热词
    • 1. 发明专利
    • Continuous wall construction method
    • 连续墙施工方法
    • JP2005105727A
    • 2005-04-21
    • JP2003342877
    • 2003-10-01
    • Chem Grouting Co LtdTokyo Kizai Kogyo Kkケミカルグラウト株式会社東京機材工業株式会社
    • SHIBAZAKI MITSUHIROYOSHIDA HIROSHITANAKA TATSUOUEMURA KANENOSUKEIWASHITA MIKI
    • E02F5/02E02D5/18E02D5/20
    • PROBLEM TO BE SOLVED: To provide a continuous wall construction method for building a good continuous wall by allowing the cutting of concrete end faces for accurate and good joint between a concrete placed in a preceding drilled groove and a concrete placed in a following drilled groove.
      SOLUTION: The continuous wall construction method comprises a step of using a drilling means B for drilling (Fig.2, not illustrated), a step of using the drilling means B for gripping a removal mounting means A having a removing means for removing sediment C and deteriorating concrete Cf (Fig.3, not illustrated), and a step of inserting the drilling means B gripping the removal mounting means A into the following drilled groove H2 for removing the sediment G and the deteriorating concrete Cf with the removing means D, N of the removal mounting means A (Fig.4, not illustrated).
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种连续的墙面施工方法,用于通过允许切割混凝土端面以在放置在先前钻孔中的混凝土和放置在以下的混凝土中的混凝土之间进行精确和良好的接合来建造良好的连续壁 钻槽

      解决方案:连续壁施工方法包括使用钻孔装置B进行钻孔的步骤(图2,未示出),使用钻孔装置B夹持移除装置A的步骤, 除去沉淀物C和劣化混凝土Cf(图3,未示出),以及将夹持拆卸安装装置A的钻孔装置B插入随后的钻孔H2中以除去沉淀物G和劣化混凝土Cf的步骤, 表示去除安装装置A的D,N(图4,未示出)。 版权所有(C)2005,JPO&NCIPI

    • 2. 发明专利
    • Construction method of continuous wall
    • 连续墙施工方法
    • JP2004346554A
    • 2004-12-09
    • JP2003142868
    • 2003-05-21
    • Chem Grouting Co LtdTokyo Kizai Kogyo Kkケミカルグラウト株式会社東京機材工業株式会社
    • SHIBAZAKI MITSUHIROYOSHIDA HIROSHIYOKOO MITSURUIWASHITA MIKI
    • E02D5/20
    • PROBLEM TO BE SOLVED: To provide a construction method of a continuous wall for constructing an excellent continuous wall by allowing cutting of a concrete end face in a conventionally non-cuttable region to positively join concrete placed in a preceding hole, well to concrete placed in a succeeding hole. SOLUTION: This construction method has a cutting process for cutting the end face Fc by jetting a high pressure fluid jet J from a jetting means N provided at an excavating means B, toward the end face Fc of a consolidating material placed in the preceding hole H1. In the cutting process, the high pressure fluid jet J is jetted toward the end face Fc of the consolidating material in a region below the excavating means B, and the jetting means N is operated to move a collision part of the high pressure fluid jet J from the region below the excavating means B to a region on the same level as the jetting means N. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供一种通过允许在常规不可切割区域中切割混凝土端面以连接放置在前一孔中的混凝土的连续壁的构造连续壁的施工方法,以至于 混凝土放在一个后续的洞里。 解决方案:该施工方法具有通过从设置在挖掘装置B处的喷射装置N向设置在挖掘装置B中的固结材料的端面Fc喷射高压流体喷射J而切割端面Fc的切割工艺 前孔H1。 在切割过程中,高压流体射流J在挖掘装置B下方的区域朝向固结材料的端面Fc喷射,并且喷射装置N被操作以移动高压流体射流J的碰撞部分 从挖掘装置B下方的区域到与喷射装置N相同水平的区域。版权所有(C)2005,JPO&NCIPI
    • 3. 发明专利
    • Liquid storage tank
    • 液体储存罐
    • JP2013035599A
    • 2013-02-21
    • JP2012037495
    • 2012-02-23
    • Tokyo Kizai Kogyo Kk東京機材工業株式会社
    • IWASHITA MIKI
    • B65D88/06E04H7/06
    • PROBLEM TO BE SOLVED: To provide a liquid storage tank which can be transported within a transportation limit of a transportation means and can achieve a volume exceeding the transportation limit at an installation site.SOLUTION: Tubular members 111-114 are sequentially stacked and are mutually jointed by mechanical coupling tools at joint parts 151-153. Each of the tubular members 111-114 is divided into split pieces 131-134, and the split pieces 131-134 are mutually jointed by the mechanical coupling tools. The bottom plate part 3 is divided into bottom-plate split pieces 311-315, and the bottom-plate split pieces 311-315 are mutually jointed by the mechanical coupling tools and joined to a bottom part of the tube part 1 by mechanical coupling tools. A cover part 5 is divided into cover split pieces 511-515, and the cover split pieces 511-515 are mutually joined by mechanical coupling tools and are attached to the upper part of the tube part 1.
    • 要解决的问题:提供一种可在运输工具的运输限制内运输的液体储罐,并可达到超过安装地点运输限制的体积。 解决方案:管状构件111-114依次堆叠,并通过联接部件151-153处的机械联接工具相互连接。 每个管状构件111-114分成分割片131-134,并且分割片131-134由机械联接工具相互连接。 底板部3被分割成底板分割片311-315,底板分割片311-315由机械连接工具相互接合,并通过机械连接工具连接到管部1的底部 。 盖部分5被分成盖分割片511-515,并且盖分割片511-515通过机械联接工具相互连接并且被附接到管部分1的上部。(C) 2013年,JPO&INPIT
    • 4. 发明专利
    • Tumbling device
    • JP2004149266A
    • 2004-05-27
    • JP2002316742
    • 2002-10-30
    • Tokyo Kizai Kogyo Kk東京機材工業株式会社
    • IWASHITA MIKI
    • B66F7/22B66F7/28
    • PROBLEM TO BE SOLVED: To provide a tumbling device capable of tumbling safely such a heavy object as not to be moved by a human force when the object is subjected to such processes as washing, coating, parts assembling, and machining.
      SOLUTION: The tumbling device includes a bottom bearing part 12 which receives the bottom of the object P to be tumbled, an opening/closing device 5 hitched at the object P by its one end on the rear when viewed in the rotating direction A1. A side face bearing part 11 receives the side face of the object P, and its bottom is fixed to the bottom bearing part 12 at the other end opposite the mentioned end of the bottom bearing part 12, and is furnished at the top with an opening/closing device 4 to be hitched at the object P. The bottom bearing part 12 and the side face bearing part 11 constitute an object placing space whose side opposite the bottom bearing part 12 is left open. A drive device 3 put a moving body 1 in shaft rotation. A working robot 7 is mounted on the moving body 1.
      COPYRIGHT: (C)2004,JPO
    • 7. 发明专利
    • INTERLOCKING PIPE
    • JPS6319322A
    • 1988-01-27
    • JP16128686
    • 1986-07-08
    • TOKYO KIZAI KOGYO KK
    • IWASHITA MIKI
    • E02D5/18
    • PURPOSE:To prevent the cracking of an interlocking pipe, reduce the weight of the pipe, and make easier the handling of the pipe by a method in which the second coupler of other pipe is inserted into the space between the first couplers of the interlocking pipe and connected by a connecting pin. CONSTITUTION:The first couplers 10 and 11 are provided with a spacing by a mutually facing manner in the one-end inside 91 of a pipe body 9, and the second coupler 14 of a smaller thickness than the aperture between the couplers 10 and 11 is provided in the inside of the other end side in such a way as to project it to the axial outside through the inside 91. The coupler 14 of the pipe A is fitted into the space between the couplers 10 and 11 of the pipe B and the pipes A and B are connected by inserting a connecting pin 17 into pin holes 13 and 141. The load is received by the couplers 10, 11, and 14, but not by the peripheral wall of the pipe body 9, so that the load can be uniformly dispersed to the pipe body 9 through the couplers 10, 11, and 14.