会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • Battery communication system
    • 电池通讯系统
    • US20050184593A1
    • 2005-08-25
    • US11090731
    • 2005-03-25
    • Peter GottliebRodger Dowdell
    • Peter GottliebRodger Dowdell
    • G01R31/36H02J7/00H02J9/06
    • G01R31/3648G01R31/3658H02J7/0021H02J9/062Y10T307/615Y10T307/625
    • An uninterrupted power supply (“UPS”) system is disclosed which uses a battery communication system to communicate to a UPS processor information concerning the status of a battery pack in an array of parallel coupled battery packs. The battery packs provide back-up power for the UPS system. Information about the battery packs is collected by a monitor associated with each of the battery packs. The monitors measure battery pack voltage, currents and temperature and compile information about the battery pack from the measured values. Each monitor prepares a data word representing information about its battery pack. The data words are transmitted to the UPS in response to commands issued by the UPS processor to the monitors.
    • 公开了一种不间断电源(“UPS”)系统,其使用电池通信系统来向UPS处理器传送与并联电池组的阵列中的电池组的状态有关的信息。 电池组为UPS系统提供备用电源。 关于电池组的信息由与每个电池组相关联的监视器收集。 显示器测量电池组电压,电流和温度,并根据测量值编制有关电池组的信息。 每个监视器准备一个表示其电池组信息的数据字。 响应于UPS处理器向监视器发出的命令,将数据字传输到UPS。
    • 5. 发明申请
    • GRID LOAD SYNCHRONIZATION DEVICE AND METHOD
    • 网路负载同步装置及方法
    • US20130116844A1
    • 2013-05-09
    • US13513024
    • 2010-12-03
    • John M. McNallyPeter Gottlieb
    • John M. McNallyPeter Gottlieb
    • H02J3/14
    • H02J3/14H02J3/08H02J3/32Y02B70/3225Y04S20/222
    • The grid load synchronization system described herein permits proactive mitigation of the effects of large loads transitioning on and off the power grid and the resultant risks and power quality issues associated therewith. The disclosed proactive system permits a grid-connected power consumer to synchronize demand with power storage equipment in real time using a digital communication link. The power consumer transmits requests to bring a load online or offline to a control site. The control site coordinates power grid source(s) and power grid loads to maintain power quality when loads go on and offline. The control sites manage requests from multiple power consumers and schedule the various loads for the consumers to mitigate the effects of large loads transitioning on and off the power grid. The resulting power quality can be guaranteed when adequate battery resources are made proactively available, rather than reacting to line conditions to engage compensation actions.
    • 本文描述的电网负载同步系统允许主动减轻大电力负载过渡电网的影响以及由此产生的风险和电力质量问题。 所公开的主动系统允许并网电力消费者使用数字通信链路实时地同步电力存储设备的需求。 电力消费者传送请求以将在线或离线的负载带到控制站点。 控制站点协调电网源和电网负载,以便在负载上下电时保持电源质量。 控制站点管理来自多个电力消费者的请求,并为消费者安排各种负载,以减轻负载过大和过电网的大负载的影响。 当主动获得足够的电池资源时,可以保证所产生的电力质量,而不是对线路条件作出反应以采取补偿行动。