会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Device and method for stabilizing system
    • 用于稳定系统的装置和方法
    • JP2011041354A
    • 2011-02-24
    • JP2009184133
    • 2009-08-07
    • Chubu Electric Power Co IncHitachi Ltd中部電力株式会社株式会社日立製作所
    • SEKOGUCHI MASAHIROFUKUI CHIHIROKUROSAWA KOICHICHO KENSUZUKI KOJIHIRANO DAIGOSHIMOMURA KIMIHIKO
    • H02J3/24H02J3/00H02J3/16
    • Y02E40/34
    • PROBLEM TO BE SOLVED: To solve a phase angle stability problem and a voltage problem since a bus voltage of a substation over-rises due to a fluctuation of a phase angle inside a generator by a disturbance of the generator and a large fluctuation of a power line stream if power limit control is performed when a system breaks down although a large amount of power capacitors are used for maintaining a bus voltage of the substation at stationary time in the power system transmitting a power from a large capacity power supply at a remote place. SOLUTION: A system stabilizing device is provided with database storing data obtained by previously calculating a power control amount at the power station at an assumed accident and a phase modification control amount at the substation operating/interrupting a phase modification facility by using an electric circuit model of the electric system and online data. The device is provided with a restoration/confirmation means for a reduction gradient of phase angle fluctuation of the generator and a substation bus voltage at the system accident by a previous operation. When fault information of the system is received, phase modification control is performed based on the substation phase modulation control amount corresponding to the fault which is read from the database and data on its execution timing. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了解决由于发电机的干扰引起的发电机内相位角的波动,变电站的母线电压的波动过大以及波动大的问题, 如果在系统故障时执行功率限制控制,则在电力系统中从大容量电源传输电力的情况下,在大量电力系统中使用大量的功率电容器来维持变电站的总线电压在静止时间, 一个偏远的地方。 解决方案:系统稳定装置具有数据库存储数据,所述数据库存储数据是通过预先计算假设事故时在发电站处的功率控制量和变电站的相位修改控制量而操作/中断相位修改设备而获得的, 电气系统电路模型和在线数据。 该装置具有恢复/确认装置,用于通过先前的操作在系统事故期间发生发电机的相位角波动的减小梯度和变电站总线电压。 当接收到系统的故障信息时,根据与从数据库读取的故障对应的变电站相位调制控制量及其执行定时数据,进行相位修正控制。 版权所有(C)2011,JPO&INPIT
    • 2. 发明专利
    • Apparatus and method for system stabilization
    • 用于系统稳定的装置和方法
    • JP2010233314A
    • 2010-10-14
    • JP2009076815
    • 2009-03-26
    • Chubu Electric Power Co Inc中部電力株式会社
    • SHIMOMURA KIMIHIKOHIRANO DAIGOSUZUKI KOJI
    • H02J3/24H02J3/38
    • PROBLEM TO BE SOLVED: To allow a drop of voltage in a power transmission line to be within a permissible range after removing failure. SOLUTION: An apparatus is provided for system stabilization in the power transmission system formed by interconnecting a group of generators each functioning as a power supply unit to a main system via the power transmission line. The apparatus includes: a preliminary operation device for previously operating a first power supply control amount of (a) and a second power supply control amount of (b) for each of failure patterns, where each failure pattern is defined as a pattern in non-route disconnection failure assumed in the power transmission system; a data table for storing each total power control amount of (c) in accordance with each of the failure patterns; and a power supply control execution device for reading a total power supply control amount corresponding to a generated non-route disconnection failure from the data table on the condition that the non-route disconnection failure occurs in the power transmission line, and controlling the power supply of the group of generators on the basis of the read total power supply control amount. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:在去除故障之后,允许输电线路中的电压下降到允许的范围内。 解决方案:提供一种用于在通过电力传输线将各自用作电力供应单元的发电机组连接到主系统的电力传输系统中的系统稳定装置。 该装置包括:预先操作第一电源控制量(a)的预备操作装置和用于每个故障模式的每个故障模式的(b)的第二电源控制量,其中每个故障模式被定义为非易失性模式, 输电系统中假设路由断线失败; 数据表,用于存储根据每个故障模式的(c)的总功率控制量; 以及电源控制执行装置,用于在所述电力传输线路中发生所述非路线断线故障的情况下,从所述数据表读取与所生成的非路线断线故障相对应的总电力供给控制量,并且控制所述电源 基于读取的总电源控制量的发电机组。 版权所有(C)2011,JPO&INPIT
    • 3. 发明专利
    • Power system stabilizing apparatus and method of controlling the same
    • 电力系统稳定装置及其控制方法
    • JP2011135688A
    • 2011-07-07
    • JP2009292537
    • 2009-12-24
    • Chubu Electric Power Co IncToshiba Corp中部電力株式会社株式会社東芝
    • SHIMOMURA KIMIHIKOMAEKAWA KAZUOHIRANO DAIGOSUZUKI KOJIKIMURA MISAOKOMATA KAZUYANAKAMURA TADASHIKAJIWARA TOSHIYUKI
    • H02J3/24H02J3/00
    • PROBLEM TO BE SOLVED: To obtain a power system stabilizing apparatus capable of stabilizing both frequencies and voltages of a separate system, and to provide a method of controlling the same.
      SOLUTION: At a control execution unit 29, two-staged control, i.e., first-stage control and second-stage control, is sequentially carried out. A second-stage control selection unit 24 selects either disconnection of generators 1a to 1c or loads 5a to 5c or disconnection or connection of phase modifying devices 6a to 6c as control operation in the second-stage control based on the following combination: a combination of the plus or minus of a frequency variation and the plus or minus of a voltage variation obtained when a certain time has passed after the execution of the first-stage control. Each operation amount in the second-stage control is computed by a correction effective power control computation unit 25, a correction reactive power control computation unit 26, an emergency effective power control computation unit 27, and an emergency reactive power control computation unit 28.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了获得能够稳定单独系统的频率和电压的电力系统稳定装置,并且提供一种控制它的方法。 解决方案:在控制执行单元29处,依次执行两级控制,即第一级控制和第二级控制。 第二级控制选择单元24基于以下组合,选择发电机1a至1c的断开或负载5a至5c或相位修改设备6a至6c的断开或连接作为第二级控制中的控制操作:组合 频率变化的加或减,以及在执行第一级控制之后经过一定时间时获得的电压变化的正负。 校正有效功率控制计算单元25,校正无功功率控制计算单元26,紧急有功功率控制计算单元27和紧急无功功率控制计算单元28来计算第二级控制中的每个操作量。 P>版权所有(C)2011,JPO&INPIT
    • 4. 发明专利
    • Apparatus and method for system stabilization
    • 用于系统稳定的装置和方法
    • JP2010233319A
    • 2010-10-14
    • JP2009076913
    • 2009-03-26
    • Chubu Electric Power Co Inc中部電力株式会社
    • SHIMOMURA KIMIHIKOHIRANO DAIGOSUZUKI KOJI
    • H02J3/24
    • PROBLEM TO BE SOLVED: To allow a rise of voltage in a power transmission line to be within a permissible range by quickly executing phase modification control after removing failure. SOLUTION: An apparatus is provided for system stabilization in the power transmission system interconnects a group of generators functioning as a power supply to a main system via a power transmission line and includes a phase modification facility for supplying a reactive power to a line. The apparatus includes: a previous operating device for previously operating a power supply control amount of (a) and a phase modification control amount of (b) for each of failure patterns, a data table for storing the power supply control amount and the phase modification control amount in association with each of the failure patterns; a power supply control executing device for reading the power supply control amount corresponding to the generated non-route disconnection failure from the data table on condition that the non-route disconnection failure is generated in the power transmission line, and controlling the power supply of the group of generators on the basis of the read power supply control amount; and a phase modification executing device for reading a phase modification control amount corresponding to the generated non-route disconnection failure from the data table on condition that the non-route disconnection failure is generated on the power transmission line, and controlling the phase modification amount of the phase modification facility on the basis of the read phase modification control amount. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:通过在消除故障之后快速执行相位改变控制,允许输电线路中的电压上升到容许范围内。 解决方案:在电力传输系统中提供用于系统稳定的装置,通过电力传输线将用作电源的一组发电机与主系统相互连接,并且包括用于向线路提供无功功率的相位修改设备 。 该装置包括:用于预先操作每个故障模式的(a)的电源控制量和(b)的相位修改控制量的先前操作装置,用于存储电源控制量和相位修改的数据表 控制量与每个故障模式相关联; 电源控制执行装置,用于在电力传输线中产生非路线断线故障的条件下从数据表中读出与所生成的非路由断开故障相对应的电源控制量,并且控制电源控制执行装置的电源 基于读取电源控制量的发电机组; 以及相位修改执行装置,用于在所述输电线上产生非路线断线故障的条件下,从所述数据表中读出与所生成的非路线断线故障相对应的相位修正控制量, 基于读取相位修改控制量的相位修改设备。 版权所有(C)2011,JPO&INPIT
    • 5. 发明专利
    • System stabilization system
    • 系统稳定系统
    • JP2011024374A
    • 2011-02-03
    • JP2009169001
    • 2009-07-17
    • Chubu Electric Power Co IncMitsubishi Electric Corp三菱電機株式会社中部電力株式会社
    • SASAKI TAKASHIKOWADA YASUYUKIMAEDA TORUSHIMOMURA KIMIHIKOHIRANO DAIGOSUZUKI KOJIMAEKAWA KAZUO
    • H02J3/00H02J9/08
    • PROBLEM TO BE SOLVED: To provide a system stabilization system in which high speediness which is a strong point of a pre-calculation method and flexibility which is a strong point of a post-calculation method are effectively combined. SOLUTION: The system stabilization system stabilizes a power system by controlling a power generator in conformity with the situation of an accident when an accident occurs in the power system. When the accident occurs in the power system, main control is performed based on the control table obtained by performing pre-simulation related to the pre-assumed accident case using the pre-calculation method, and correction control is performed by using the post-calculation method after execution of the main control based on the result obtained by measuring an actual system phenomenon after occurrence of the accident when the control amount is short in the main control. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种系统稳定系统,其中作为计算后方法的强点的预计算方法和灵活性的强点的高速度被有效地组合。 解决方案:系统稳定系统通过在电力系统发生事故时根据事故情况控制发电机,稳定电力系统。 当在电力系统中发生事故时,基于通过使用预先计算方法执行与预先假设的事故情况相关的预模拟而获得的控制表执行主控制,并且通过使用后期计算执行校正控制 基于通过在主控制中的控制量短而测量发生事故后的实际系统现象得到的结果,执行主控制之后的方法。 版权所有(C)2011,JPO&INPIT
    • 6. 发明专利
    • System and method for controlling system stabilization
    • 用于控制系统稳定的系统和方法
    • JP2010057253A
    • 2010-03-11
    • JP2008218668
    • 2008-08-27
    • Chubu Electric Power Co IncMitsubishi Electric Corp三菱電機株式会社中部電力株式会社
    • SASAKI TAKASHIKOWADA YASUYUKIMAEDA TORUKOBAYASHI RYOJITAKEUCHI AKIRASHIMOMURA KIMIHIKO
    • H02J3/24
    • PROBLEM TO BE SOLVED: To perform control operation, using the data during accidents, in a system stabilization control system for stabilizing a power system. SOLUTION: When an accident occurs in the power system and the accident removal by main protection is not performed and reaches a back-up protective operation, this system accumulates data related to the output of a generator or the active power of a transmission line during the accident, and also estimates a P-δ curve during the accident or after removal of the accident, by using the information on the phase angle (δ) of the generator computed from the accumulated data and the accumulated information on the output (P E ) of the generator; computes acceleration energy (VA) and deceleration energy (VD) from the estimated P-δ curve; discriminates the stability from the comparison of magnitude between computed VA and VD, and breaks the generator, when the system is unstable. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:在系统稳定控制系统中进行控制操作,在事故期间使用数据,以稳定电力系统。

      解决方案:当电力系统发生意外事故,并且不进行主保护事故消除并进行备用保护动作时,该系统累积与发电机的输出或变速器的有功功率有关的数据 并且还通过使用从累积数据计算的发电机的相位角(δ)和输出上的积累信息(δ)的信息来估计事故期间或事故消除后的P-δ曲线( 发电机的P E ); 从估计的P-δ曲线计算加速能量(VA)和减速能(VD); 鉴别稳定性与计算的VA和VD之间的幅度比较,并且当系统不稳定时中断发生器。 版权所有(C)2010,JPO&INPIT