A partition iron plate 6 is integrally framed with the horizontal material 5 on both the ends of the body part frame skeleton 2.